Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 1 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  2   Mon Sep 30 11:04:15 2019 Cristinaleak checkCryo collimator 11-1-18-8   24.09.2019DONEAccepted25.09.2019Customised25.09.2019Accepted26.09.2019L. Bozyk    
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the
wrong heating jackets
 Laser_chamber.jpg 
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19HillenbrandThe chamber was brought in the lab without
heating jackets, which where shipped on the
17.10.
Conditionally Accepted because the
 Recoil_ESR_chamber.jpg 
  5   Mon Sep 30 14:00:51 2019 Cristinapumping speed800 l/s Agilent   20.09.2019DONEAccepted1Test:7.10.2019; 2Test: 14.11.2019Fischer-Mommsen1.11.19Cond. Accep. Sent back to AgilentPumping Speed measured a bit lower than stated   
  6   Mon Sep 30 14:04:43 2019 Cristinapumping speedCombi pump DN40   09.08.2019DONEAccepted20.08.2019Fischer-Mommsen20.09.2019Accepted Sent back to Agilent   Agilent_combi_DN40.jpg 
  7   Mon Sep 30 14:06:07 2019 Cristinapumping speedSlim SIP 150   9.08.2019DONEAccepted07.02.2020Fischer-Mommsen06.03.2020Accepted     Comparison.jpg 
  8   Wed Oct 9 07:55:47 2019 Pheleak checkAll metal gate valve (Bender)   08.10.2019DONEAccepted21.10.2019Customised24.10.2019Accepted24.10.2019M.BenderLeak check required by Markus Bender for a
"all metal gate valve".  The gate valve was
received on the 08.10.2019.  No deadline.
 All_metal_valve.jpg 
  9   Wed Oct 9 07:57:44 2019 Phetest with bakeoutCryring Detector Tube    09.10.2019DONEAccepted10.10.2019Setup 122.10.2019Accepted24.10.2019SpillmannDetector tube has been received from Grossmontage
(given to Andreas Kraemer).  This Detector
tube is for Cryring - measurement request
 20191008_094940.jpg 
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19GiacominiMacor samples have been received from Tino
Giacomini on the 02.10.2019.  These Macor
samples will be used for IPM chamber.  The
  
  11   Wed Oct 9 14:19:09 2019 Phetest with bakeoutScrapper for ESR (for Markus Steck)   09.10.2019DONEAccepted14.10.2019Setup 218.10.2019Accepted24.10.2019SchwarzMeasurements asked as "urgent" for ESR. This
piece was already measured in 2014, and then
stored in an unkwon place.
 ESR-Scraper.jpg 
  12   Mon Oct 14 10:08:14 2019 Cristinaleak checkDipole chamber SIS100 First charge   10.10.2019DONEAccepted11.10.2019Customised29.11.2019Accepted Stored in the TH6 dipole received on the KW41. Integral leak
check and 1 test without bakeout
After the
vacuum test the chambers must be inserted
  
  13   Mon Oct 14 10:09:36 2019 Cristinaleak checkRoughing CWT 3 charge   10.10.2019DONEAccepted14.10.2019Customised14.11.19Accepted Stored in WeiterstadtIntegral leak check to be done for all CWT.

DONE:
07-51-23-0; 07-51-26-1; 07-51-30-8;
07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6
 CWT.jpg 
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01;
11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9;
11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4;
 criocollimator.jpg 
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.SchröterTube to be coated for HD. After the first
coating: PEELING. STOP and waiting for the
nextstep to be decided in HD.
We cleaning
 HD_tube.jpg 
  Draft   Thu Oct 24 14:55:28 2019 Toni                  
  Draft   Thu Oct 24 14:58:25 2019 Toni                  
  18   Fri Nov 1 10:41:45 2019 Cristinatest with bakeoutIPM Chamber   4.09.2019DONERefused   Refused1.11.19AngeloBellows to short   
  19   Fri Nov 8 10:52:43 2019 Cristinatest with bakeoutMacor 2 for IPM   8.11.19DONEAccepted11.11.2019Mobile 218.11.2019Accepted04.12.19T. Giacomini    
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  Broken gauge (cold cathode gauge).     
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/AWide range gauge is now installed on the chamber.
 The previous test with cold cathode gauge
failed due to broken gauge.  

Another
  