Entry  Fri Nov 22 11:07:36 2019, Phe, test without bakeout, Beam Diagnostic Chambers from India for HEBT - small one, , , , unknown, DONE, Refused, 09.01.2020, Customised, 10.01.2020 - still pumping, Accepted, 15.01.20, Mahr Rainer 

Inside of the chamber is dirty (black mark when wiped with tissue).

At the moment (16.12.2019), the chamber is under cleaning.

Chamber has been
cleaned on the 18.12.2019, stored in the Testing Halle.

Vacuum acceptance test on the chamber - started on the 09.01.2020.
Entry  Fri Nov 22 11:08:19 2019, Phe, test with bakeout, SEM-Monitor for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 2, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian foto.jpg
 
Entry  Fri Nov 22 11:09:19 2019, Phe, test with bakeout, Grid for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 1, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian 
 
Entry  Fri Nov 22 11:09:59 2019, Phe, Other, Septum SIS100 - NEG coated chamber, End 2019, Delayed, , unknown, TO COME, , , , , , ,  
 
Entry  Fri Nov 22 11:10:33 2019, Phe, test with bakeout, Dipole Chambers for SIS100 (2box), 25.11.19, Delayed, Unknown, 17.01.20, DONE, Accepted, 12.02.2020, , End februar, Accepted, ,  
All chambers are inserted with success into the magnet. Leak check for: 07-6-013-3; 07-6-009-6; 07-6-011-9
Entry  Fri Nov 22 11:11:00 2019, Phe, test with bakeout, Quad Chambers for SIS100, , , , unknown, TO COME, , , , , , ,  
 
Entry  Fri Nov 22 11:11:24 2019, Phe, leak check, 4th batch of roughing CWT for SIS100, , , , 06.01.20, DONE, Accepted, 10.02.2020, Customised, 13.03.20, Accepted, , Stored in Weiterstadt 
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9; 07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1;
07-51-48-3; 07-51-40-7; 07-51-49-0;07-51-45-2; 07-51-46-9
Entry  Fri Nov 22 11:11:56 2019, Phe, test with bakeout, 'Spill-Cavitaet" ???, August 2019, Delayed, KW26, , TO COME, , , , , , ,  
 
Entry  Thu Nov 28 11:09:29 2019, Cristina, test with bakeout, Reference chamber for Grid for beam diagnostic SIS18, , , , 06.01.2020, DONE, Not Needed, 09.01.2020; , Setup 1, 19.01.20, Accepted, ----------, ---------- 
 
Entry  Thu Nov 28 11:11:16 2019, Cristina, test with bakeout, Reference chamber for Monitor for beam diagnostic, , , , 09.01.2020, on-going, Not Needed, 08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am, Setup 2, , , ,  
 
Entry  Mon Dec 2 14:28:58 2019, Cristina, General, TS1MU1-test with magnet, August 2019 delayed to KW6 2020, Delayed, Unkwon, N/A, DONE, Accepted, 04.03.2020, Customised, , Accepted, , Grossmontage 
Test bakeout inside the magnet
Entry  Wed Dec 4 10:08:42 2019, Cristina, test with bakeout, Macor 3 charge, , , , 04.12.19, DONE, Accepted, 11.02.2020, Customised, 20.03.2020, Cond. Accep., 23.03.2020, T. Giacomini 
 
Entry  Thu Dec 12 09:20:54 2019, Cristina, test with bakeout, IPM SIS100-Giacomini, Jannuary 2020, Delayed, Unknown, 21.04.2020, DONE, Not Needed, 04.05.2020, Customised, 15.05.2020, Accepted, Mai/Juni, Brough to the TH 
 
Entry  Thu Dec 12 09:22:19 2019, Cristina, test without bakeout, Palmer PU Tank- Dimopoulou, January 2020, on schedule, January 2020, January 2020, DONE, Accepted, 28.01.20, Customised, 31.01.20, Accepted, 03.02.20, Grossmontage 
 
Entry  Thu Dec 12 10:19:06 2019, Cristina, test with bakeout, Pumping chamber SIS100 -Stefan, End 2019, Delayed, Beginning2020, 10.12.19, DONE, Accepted, January, Customised, 05.02.2020, Accepted, , Stored in the TH 
 
Entry  Fri Dec 13 09:03:27 2019, Christian, leak check, Fasersonde Unilac, , , , 12.12.19, DONE, Accepted, 12.12.19, Customised, 16.12.19, Refused, 16.12.19, Sthraldiagnose 
 
Entry  Mon Dec 16 15:27:50 2019, Phe, test without bakeout, Beam Diagnostic from Inida - big one, , , , 13.13.2019 , DONE, Refused, 15.01.20, Customised, 19.01.20, Accepted, 24.01.201, M.Müller 

The chamber has a dent.

At the moment (16.12.2019), the chamber is under test for mechanical acceptance.
Entry  Tue Dec 17 13:39:20 2019, Phe, leak check, Fasersonde Unilac -2 test, , , , 17.12.2019, DONE, Not Needed, 17.12.2019, Customised, 17.12.2019, Accepted, 20.12.2019, Beam diagnostic 20191217_134243.jpg
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.

The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed
Entry  Wed Dec 18 11:27:54 2019, Phe, leak check, Transistion tube for SIS100 string test, Beginning 2020, Delayed, February, 06.02.2020, DONE, Refused, , , , Refused, ,  
 
Entry  Thu Jan 16 09:05:12 2020, Cristina, test without bakeout, BPM SIS100- 2010-3, 27.01.20, Delayed, 30.01.20, 30.01.20, DONE, Accepted, 03.02.2020, Customised, 05.02.2020, Refused, 10.02.2020, M.Müller 

New mobile pumping station - the controller for the IMG did not work.  The pressure is recorded from the gauge controller of Mobile pumping setup 2.