Fri Nov 22 11:07:36 2019, Phe, test without bakeout, Beam Diagnostic Chambers from India for HEBT - small one, , , , unknown, DONE, Refused, 09.01.2020, Customised, 10.01.2020 - still pumping, Accepted, 15.01.20, Mahr Rainer
|
Inside of the chamber is dirty (black mark when wiped with tissue).
At the moment (16.12.2019), the chamber is under cleaning.
Chamber has been
cleaned on the 18.12.2019, stored in the Testing Halle.
Vacuum acceptance test on the chamber - started on the 09.01.2020. |
Fri Nov 22 11:08:19 2019, Phe, test with bakeout, SEM-Monitor for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 2, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian
|
|
Fri Nov 22 11:09:19 2019, Phe, test with bakeout, Grid for Beam Diagnostic SIS18, , , , 02.12.2019, DONE, Accepted, 03.12.2019, Setup 1, 13.12.2019, Cond. Accep., 06.01.2020, Fiedler, Sebastian
|
|
Fri Nov 22 11:09:59 2019, Phe, Other, Septum SIS100 - NEG coated chamber, End 2019, Delayed, , unknown, TO COME, , , , , , ,
|
|
Fri Nov 22 11:10:33 2019, Phe, test with bakeout, Dipole Chambers for SIS100 (2box), 25.11.19, Delayed, Unknown, 17.01.20, DONE, Accepted, 12.02.2020, , End februar, Accepted, ,
|
All chambers are inserted with success into the magnet. Leak check for: 07-6-013-3; 07-6-009-6; 07-6-011-9 |
Fri Nov 22 11:11:00 2019, Phe, test with bakeout, Quad Chambers for SIS100, , , , unknown, TO COME, , , , , , ,
|
|
Fri Nov 22 11:11:24 2019, Phe, leak check, 4th batch of roughing CWT for SIS100, , , , 06.01.20, DONE, Accepted, 10.02.2020, Customised, 13.03.20, Accepted, , Stored in Weiterstadt
|
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9; 07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1;
07-51-48-3; 07-51-40-7; 07-51-49-0;07-51-45-2; 07-51-46-9 |
Fri Nov 22 11:11:56 2019, Phe, test with bakeout, 'Spill-Cavitaet" ???, August 2019, Delayed, KW26, , TO COME, , , , , , ,
|
|
Thu Nov 28 11:09:29 2019, Cristina, test with bakeout, Reference chamber for Grid for beam diagnostic SIS18, , , , 06.01.2020, DONE, Not Needed, 09.01.2020; , Setup 1, 19.01.20, Accepted, ----------, ----------
|
|
Thu Nov 28 11:11:16 2019, Cristina, test with bakeout, Reference chamber for Monitor for beam diagnostic, , , , 09.01.2020, on-going, Not Needed, 08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am, Setup 2, , , ,
|
|
Mon Dec 2 14:28:58 2019, Cristina, General, TS1MU1-test with magnet, August 2019 delayed to KW6 2020, Delayed, Unkwon, N/A, DONE, Accepted, 04.03.2020, Customised, , Accepted, , Grossmontage
|
Test bakeout inside the magnet |
Wed Dec 4 10:08:42 2019, Cristina, test with bakeout, Macor 3 charge, , , , 04.12.19, DONE, Accepted, 11.02.2020, Customised, 20.03.2020, Cond. Accep., 23.03.2020, T. Giacomini
|
|
Thu Dec 12 09:20:54 2019, Cristina, test with bakeout, IPM SIS100-Giacomini, Jannuary 2020, Delayed, Unknown, 21.04.2020, DONE, Not Needed, 04.05.2020, Customised, 15.05.2020, Accepted, Mai/Juni, Brough to the TH
|
|
Thu Dec 12 09:22:19 2019, Cristina, test without bakeout, Palmer PU Tank- Dimopoulou, January 2020, on schedule, January 2020, January 2020, DONE, Accepted, 28.01.20, Customised, 31.01.20, Accepted, 03.02.20, Grossmontage
|
|
Thu Dec 12 10:19:06 2019, Cristina, test with bakeout, Pumping chamber SIS100 -Stefan, End 2019, Delayed, Beginning2020, 10.12.19, DONE, Accepted, January, Customised, 05.02.2020, Accepted, , Stored in the TH
|
|
Fri Dec 13 09:03:27 2019, Christian, leak check, Fasersonde Unilac, , , , 12.12.19, DONE, Accepted, 12.12.19, Customised, 16.12.19, Refused, 16.12.19, Sthraldiagnose
|
|
Mon Dec 16 15:27:50 2019, Phe, test without bakeout, Beam Diagnostic from Inida - big one, , , , 13.13.2019 , DONE, Refused, 15.01.20, Customised, 19.01.20, Accepted, 24.01.201, M.Müller
|
The chamber has a dent.
At the moment (16.12.2019), the chamber is under test for mechanical acceptance. |
Tue Dec 17 13:39:20 2019, Phe, leak check, Fasersonde Unilac -2 test, , , , 17.12.2019, DONE, Not Needed, 17.12.2019, Customised, 17.12.2019, Accepted, 20.12.2019, Beam diagnostic
|
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.
The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed |
Wed Dec 18 11:27:54 2019, Phe, leak check, Transistion tube for SIS100 string test, Beginning 2020, Delayed, February, 06.02.2020, DONE, Refused, , , , Refused, ,
|
|
Thu Jan 16 09:05:12 2020, Cristina, test without bakeout, BPM SIS100- 2010-3, 27.01.20, Delayed, 30.01.20, 30.01.20, DONE, Accepted, 03.02.2020, Customised, 05.02.2020, Refused, 10.02.2020, M.Müller
|
New mobile pumping station - the controller for the IMG did not work. The pressure is recorded from the gauge controller of Mobile pumping setup 2. |
|