Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 3 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by
  43   Mon Jan 20 10:40:00 2020 Cristinatest with bakeoutCeramic Tube Diagnostic-Dorn 06-004-01376-3KW4On scheduleKW420.01.20DONEAccepted21.01.2020Setup 127.01.20Accepted29.01.20M.Müller
  44   Thu Feb 6 10:33:17 2020 Cristinatest without bakeoutBPM 2010-17 (keept in the new cryostat)KW7On scheduleKW710.02.2020DONEAccepted12.02.2020Mobile 314.02.2020Refused18.02.2020M.Müller
  45   Thu Feb 6 10:34:00 2020 Cristinatest without bakeoutBPM 2010-15 (from the Company)KW8On scheduleKW818.02.2020DONERefused19.02.2020Mobile 321.02.2020Cond. Accep.25.02.2020M.Müller
  46   Thu Feb 6 10:34:25 2020 Cristinatest without bakeoutBPM 2010-16 (keep in the old cryostat)KW9On scheduleKW926.02.2020DONERefused26.02.2020Mobile 328.02.2020Cond. Accep.27.02.2020Müller
  47   Thu Feb 6 11:11:21 2020 CristinaGeneralIn kind contribution Sweden -NikoMarch 2020On schedule          
  48   Thu Feb 6 12:45:52 2020 Cristinatest without bakeoutProtoype BV CWTMarchOn schedule 26.08.20DONENot Needed14.09.20Customised21.09.20Accepted22.09.20S. Wilfert
  49   Thu Feb 6 12:47:18 2020 Cristinaleak checkInterconnction bellows between Dipole and QuadrupoleOctober On schedule 3.11.20DONEAccepted04.11.20Customised04.11.20Refused04.11.20in Büro of S.Wilfert
  50   Thu Feb 6 12:48:46 2020 Cristinaleak check30 SIS 100 pumping chambersMay 20DelayedDecember 20         
1 chamber required: acceptance test without bakeout
  51   Tue Feb 11 09:53:14 2020 Cristinaleak checkSIS100 Sextupole (6)September 2020Delayed          
  52   Tue Feb 11 09:54:49 2020 Cristinatest with bakeoutSIS100 Injection Kicker September 2020Delayed          
  53   Tue Feb 11 09:57:17 2020 Cristinatest with bakeoutSIS100 diagnostic chambersJune 2020Delayed 17.11.2020DONENot Needed17.11.20Customised25.11.20Cond. Accep.01.12.20Grossmontage
There are a total of 6 chambers. We have to do leak check to all 6, and a complete SAT (with bakeout) to 1 chamber
  54   Tue Feb 11 09:59:48 2020 Cristinaleak checkSIS100 Quadrupole chambersMarch 2020DelayedSeptember 20September 20DONEAccepted30.09.20HEBT Setup06.10.20Accepted8.10.20I.Pongrac
  55   Fri Feb 14 13:34:54 2020 Cristinatest with bakeoutBerrilium Copper Stripes Dermati14.02.2020On schedule14.02.202014.02.2020DONENot Needed17.02.2020; 11:30 amSetup 124.02.2020Cond. Accep.26.02.2020Bardonner
  57   Wed Feb 19 11:42:59 2020 Cristinapumping speedTMP Cryring (Nikita)KW8On scheduleKW819.02.2020DONERefused9.03.2020Fischer-Mommsen16.03.2020Accepted29.05.2020Nikita
  58   Tue Mar 3 09:34:40 2020 CristinaCoatingSPARC chambers June 2019DelayedFebraury 202012.02.2020DONEAccepted01.09.2020Horizontal Coating Setup03.11.20Accepted10.12.20Track to Jülich
HR11VU61 (21.09.20); HR18VU63 (06.10.20); HR19VU64 (26.10.20); HR12VU62(02.11.20)
  59   Tue Mar 3 09:58:03 2020 Cristinatest with bakeoutFerrite RI (as received)15.MarchOn schedule 20.03.2020DONENot Needed23.03.2020Setup 127.03.2020Cond. Accep.-----------------
  60   Tue Mar 3 13:50:28 2020 Cristinatest with bakeoutMacor 4 -IPM GiacominiKW10On schedule 03.03.2020DONENot Needed18.03.2020; 07:45 amMobile 227.03.2020Cond. Accep.11.05.2020T. Giacomini
  61   Wed Mar 4 10:06:09 2020 Pheleak checkTransistion tube for SIS100 string test_Second testBeginning 2020DelayedFebruaryEnd of FebruaryDONEAccepted03.03.2020Customised03.03.2020Accepted5.03.2020Ivan and Stefan (for integration @BNG)
  62   Mon Mar 9 08:46:22 2020 Phetest without bakeoutBPM SIS100 2010-3, repeat after long pumping @ Hackhalle On schedule 06.03.2020DONEAccepted09.03.2020; 07:00 amMobile 310.03.2020Accepted12.03.2020M.Müller
  63   Thu Mar 12 13:47:38 2020 Phetest without bakeoutBPM SIS100 2010-17 (only stainless steel after cleaning - no ceramic)Received On schedule 12.03.2020DONENot Needed12.03.2020; 11:55 amMobile 317.03.2020; 11:00 amAccepted19.03.2020M.Müller
ELOG V3.1.5-fc6679b