Incoming-Outgoing Devices
Coating
Acceptance without Bakeout
Pumping Speed
Acceptance with Bakeout
Leak Check
Safety im Labor
Incoming-Outgoing Devices, Page 2 of 9
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full |
Summary
|
Threaded
|
Show attachments
165 Entries
Goto page
Previous
1
, 2,
3
...
7
,
8
,
9
Next
All
ID
Date
Author
Category
Subject
Expected
Current Status
New Expected Date
Date Received
Status
Visual Inspection
Test Started
Setup
Test Ended
Result
Outgoing Date
Taken by
22
Fri Nov 22 11:07:36 2019
Phe
test without bakeout
Beam Diagnostic Chambers from India for HEBT - small one
unknown
DONE
Refused
09.01.2020
Customised
10.01.2020 - still pumping
Accepted
15.01.20
Mahr Rainer
Inside of the chamber is dirty (black mark when wiped with tissue). At the moment (16.12.2019), the chamber is under cleaning. Chamber has been cleaned on the 18.12.2019, stored in the Testing Halle. Vacuum acceptance test on the chamber - started on the 09.01.2020.
23
Fri Nov 22 11:08:19 2019
Phe
test with bakeout
SEM-Monitor for Beam Diagnostic SIS18
02.12.2019
DONE
Accepted
03.12.2019
Setup 2
13.12.2019
Cond. Accep.
06.01.2020
Fiedler, Sebastian
24
Fri Nov 22 11:09:19 2019
Phe
test with bakeout
Grid for Beam Diagnostic SIS18
02.12.2019
DONE
Accepted
03.12.2019
Setup 1
13.12.2019
Cond. Accep.
06.01.2020
Fiedler, Sebastian
25
Fri Nov 22 11:09:59 2019
Phe
Other
Septum SIS100 - NEG coated chamber
End 2019
Delayed
unknown
TO COME
26
Fri Nov 22 11:10:33 2019
Phe
test with bakeout
Dipole Chambers for SIS100 (2box)
25.11.19
Delayed
Unknown
17.01.20
DONE
Accepted
12.02.2020
End februar
Accepted
All chambers are inserted with success into the magnet. Leak check for: 07-6-013-3; 07-6-009-6; 07-6-011-9
Draft
Fri Nov 22 11:11:00 2019
Phe
test with bakeout
Quad Chambers for SIS100
unknown
TO COME
28
Fri Nov 22 11:11:24 2019
Phe
leak check
4th batch of roughing CWT for SIS100
06.01.20
DONE
Accepted
10.02.2020
Customised
13.03.20
Accepted
Stored in Weiterstadt
07-51-50-6; 07-51-38-4;07-51-47-6; 07-51-33-9; 07-51-02-5 (GEWINDEBOHRUNG IM KONTAKBLOCK WRONG);07-51-43-8; 07-51-41-4;07-51-44-5;07-51-42-1;04-51-39-1; 07-51-48-3; 07-51-40-7; 07-51-49-0;07-51-45-2; 07-51-46-9
29
Fri Nov 22 11:11:56 2019
Phe
test with bakeout
'Spill-Cavitaet" ???
August 2019
Delayed
KW26
TO COME
30
Thu Nov 28 11:09:29 2019
Cristina
test with bakeout
Reference chamber for Grid for beam diagnostic SIS18
06.01.2020
DONE
Not Needed
09.01.2020;
Setup 1
19.01.20
Accepted
----------
----------
Draft
Thu Nov 28 11:11:16 2019
Cristina
test with bakeout
Reference chamber for Monitor for beam diagnostic
09.01.2020
on-going
Not Needed
08.01.2020; 09:05 am; repeat due to leak - 13.01.2019, 07:00 am
Setup 2
32
Mon Dec 2 14:28:58 2019
Cristina
General
TS1MU1-test with magnet
August 2019 delayed to KW6 2020
Delayed
Unkwon
N/A
DONE
Accepted
04.03.2020
Customised
Accepted
Grossmontage
Test bakeout inside the magnet
34
Wed Dec 4 10:08:42 2019
Cristina
test with bakeout
Macor 3 charge
04.12.19
DONE
Accepted
11.02.2020
Customised
20.03.2020
Cond. Accep.
23.03.2020
T. Giacomini
35
Thu Dec 12 09:20:54 2019
Cristina
test with bakeout
IPM SIS100-Giacomini
Jannuary 2020
Delayed
Unknown
21.04.2020
DONE
Not Needed
04.05.2020
Customised
15.05.2020
Accepted
Mai/Juni
Brough to the TH
36
Thu Dec 12 09:22:19 2019
Cristina
test without bakeout
Palmer PU Tank- Dimopoulou
January 2020
on schedule
January 2020
January 2020
DONE
Accepted
28.01.20
Customised
31.01.20
Accepted
03.02.20
Grossmontage
37
Thu Dec 12 10:19:06 2019
Cristina
test with bakeout
Pumping chamber SIS100 -Stefan
End 2019
Delayed
Beginning2020
10.12.19
DONE
Accepted
January
Customised
05.02.2020
Accepted
Stored in the TH
38
Fri Dec 13 09:03:27 2019
Christian
leak check
Fasersonde Unilac
12.12.19
DONE
Accepted
12.12.19
Customised
16.12.19
Refused
16.12.19
Sthraldiagnose
39
Mon Dec 16 15:27:50 2019
Phe
test without bakeout
Beam Diagnostic from Inida - big one
13.13.2019
DONE
Refused
15.01.20
Customised
19.01.20
Accepted
24.01.201
M.Müller
The chamber has a dent. At the moment (16.12.2019), the chamber is under test for mechanical acceptance.
40
Tue Dec 17 13:39:20 2019
Phe
leak check
Fasersonde Unilac -2 test
17.12.2019
DONE
Not Needed
17.12.2019
Customised
17.12.2019
Accepted
20.12.2019
Beam diagnostic
This phase probe was tested by Christian Kolligs on the 12.12.2019 and it has leak rate of 1E-6 mbar.l/s.
The probe was then repaired by the Beam Diagnostic and tested again on the 17.12.2019 by Toni Coronato: it was leaky again. Repaired again and installed in the Unilac on the 20.12.19
41
Wed Dec 18 11:27:54 2019
Phe
leak check
Transistion tube for SIS100 string test
Beginning 2020
Delayed
February
06.02.2020
DONE
Refused
Refused
42
Thu Jan 16 09:05:12 2020
Cristina
test without bakeout
BPM SIS100- 2010-3
27.01.20
Delayed
30.01.20
30.01.20
DONE
Accepted
03.02.2020
Customised
05.02.2020
Refused
10.02.2020
M.Müller
New mobile pumping station - the controller for the IMG did not work. The pressure is recorded from the gauge controller of Mobile pumping setup 2.
Goto page
Previous
1
, 2,
3
...
7
,
8
,
9
Next
All
ELOG V3.1.5-fc6679b