ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by
  2   Mon Sep 30 11:04:15 2019 Cristinaleak checkCryo collimator 11-1-18-8   24.09.2019DONEAccepted25.09.2019Customised25.09.2019Accepted26.09.2019L. Bozyk
  3   Mon Sep 30 11:11:26 2019 Cristinatest with bakeoutLaser chamber -WintersBeginning 2019Delayed 16.08.2019DONEAccepted30.08.2019Customised12.02.2020AcceptedKW10D.Winters
The measurement was stopped because of the wrong heating jackets
  4   Mon Sep 30 11:15:47 2019 Cristina test with bakeoutDetector Recoil chamber ESR   2.09.2019DONEAccepted9.09.2019Customised29.10.2019Cond. Accep.1.11.19Hillenbrand
The chamber was brought in the lab without heating jackets, which where shipped on the 17.10. Conditionally Accepted because the RGA after bakeout does not fulfil the requirements.
  5   Mon Sep 30 14:00:51 2019 Cristinapumping speed800 l/s Agilent   20.09.2019DONEAccepted1Test:7.10.2019; 2Test: 14.11.2019Fischer-Mommsen1.11.19Cond. Accep. Sent back to Agilent
Pumping Speed measured a bit lower than stated
  6   Mon Sep 30 14:04:43 2019 Cristinapumping speedCombi pump DN40   09.08.2019DONEAccepted20.08.2019Fischer-Mommsen20.09.2019Accepted Sent back to Agilent
  7   Mon Sep 30 14:06:07 2019 Cristinapumping speedSlim SIP 150   9.08.2019DONEAccepted07.02.2020Fischer-Mommsen06.03.2020Accepted  
  8   Wed Oct 9 07:55:47 2019 Pheleak checkAll metal gate valve (Bender)   08.10.2019DONEAccepted21.10.2019Customised24.10.2019Accepted24.10.2019M.Bender
Leak check required by Markus Bender for a "all metal gate valve". The gate valve was received on the 08.10.2019. No deadline. The gate valve is on Edgar's desk - so Edgar can check it when he's back from holiday. 23.10.2019 Test DONE
  9   Wed Oct 9 07:57:44 2019 Phetest with bakeoutCryring Detector Tube    09.10.2019DONEAccepted10.10.2019Setup 122.10.2019Accepted24.10.2019Spillmann
Detector tube has been received from Grossmontage (given to Andreas Kraemer). This Detector tube is for Cryring - measurement request from Dr. Uwe Spillmann. The Detector tube needs to have some additional components, which will be assembled by Alexander Borovik (from Giessen University). Email has been sent to Alexander Borovik and he might pick the Detector Tube on 09.010.2019. The Detector Tube is on Phe's desk. The detector tube has been picked up by Alexander Borovik (09.10.2019). The additional component has been assembled to the Detector tube (09.10.2019)
  10   Wed Oct 9 08:01:51 2019 Phetest with bakeoutMacor Samples from Tino Giacomini   02.10.2019DONEAccepted10.10.2019Mobile 26.11.19Accepted8.11.19Giacomini
Macor samples have been received from Tino Giacomini on the 02.10.2019. These Macor samples will be used for IPM chamber. The test request is a vacuum acceptance test with bake-out.
  11   Wed Oct 9 14:19:09 2019 Phetest with bakeoutScrapper for ESR (for Markus Steck)   09.10.2019DONEAccepted14.10.2019Setup 218.10.2019Accepted24.10.2019Schwarz
Measurements asked as "urgent" for ESR. This piece was already measured in 2014, and then stored in an unkwon place.
  12   Mon Oct 14 10:08:14 2019 Cristinaleak checkDipole chamber SIS100 First charge   10.10.2019DONEAccepted11.10.2019Customised29.11.2019Accepted Stored in the TH
6 dipole received on the KW41. Integral leak check and 1 test without bakeout After the vacuum test the chambers must be inserted on the magnet: 1 chamber was not fitting easy into the magnet. It will go today (15.11.19) in the technology lab for mechanical measurements.
  13   Mon Oct 14 10:09:36 2019 Cristinaleak checkRoughing CWT 3 charge   10.10.2019DONEAccepted14.10.2019Customised14.11.19Accepted Stored in Weiterstadt
Integral leak check to be done for all CWT. DONE: 07-51-23-0; 07-51-26-1; 07-51-30-8; 07-51-31-5; 07-51-17-9; 07-51-28-5;07-51-21-6 (Black-orange spots visible);07-51-36-0; 07-51-37-7; 07-51-32-2; 07-51-14-8;07-51-35-3;07-51-18-6; 07-51-29-2; 07-51-34-6
  14   Wed Oct 16 08:24:29 2019 Tonileak checkKryokollimator June 2019DelayedAugustfrom September 2019DONENot Needed02.09.2019Customised09.12.2020Accepted  
Collimator tested:11-1-02-7; 11-1-03-4; 11-1-4-01; 11-1-06-5; 11-1-09-6; 11-1-10-2; 11-1-11-9; 11-1-12-6; 11-1-14-0; 11-1-15-7; 11-1-16-4; 11-1-17-1; 11-1-18-8; 11-1-20-1;11-1-25-6; 11-1-22-5;11-01-24-4;11-1-28-7;11-1-27-0;11-1-29-4;11-1-26-3;11-1-13-3;11-1-21-8;11-1-40-9; 11-1-39-3;11-1-30-0;11-1-19-5 (LEAK!!!); 11-1-33-1;11-1-23-2; 11-1-43-0;11-1-42-3; 11-1-37-9; 11-1-63-8; 11-1-57-7; 11-1-45-4; 11-1-49-2; 11-1-44-7; 11-1-58-4; 11-1-24-9;11-1-36-2; 11-1-31-7; 11-1-38-6; 11-1-55-3; 11-1-53-9; 11-1-32-4;11-1-50-8; 11-1-34-8; 11-1-61-4;11-1-65-2; 11-1-64-5; 11-1-60-7;11-1-62-1;11-1-66-9; 11-1-51-5;11-1-59-1; 11-1-35-5; 11-1-52-2;11-1-48-5; 11-1-41-6; 11-1-46-1; 11-1-56-0; 11-1-54-6
  15   Mon Oct 21 10:24:59 2019 CristinaOtherTube Heidelberg   17.10.2019DONEAcceptedFirst Test: 24.10.2019; Second Test:30.01.20 Horizontal Coating Setup29.10.2019: Refused; Second Test: 05.02.2020Accepted11.02.2020C.Schröter
Tube to be coated for HD. After the first coating: PEELING. STOP and waiting for the nextstep to be decided in HD. We cleaning the tubes many times, to try to remove all the film, and then we performes succesfully the second coating.
  Draft   Thu Oct 24 14:55:28 2019 Toni              
  Draft   Thu Oct 24 14:58:25 2019 Toni              
  18   Fri Nov 1 10:41:45 2019 Cristinatest with bakeoutIPM Chamber   4.09.2019DONERefused   Refused1.11.19Angelo
Bellows to short
  19   Fri Nov 8 10:52:43 2019 Cristinatest with bakeoutMacor 2 for IPM   8.11.19DONEAccepted11.11.2019Mobile 218.11.2019Accepted04.12.19T. Giacomini
  20   Mon Nov 11 08:06:09 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator (Hackhalle)   unknownDONEAccepted11.11.2019; 10:15 am, stopped 12.11.2019Customised Refused  
Broken gauge (cold cathode gauge).
  21   Thu Nov 14 14:00:28 2019 Phetest without bakeoutRef. Chamber for Beam Diagnostic Manipulator   unknownDONEAccepted14.11.2019; 10:30 amCustomised22.11.2019Cond. Accep.N/AN/A
Wide range gauge is now installed on the chamber. The previous test with cold cathode gauge failed due to broken gauge. Another complete new gauge is now installed on the chamber.