Incoming-Outgoing Devices Coating Acceptance without Bakeout Pumping Speed Acceptance with Bakeout Leak Check Safety im Labor
  Incoming-Outgoing Devices, Page 5 of 9  Not logged in ELOG logo
ID Date Author Category Subject Expected Current Status New Expected Date Date Received Status Visual Inspection Test Started Setup Test Ended Result Outgoing Date Taken by Text Attachments
  85   Mon Sep 14 09:15:03 2020 Cristinatest without bakeoutBPM SIS100 2010-17   09.09.20DONEAccepted09.09.2020Mobile 310.09.2020Cond. Accep.17.09.2020M. Müller    
  86   Mon Sep 14 09:16:54 2020 Cristinatest with bakeoutMirror Laser cooling SIS100   14.09.2020DONEAccepted6.10.20Mobile 221.10.20Cond. Accep.KW47D.Winters    
  87   Mon Sep 14 10:38:59 2020 Cristinatest without bakeoutTest on Viton gasket   14.09.2020TO DONot Needed          
  88   Tue Sep 15 11:14:44 2020 Cristinaleak checkSIS100 Dipole chambers    on-going July 2019Customised    07-00006-001-0; 07-00006-002-7; 07-00006-003-4;
07-00006-004-1; 07-00006-005-8; 07-00006-006-5;
07-00006-007-2; 07-00006-009-6; 07-00006-010-2;
  
  90   Mon Sep 21 11:31:47 2020 Cristinatest without bakeoutHEBT BPMKW39On schedule 28.09.20on-goingAccepted05.10.20. Test started again: 08.12.20Mobile 3 Refused  Since 19. Okt we wait for the decision of
the diagnostic group on how(who has to clean
the BPM. Since then the test is stopped.
Meeting
  
  91   Mon Sep 21 11:32:46 2020 Cristinatest with bakeoutFerrite RI after firing   18.09.20DONEAccepted22.09.2020Setup 11.10.20Accepted------------------    
  92   Mon Sep 21 11:39:27 2020 Cristinatest without bakeoutSteel with epoxy glueAugust 20Delayed 21.09.20DONE 22.09.2020 03.10.20Refused??    
  93   Mon Sep 21 14:26:53 2020 Cristinaleak checkBeam line CWT   21.08.20  21.09.20Customised23.09.2020Accepted24.09.20S.Wilfert    
  95   Wed Sep 30 13:39:48 2020 Cristinatest with bakeoutTube CCC Cryring   30.09.2020DONEAccepted5.10.20Setup 107.10.20Accepted8.10.20T. Sieber    
  96   Tue Oct 13 07:54:31 2020 Phetest without bakeoutEpoxy - baked in the oven @ 80 deg C09.10.2020On schedule 09.10.2020DONENot Needed22.10.20Mobile 229.10.20Refused      
  97   Wed Oct 21 10:51:47 2020 Cristinatest with bakeoutIPM SIS18 mit diagnostic parts   25.09.2020DONERefused20.10.20 29.10.20Cond. Accep.2.11.20Grossmontage    
  98   Tue Nov 3 09:55:20 2020 Cristinatest with bakeoutMCPs for IPM SIS18SeptemberDelayed 2.11.20DONEAccepted2.11.20Setup 109.11.2020Cond. Accep.10.11.2020T.Giacomini    
  99   Tue Nov 17 09:43:55 2020 Cristinatest without bakeoutBPM 2010-16   ?DONEAccepted16.11.20Mobile 317.11.20Cond. Accep.01.12.20Grossmontage    
  100   Thu Nov 19 10:15:23 2020 CristinaCoatingParts for Cryring    Beginning October 20DONEAccepted16.11.20Horizontal Coating Setup17.11.20Accepted26.11.20David (Cryring)There are some parts which were not coated:
2 bellows (the Cryring people still did not
receive them from the company) and a T-piece,
  
  101   Thu Nov 19 10:17:06 2020 CristinaCoatingCoating chamber Glorius   16.11.20DONEAccepted27.11.20Horizontal Coating Setup3.12.20Accepted14.12.20Glorius    
  102   Mon Nov 30 11:14:30 2020 CristinaCoatingT-piece CryringOct  KW48DONEAccepted26.11.20Horizontal Coating Setup3.12.20Accepted10.12.20Nikita    
  103   Mon Nov 30 11:15:48 2020 Cristinatest with bakeoutAntrieb for ESR-Beata1 Dec.Delayed?3.12.20DONENot Needed3.12.20Setup 110.12.2020Accepted11.12.20Müller    
  104   Mon Nov 30 11:17:49 2020 Cristinaleak check5 x SIS100 Diagnostic ChambersKW 49   DONENot Needed01.12.20 16.12.20Accepted  06-00401-099-1 (abgeholt on the 07.12 M.Müller);
06-00401-100-4 (abgeholt 09.12.20 Müller);
06-00401-101-1; 06-00401-103-5
  
  105   Tue Dec 1 11:49:07 2020 Cristinatest with bakeoutBellows IPM SIS18-Second measurement after cleaning   12.10.20DONENot Needed12.10.20HEBT Setup14.10.20Accepted15.10.20Zentrale Dienst     
  106   Tue Jan 12 12:48:45 2021 Cristinatest without bakeoutHEBT BPM-Cleaned @KyoceraBeginning 21On schedule 12.01.21DONEAccepted12.01.21Mobile 314.01.21Accepted19.01.21M.Müller    
ELOG V3.1.5-fc6679b