73
|
Mon May 16 18:01:23 2022 |
mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu | Runs | runs afternoon/night shift 16.05 | These are the runs after the septum was repaired
on 16.05.
|
|
16
|
Mon May 9 09:43:08 2022 |
Zoran | Accelerator | ESR Beam | The main control room started setting up the
Bi beam this morning, but quickly stopped
in order to solve some problems around the |
|
24
|
Mon May 9 19:56:41 2022 |
Zoran | Accelerator | status Monday evening | The main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check |
|
25
|
Tue May 10 09:05:19 2022 |
Zoran | Accelerator | status Monday evening | > The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will |
|
42
|
Wed May 11 08:01:44 2022 |
Zoran | Runs | Start laser scanning | [quote]
[I]Questions:[/I]
[B]There are many other masses/isotopes/etc. |
|
47
|
Wed May 11 20:47:54 2022 |
Zoran | Accelerator | beam lost in SIS | For some reason the beam was lost in the SIS
soon after taking the ESR beam this evening,
reason unknown. Solved by sending teh full |
|
66
|
Fri May 13 08:32:41 2022 |
Zoran | Accelerator | NO BEAM UNTIL TOMORROW MORNING | > The problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
|
|
79
|
Tue May 17 06:37:28 2022 |
YL, KM | Accelerator | Reduced beam intensity | The resonance in 209Bi has been seen during
the night.
Reducing the intensity by a factor~1000, |
|
45
|
Wed May 11 18:00:40 2022 |
Wilfried, Phillip, Max | Detectors | double PD NO peak problem solved | In entry 36 one finds an additional PD NO
peak around bin 100.
This was caused by signal reflection in the |
|
46
|
Wed May 11 18:13:04 2022 |
Wilfried, Phillip, Max | DAQ | laser scan/step complete | The scaler channel laser scan complete and
laser step complete is interchanged in go4.
Carsten will fix this on the software side.
|
|
17
|
Mon May 9 11:45:57 2022 |
Wilfried, Jon, Sebastian | General | HV Divider position & DMM calibration | We performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
|
|
94
|
Mon May 30 21:52:08 2022 |
Wilfried, Danyal, David, Rodolfo | General | Position of T-Scrapers | We have determined the position of the H-like
208Bi ion beam using the T-Scrapers. The
position actually did not change in comparison |
|
23
|
Mon May 9 19:05:17 2022 |
Wilfried | DAQ | Q-Switch signals + 0.5 ms and +1 ms in VUPROM | We have generated two additional signals which
are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
|
|
14
|
Fri May 6 16:29:03 2022 |
Simon, Patrick | Detectors | PMT preparation | We changed PMT north and PMT south and tested
them at 1500 V.
|
|
55
|
Thu May 12 10:10:35 2022 |
Simon, Christopher, Wilfried, Sebastian | DAQ | 1ms gated PMT north / middle added to DAQ | We added on DAQ1 and DAQ2 1ms gated PMT North
and PMT Middle signals.
Now we "supress" the signal by a factor of |
|
58
|
Thu May 12 11:31:11 2022 |
Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan | General | Runs morning shift |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts | new shift started. |
|
40
|
Wed May 11 06:47:58 2022 |
Simon, Christopher, Shahab | Runs | restart laser scan |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters | Procedure:
- Scanning phase ends (on LabView wait until |
|
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups | The lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 |
|