HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, Page 1 of 6  Not logged in ELOG logo
ID Date Authordown Category Subject Text Attachments
  73   Mon May 16 18:01:23 2022 mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu Runsruns afternoon/night shift 16.05These are the runs after the septum was repaired
on 16.05.
  
  16   Mon May 9 09:43:08 2022 ZoranAcceleratorESR BeamThe main control room started setting up the
Bi beam this morning, but quickly stopped
in order to solve some problems around the
  
  24   Mon May 9 19:56:41 2022 ZoranAcceleratorstatus Monday eveningThe main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check
  
  25   Tue May 10 09:05:19 2022 ZoranAcceleratorstatus Monday evening> The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will
 22-05-09_200006_20220509_170137_tcl1024_dcct.png 
  42   Wed May 11 08:01:44 2022 ZoranRunsStart laser scanning[quote]
[I]Questions:[/I]
[B]There are many other masses/isotopes/etc.
  
  47   Wed May 11 20:47:54 2022 ZoranAcceleratorbeam lost in SISFor some reason the beam was lost in the SIS
soon after taking the ESR beam this evening,
reason unknown. Solved by sending teh full
  
  66   Fri May 13 08:32:41 2022 ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNING> The problem at the ESR septum is serious.
They have to remove the broken part and try
to repair it.
  
  79   Tue May 17 06:37:28 2022 YL, KMAcceleratorReduced beam intensityThe resonance in 209Bi has been seen during
the night.
Reducing the intensity by a factor~1000,
  
  45   Wed May 11 18:00:40 2022 Wilfried, Phillip, MaxDetectorsdouble PD NO peak problem solvedIn entry 36 one finds an additional PD NO
peak around bin 100.
This was caused by signal reflection in the
  
  46   Wed May 11 18:13:04 2022 Wilfried, Phillip, MaxDAQlaser scan/step completeThe scaler channel laser scan complete and
laser step complete is interchanged in go4.
Carsten will fix this on the software side.
  
  17   Mon May 9 11:45:57 2022 Wilfried, Jon, SebastianGeneralHV Divider position & DMM calibrationWe performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
 DMM_calibration.PNGdividerPosition.PNGdividerPosition1.PNG 
  94   Mon May 30 21:52:08 2022 Wilfried, Danyal, David, RodolfoGeneralPosition of T-ScrapersWe have determined the position of the H-like
208Bi ion beam using the T-Scrapers. The
position actually did not change in comparison
 MRC_208Bi_30-05-2022-10Uhr.png 
  23   Mon May 9 19:05:17 2022 WilfriedDAQQ-Switch signals + 0.5 ms and +1 ms in VUPROMWe have generated two additional signals which
are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
  
  14   Fri May 6 16:29:03 2022 Simon, PatrickDetectorsPMT preparationWe changed PMT north and PMT south and tested
them at 1500 V.
  
  55   Thu May 12 10:10:35 2022 Simon, Christopher, Wilfried, SebastianDAQ1ms gated PMT north / middle added to DAQWe added on DAQ1 and DAQ2 1ms gated PMT North
and PMT Middle signals.
Now we "supress" the signal by a factor of
  
  58   Thu May 12 11:31:11 2022 Simon, Christopher, Shahab, Wilfried, Sebastian, RaganGeneralRuns morning shift
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after
  
  39   Wed May 11 06:41:32 2022 Simon, Christopher, ShahabRunsshiftsnew shift started.   
  40   Wed May 11 06:47:58 2022 Simon, Christopher, ShahabRunsrestart laser scan
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after
  
  41   Wed May 11 07:28:39 2022 Simon, Christopher, ShahabGeneralDAQ Loop for shiftersProcedure:

- Scanning phase ends (on LabView wait until
  
  27   Tue May 10 11:59:45 2022 Simon, Christopher, Kristian, SebastianLaserLabview VI checkupsThe lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74
  
ELOG V3.1.5-fc6679b