ID |
Date |
Author |
Category |
Subject |
Text |
|
50
|
Wed May 11 22:45:22 2022 |
Max, Wilfried, Patrick | General | scanning wavelength | The scan parameters for the next shift are:
in COBRACONTROL:
|
|
98
|
Tue May 31 15:19:58 2022 |
Max, Carsten, Danyal | General | scans for different E-cool currents |
until 15:15 we have measured with I_e = 100
mA (3 loops per file)
|
|
34
|
Tue May 10 23:53:42 2022 |
Rodolfo | General | shift change | The night shift took over. They are trying
now to overlap the ion and laser beams. |
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts | new shift started. |
|
48
|
Wed May 11 22:04:30 2022 |
Phillip, Wilfried, Max | General | spacial laser - ion overlap verified | After the SIS/ESR optimization we checked
the spatial overlap with the T-scrapers again.
|
|
52
|
Wed May 11 23:36:24 2022 |
Ruijiu Chen, Carsten, Guy | DAQ | start NTCAP. | Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
|
|
74
|
Mon May 16 19:20:55 2022 |
Max, Wilfried | Analysis | start go4 before laser scan | It is necessary to start go4 before you start
the laser scan. Otherwise you get an offset
in the laser Step plots. |
|
24
|
Mon May 9 19:56:41 2022 |
Zoran | Accelerator | status Monday evening | The main control room is setting up the SIS
for extraction. At the moment there are 2.5E8
particles in the SIS. Later they will check |
|
25
|
Tue May 10 09:05:19 2022 |
Zoran | Accelerator | status Monday evening | > The main control room is setting up the
SIS for extraction. At the moment there are
2.5E8 particles in the SIS. Later they will |
|
26
|
Tue May 10 11:40:55 2022 |
Sebastian | Accelerator | still no beam @ESR | There is still no Beam in the ESR.
The beam is currently at TE3 - between SIS |
|
109
|
Fri Jun 3 12:01:17 2022 |
Danyal | Detectors | switched off XUV detector on 1 June ~17:00 | I have switched off the XUV detector on 1
June at about 17:00.
The high voltages of the MCP (in ESR laser |
|