  Dielectronic recombination-assisted laser spectroscopy, Page 2 of 6  Not logged in ELOG logo
ID Date Author Category Subjectup Text Attachments
  62   Thu May 12 15:21:23 2022 Sebastian, SimonLaserFlash lamps changedWe (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards
  
  7   Fri Apr 29 21:18:12 2022 Rodolfo & MaxLaserFluorescein 27, Rh 610 + Rh 640We (Max and Rodolfo) have tested the dyes.
I have prepared the dye-solutions according
to the recipes given in Sirah's User Manual.
  
  61   Thu May 12 14:04:09 2022 KonstantinDAQGo4 Laserstep histograms adaptedIn order to correctly display the gated PMT
signals [I]PMT Middle[/I] and [I]PMT North[/I]
some modifications in the Go4 code were necessary.
 Go4Modifications.PNG 
  17   Mon May 9 11:45:57 2022 Wilfried, Jon, SebastianGeneralHV Divider position & DMM calibrationWe performed an autocalibration (attached
picture 1) of the Keysight 34465A DMM (TUD
Keysight).
 DMM_calibration.PNGdividerPosition.PNGdividerPosition1.PNG 
  108   Wed Jun 1 17:20:04 2022 RodolfoLaserHeNe @ WS7   HeNe_WS7_01-06-2022_1.png 
  22   Mon May 9 17:16:34 2022 CarstenAcceleratorImportant: New ESR pattern - requies action for XUV detector in/outThe ESR pattern is enhanced compared to the
thorium experiment by additional machines
that can be  used for cooling/waiting in
  
  76   Mon May 16 22:19:54 2022 PatrickDAQKeep go4 running (in theory), MBSTo accumulate more data into the opened go4,
do not restart MBS, but just
  
  1   Fri Jul 30 10:21:27 2021 RodolfoLaserKinkThe laser beamline in the ESR north arc has
a [B]knik[/B], therefore the laser beam can
not get the "laser tower" in the north east
 Laser_beamline_ESR_NordBogen.jpg 
  27   Tue May 10 11:59:45 2022 Simon, Christopher, Kristian, SebastianLaserLabview VI checkupsThe lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74
  
  36   Wed May 11 03:10:55 2022 Patrick, Sebastian, Volker, Guy LaserLaser - bunch timingWe added the delay and gate generator in between
the bunch trigger and the CFD to move the
timing of the PMT middle signal relative
 2022-05-06_Bi2023_laserscan_test.png 
  82   Fri May 27 14:57:23 2022 RodolfoLaserLaser EnergyI have started up the laser system (Q-Ray
& Cobra) again. Here some parameters*:
  
  67   Fri May 13 11:46:51 2022 Sebastian, Simon Laser energyWe (Sebastian and I)  measured the output
energy of the laser system again. 
All values in [mJ] and over 500 laser-pulses
  
  18   Mon May 9 13:48:20 2022 RodolfoLaserLaser for H-like 209BiI have changed the dye to Rhodamin 610 + Rhodamin
640. The Cobra wavelength can be tuned now
from 600 to 630 nm.
  
  75   Mon May 16 21:08:48 2022 Rodolfo & MaxLaserLaser powerWe checked the energy of the laser and optimized
it a bit
  
  54   Thu May 12 03:25:37 2022 PatrickDAQLaser scan complete signal offAs in ID:46, the 'laser scan complete' again
is not coming in.
It is not very useful to repeatedly fix cable
  
  28   Tue May 10 15:26:35 2022 Rodolfo, MaxLaserLaser stabilisation runningIt is now possible to stabilize and move the
laser with both stages.
 MRC_Settings_for_Bismuth_10-05-2022.PNGMRC_hardware_Setting.PNG 
  44   Wed May 11 14:59:01 2022 RodolfoLaserLaser statusI have measured the output energy of the laser
system. All values in [mJ] and over 500 laser-pulses
average
  
  10   Wed May 4 22:56:22 2022 Rodolfo, Sebastian, KonstantinLaserLaser step complete, scan complete fixed"Laser step complete" and "laser scan complete"
are working again.
  
  97   Tue May 31 03:18:52 2022 Patrick, KonstantinLaserLaser timingThe final timings are (in bins +-1):

PD NO: 103
  
  87   Mon May 30 02:33:45 2022 Patrick, MBS MaxDAQMBS procedureIt is possible to keep go4 running now. Summary
of the procedure:
  