HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, Page 5 of 6  Not logged in ELOG logo
ID Date Author Category Subjectup Text Attachments
  6   Tue Apr 26 18:15:19 2022 RodolfoDetectorsXUV-Detector and Cu-MirrorConcerning the moveable detectors: 

- I have switched off the power supply and
  
  85   Mon May 30 01:13:40 2022 Konstantin, Max, PatrickDetectorsXUV-Detector voltage offXUV-Detector shows up to 100 kHz and, therefore,
was turned off.
  
  47   Wed May 11 20:47:54 2022 ZoranAcceleratorbeam lost in SISFor some reason the beam was lost in the SIS
soon after taking the ESR beam this evening,
reason unknown. Solved by sending teh full
  
  99   Tue May 31 17:22:09 2022 Max, Carsten, Danyal, Rodolfo, WilfriedGeneralchange E-cooler current I_e = 50 mA
At 17:15 we changed again the E-cooler current
I_e = 50 mA  
  
  102   Tue May 31 19:59:49 2022 Carsten, DanyalAcceleratorchange in frequency mismatch 208Bi --> 209Bitime = 20:00 

The RF has been adjusted so that it bunches
  
  20   Mon May 9 17:01:02 2022 CarstenDAQdirectories / paths / comments / reduction factors /startup.scom files for the 2 DAQs [U][B]DAQ1 (original):[/B][/U]
-user atplaser
-runs on lxg1050
  
  45   Wed May 11 18:00:40 2022 Wilfried, Phillip, MaxDetectorsdouble PD NO peak problem solvedIn entry 36 one finds an additional PD NO
peak around bin 100.
This was caused by signal reflection in the
  
  100   Tue May 31 19:32:56 2022 Carsten, Wilfried, MaxCalibrationelectron cooler calibration voltage - frequency[TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq
| Current 
  
  2   Fri Apr 22 09:38:24 2022 RodolfoLasergetting ready for Fluorescein548We are going to change dye. Therefore I have
take out the DCM-dye-solution* out of the
dye circulators, rinsed them with Ethanol
  
  4   Mon Apr 25 21:47:28 2022 RodolfoLasergreen instead UVI am exchanging the optical elements (mirrors
and lenses) for the laser spectroscopy on
bismuth. At some places I am also exchanging
 Libelle_Umtausch_GrüneOptik.jpgUmtausch_Spiegel_2statt3.jpg 
  49   Wed May 11 22:19:17 2022 Max, Wilfried, VolkerLaserlaser bunch timingWe overlapped the laser and ion bunch in the
time domain. The delay has to be set on the
module above the laser and NOT in the ESR
 timing10_5_22.png 
  72   Mon May 16 17:38:38 2022 Max, Danyal, Wilfried, RodolfoGenerallaser bunch timingWe overlapped the laser and ion bunch in the
time domain. 
Therefore we delayed the bunching HF in order
 timing1605.png 
  12   Fri May 6 10:30:23 2022 SebastianDAQlaser busy / dye out signal fixedSolution for a working laser busy / dye out
signal was to disable the FCU and set the
FCU status to "False" (see attached picture).
 CobraFix_LaserBusy.PNG 
  11   Thu May 5 15:24:34 2022 SebastianLaserlaser busy problemCurrent status: 
Laser busy signal works correctly (5V if
the grating moves, 0V if not) if the laser
  
  63   Thu May 12 15:34:47 2022 Max, Kristian, SebastianDAQlaser scan, laser step and laser busy checkedWe checked all three signals in the Messhütte.
Laser scan and laser step are OK.
The Laser busy signal is for large increments
  
  46   Wed May 11 18:13:04 2022 Wilfried, Phillip, MaxDAQlaser scan/step completeThe scaler channel laser scan complete and
laser step complete is interchanged in go4.
Carsten will fix this on the software side.
  
  13   Fri May 6 10:35:06 2022 SebastianDAQlaser step complete cabling changedI changed the laser step complete cabling
from a quad coinc (see attached picture)
to a Logic Fan In / Fan out (same as laser
 stepComplete_beforeChange_QuadCoincCabling.PNG 
  40   Wed May 11 06:47:58 2022 Simon, Christopher, ShahabRunsrestart laser scan
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after
  
  73   Mon May 16 18:01:23 2022 mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu Runsruns afternoon/night shift 16.05These are the runs after the septum was repaired
on 16.05.
  
  86   Mon May 30 02:12:20 2022 Max, Patrick, ~Konstantin, Ragan, KenRunsruns night shift 30.05.These are the first runs of the substitute
beamtime.
 2022-05-30_resonance_10_loops.png48_AM.png 
ELOG V3.1.5-fc6679b