28
|
Tue May 10 15:26:35 2022 |
Rodolfo, Max | Laser | Laser stabilisation running | It is now possible to stabilize and move the
laser with both stages.
|
|
9
|
Wed May 4 22:55:37 2022 |
Rodolfo, Sebastian | Laser | FCU / Temp Control Bug | We found a "Bug" in the control of the Sirah
dye system.
|
|
10
|
Wed May 4 22:56:22 2022 |
Rodolfo, Sebastian, Konstantin | Laser | Laser step complete, scan complete fixed | "Laser step complete" and "laser scan complete"
are working again.
|
|
52
|
Wed May 11 23:36:24 2022 |
Ruijiu Chen, Carsten, Guy | DAQ | start NTCAP. | Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
|
|
11
|
Thu May 5 15:24:34 2022 |
Sebastian | Laser | laser busy problem | Current status:
Laser busy signal works correctly (5V if
the grating moves, 0V if not) if the laser |
|
12
|
Fri May 6 10:30:23 2022 |
Sebastian | DAQ | laser busy / dye out signal fixed | Solution for a working laser busy / dye out
signal was to disable the FCU and set the
FCU status to "False" (see attached picture).
|
|
13
|
Fri May 6 10:35:06 2022 |
Sebastian | DAQ | laser step complete cabling changed | I changed the laser step complete cabling
from a quad coinc (see attached picture)
to a Logic Fan In / Fan out (same as laser |
|
26
|
Tue May 10 11:40:55 2022 |
Sebastian | Accelerator | still no beam @ESR | There is still no Beam in the ESR.
The beam is currently at TE3 - between SIS |
|
33
|
Tue May 10 23:10:25 2022 |
Sebastian, Patrick, Volker, Guy | Accelerator | T-Scraper Reloaded | We have established a Control to "manually"
move the T-Scrapers via a "remote desktop".
We can now move both scrapers in the horizontal |
|
62
|
Thu May 12 15:21:23 2022 |
Sebastian, Simon | Laser | Flash lamps changed | We (Sebastian and I) changed the flash lamps
of the Quanta Ray Laser and measured the
output energy of the laser system afterwards |
|
67
|
Fri May 13 11:46:51 2022 |
Sebastian, Simon | | Laser energy | We (Sebastian and I) measured the output
energy of the laser system again.
All values in [mJ] and over 500 laser-pulses |
|
27
|
Tue May 10 11:59:45 2022 |
Simon, Christopher, Kristian, Sebastian | Laser | Labview VI checkups | The lower limit (to position) of the Cobra
control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 |
|
39
|
Wed May 11 06:41:32 2022 |
Simon, Christopher, Shahab | Runs | shifts | new shift started. |
|
40
|
Wed May 11 06:47:58 2022 |
Simon, Christopher, Shahab | Runs | restart laser scan |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
41
|
Wed May 11 07:28:39 2022 |
Simon, Christopher, Shahab | General | DAQ Loop for shifters | Procedure:
- Scanning phase ends (on LabView wait until |
|
58
|
Thu May 12 11:31:11 2022 |
Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan | General | Runs morning shift |
[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after |
|
55
|
Thu May 12 10:10:35 2022 |
Simon, Christopher, Wilfried, Sebastian | DAQ | 1ms gated PMT north / middle added to DAQ | We added on DAQ1 and DAQ2 1ms gated PMT North
and PMT Middle signals.
Now we "supress" the signal by a factor of |
|
14
|
Fri May 6 16:29:03 2022 |
Simon, Patrick | Detectors | PMT preparation | We changed PMT north and PMT south and tested
them at 1500 V.
|
|
23
|
Mon May 9 19:05:17 2022 |
Wilfried | DAQ | Q-Switch signals + 0.5 ms and +1 ms in VUPROM | We have generated two additional signals which
are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
|
|
94
|
Mon May 30 21:52:08 2022 |
Wilfried, Danyal, David, Rodolfo | General | Position of T-Scrapers | We have determined the position of the H-like
208Bi ion beam using the T-Scrapers. The
position actually did not change in comparison |
|