HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, all entries  Not logged in ELOG logo
ID Date Authorup Category Subject
  5   Tue Apr 26 16:28:14 2022 CarstenDAQCable of Bunch HF disconnected and 1.995Mhz signal connected for DAQ tests
see subject.
  19   Mon May 9 16:58:41 2022 CarstenDetectorsVoltage particle dectectors NA_SZ und SA_SZ switched on
Voltage SA_SZ (capture behind cooler): 1500 V (thin plastic scintillator)
Voltage NA_SZ (capture behind target): 750V (thick plastic, short absorption length)

Voltages and thershholds from thorium run, still to be verified.
  20   Mon May 9 17:01:02 2022 CarstenDAQdirectories / paths / comments / reduction factors /startup.scom files for the 2 DAQs
DAQ1 (original):
-user atplaser
-runs on lxg1050
-data in lxg1297:/data.lcoal2/208Bi
-go4 in ~/go4/208Bi
-mbs /esr/usr/atplaser/mbsrun/208Bi

Since the Go4 Code is still under development (clean up etc.), I still plan to submit regular updates, the last version before is always in ~go4/208Bi
It is planne that all essentialy settings can be done via the automatically loaded script files SetParamters.C and SetConditions.C, so that no recompilation (and change of code) is required (work in progress).

DAQ2 (new / enhanced):
additional 25ps TDC and ADC
-user stoe_exp
-runs on lxg0155
-data in lxg0155:/data.lcoal2/E128
-go4 in ~/E128
-mbs /esr/usr/stoe_exp/E128

There are no two different startup-files on each system (startup.scom and startup0.scom)
i.e. @startup0 in mbs -> Starts everything WITHOUT file writing
and @startup in mbs -> Starts everything WITH file writing (including onnect rfio and open file). For this, rawDispRFIO64, has to be started (locally __IN__ the data directory).


Please note that the different path and file names are on purpose, so that they can be distinguished after the run.
  21   Mon May 9 17:14:02 2022 CarstenDAQNTCAP DAQ
The NTCap DAQ computer in the HKR (Schottky logbook) is started, and all preparations for data taking (mounting of NAS etc.) are done.
Parameters for NTCAP DAQ will be adjusted as soon as beam is available. 
  22   Mon May 9 17:16:34 2022 CarstenAcceleratorImportant: New ESR pattern - requies action for XUV detector in/out
The ESR pattern is enhanced compared to the thorium experiment by additional machines that can be  used for cooling/waiting in order to optimize 208Bi yield.
As a consequence, the sub chain numbers (previous: virtuelle Beschleuniger) are changed. The new numbers still have to be dialed in into the devices in the Messhütte and the automatic in/out of the XUV-detector tested-
  71   Mon May 16 17:15:56 2022 CarstenAnalysisDAQ /Analysis - shift of peaks in the accumulated spectra, changes in code
After a phone call with Wilfried I implemented an offset to all hit channels of the stacked / accumulated spectra where one chekcs the timing peaks.

Therfore, I made a copy of the analysis in 208Bi1 (one "1" at the end). And here, in the file TLdaAnlProc.cxx I added an offset of +70 to the hit channel (variable UInt_t hit, around line 335 /336 of the code).
Pleasse note that I just inlcuded one line with a "magic" number here, since I cannnot test teh compiling and was afraid to introduce an error.

So the lines were

UInt_t hit =tdcSE[i][j];

changed to 

UInt_t hit =tdcSE[i][j];
hit = hit + 70;

Plesaede note that you need to recompile and check and set all conditions for the time-preak window.

So , you now use the analysis in 208Bi1
  83   Fri May 27 20:39:50 2022 CarstenAnalysisShort Manual for updated Go4 DAQ (version 2022_05_27)
Short descriptions of the most recent version of the GO4 code is attached. I will install the corresponding vesion early on sunday.
Attachment 1: Short_Introduction_to_the_208Bi_Go4_Analysis.pdf
Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf Short_Introduction_to_the_208Bi_Go4_Analysis.pdf
Attachment 2: Short_Introduction_to_the_208Bi_Go4_Analysis.odt
  91   Mon May 30 19:00:19 2022 CarstenGeneralScraper Settings and Parameters for the last measrements with thick target
old Bunch frequency: 1.98777 MHz

Positions PL devices:
GE01DD2AG -23
GE01DD2IG 3
GE02DD2_G -35
GE02DS3HG 0


The voltages of the particle detectors were set to:
SA_SZ: 1500V
NA_SZ: 750V
But for the primatry beam measurements the detectors were still switched off

Set values for cooler:
SC3: 223513.377 + DeltaU = 160V
SC6: 223452.14 + DeltaU = 130V
SC9: 223452.14 + DeltaU = 130V

Electron current:
SC3: 300mA
SC6: 100mA (300mA in the second file)
SC9: 100ma (300mA in the second file)

Cooling in SC4: 550x
Cooling in SC7: 50x

Explanation of subchains:
SC4: Cooling at injection orbit
SC5: Ramp to central orbit
SC7: Cooling at central orbit
SC8: Scrapers /particle detectors in, XUV detector in, (~10s), bunching on
SC9: measurement
SC10: not used
SC11: Scrapers/particle detectors/XUV ectros out (~10s), bunching off
Attachment 1: screenshot-2022-05-30_19-12-151030168345517073342_(002).png
screenshot-2022-05-30_19-12-151030168345517073342_(002).png
  93   Mon May 30 20:58:26 2022 CarstenAcceleratorNew Settings for 208Bi Beam
Old SetParameters.C and old SetConditions.C were saved as SetParameters_209.C and SetConditions_209.C

The ion beam settings were changed to 208Bi82+:

SIS energy now: 554.6 MeV/u (was 551MeV/u) + 3.6MeV/u
Cooling voltages were increased by 1830V, i.e.
Delta U SC3: 1990V
DeltaU SC6 / SC9 : 1960V ???
The new frequency is 1.99236615 MHz

DD2AG xx
DD2IG xx
DD2_G xx
DS3_HG xx

SIS intensity is still only about 1e8
  110   Thu Jun 30 11:12:21 2022 CarstenAnalysisUpdated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra)
Here attached is a more recentversion of the Go4 Analysis Code with some smaller bugfixes.
For adaequate *.C files please have alook in 208Bi go4 directory on the atplaser account.
Please note, that there is also a (not fully up-to-date) description/manual somewhere here in the Elog.
Attachment 1: 208Bi_20220629_fix.tgz
  102   Tue May 31 19:59:49 2022 Carsten, DanyalAcceleratorchange in frequency mismatch 208Bi --> 209Bi
time = 20:00 

The RF has been adjusted so that it bunches at the correct frequency for 209Bi 

For 208Bi the settings ("frequency mismatch") were: 
-0.102 in SC5 
-0,102 in SC11  


For 209Bi the settings ("frequency mismatch") are (and were yesterday): 
-0.83 in SC5 
-0,83 in SC11  
  103   Tue May 31 21:08:04 2022 Carsten, MaxDetectorsXUV detector automation off
We deactivated the automation of the XUV detector. It stays out now.
  101   Tue May 31 19:37:30 2022 Carsten, Max, WilfriedDetectorsSASZ and NASZ voltages switched off
SASZ and NASZ voltages were switched off bevor we went back to 209Bi. Laser beam stabilization turned off.
  96   Mon May 30 23:18:06 2022 Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, DanyalRunsRuns shifts 31.05.
These are the first runs with 208Bi.

Time SIS-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops Particle Detector comments
23:11 2.6e8 - 225259 673-677 8182 548 - 549 0.005 2.97s 4 139e3 Resonance found in first scan.
00:09 ? - 225259 678-679 8183 548 - 549 0.005 2.97s 2 92e3
00:45 2.8e8 - 225260 680-681 8184 548 - 549 0.005 2.97s 2 36e3 In this run, the ions seemed to be not ejected with the new request, compare picture.
01:27 2.7e8 - 225260 684-685 8187 548 - 549 0.005 2.97s 2 88e3 Started delayed due to several issues with both DAQs.
01:53 2.7e8 - 225260 686-687 8188 548 - 549 0.005 2.97s 2 93e3
02:20 2.7e8 - 225260 688-689 8189 548 - 549 0.005 2.97s 2 87e3
02:55 2.1e8 - 225260 692-694 8190 548.335 - 548.535 0.0025 4.95s 4 88e3 Scan range changed
03:30 2.75e8 - 225260 696-697 8191 548.335 - 548.535 0.0025 4.95s 3 95e3 Number of loops reduced to 3
03:59 2.6e8 - 225260 698-699 8192 548.335 - 548.535 0.0025 4.95s 3 89e3
04:30 2.7e8 - 225260 700-702 8194 548.335 - 548.535 0.0025 4.95s 3 89e3 DAQ1 needed to be restarted
04:52 2.55e8 - 225260 703-704 8195 548.335 - 548.535 0.0025 4.95s 3 83e3
05:18 2.62e8 - 225260 706-707 8196 548.335 - 548.535 0.0025 4.95s 3 89e3 DAQ2 needed to be restarted
05:44 ? - 225260 708-710 8197 548.335 - 548.535 0.0025 4.95s 3 ?
06:18 2.1e8 - 225260 711-712 8200 548.36 - 548.51 0.0025 4.95s 3 67e3 we changed the timing by 20 ns. The laser pulse is later now. The file number of DAC1 is correct. I do not know why there is the gap to the previous scan
06:51 2.4e8 6e5 225260 713-714 8201 548.36 - 548.51 0.0025 4.95s 3 67e3 xuv-detector parameters were varied
07:09 2.4e8 6e5 - 715- 8202 548.36 - 548.51 0.0025 4.95s 3 68e3 mbs did not start
07:15 2.4e8 6e5 225260 716-717 8203 548.36 - 548.51 0.0025 4.95s 3 68e3 xuv-detector walklevel and treshhold were lowered
07:35 2.4e8 6e5 225259 718-719 8204 548.36 - 548.51 0.0025 4.95s 3 68e3 we changed the timing by additional 20 ns. The laser pulse is later now. - no fluo. visible
08:01 2.4e8 6e5 225259 720-721 no file opened 548.43 - 548.44 0.00001 ~20s 3 71e3 varying the delay with each laser step to find optimum - It was more a plateau between +-30ns (relative to the night shift's position). We now continue data taking at the same dealy as used by the night shift.
08:23 2.4e8 6e5 225258 722 8205 548.36 - 548.51 0.0025 4.95s 3 68e3 xuv-detector walklevel and treshhold were lowered
08:28 2.4e8 6e5 225258 724-725 8208 548.36 - 548.51 0.0025 4.95s 3 68e3
08:48 2.4e8 6e5 225258 727-728 8209 548.36 - 548.51 0.0025 4.95s 3 ? xuv-detector in Park-position just as a try
09:08 2.4e8 6e5 225259 729-730 8210 548.36 - 548.51 0.0025 4.95s 3 ?
09:28 2.5e8 6e5 225259 731-732 8211 548.36 - 548.51 0.0025 4.95s 3 73e3
09:54 2.5e8 6e5 225259 734-735 8212 548.36 - 548.51 0.0025 4.95s 3 175e3
10:19 2.5e8 6e5 225258 737-738 8214 548.36 - 548.51 0.0025 4.95s 3 175e3
10:38 2.5e8 6e5 225258 741-742 8215 548.36 - 548.51 0.0025 4.95s 3 64e3 DAQ2 started late. Missed the first 25 scan numbers Coasting beam measurement from now on
10:57 2.5e8 6e5 225258 743-744 8216 548.36 - 548.51 0.0025 4.95s 3 87e3
11:17 2.5e8 6e5 225258 745 8217 548.36 - 548.51 0.0025 4.95s 3 e3 MBS crashed
11:18 2.5e8 6e5 225257 746-747 8218 548.36 - 548.51 0.0025 4.95s 3 87e3
11:37 2.5e8 6e5 225257 749-750 8219 548.36 - 548.51 0.0025 4.95s 3 87e3 DAQ2 started late. Missed the first 10 scan numbers
11:56 2.5e8 6e5 225257 751 8220 548.36 - 548.51 0.0025 4.95s 3 78e3
12:59 2.5e8 6e5 225257 752 8221 548.385 - 548.485 0.0025 4.95s 3 78e3 RF off from now on, laser scan settings not correct. stopped
13:06 2.5e8 6e5 225257 753 8223 548.385 - 548.485 0.0025 4.95s 3 87e3
13:26 2.5e8 6e5 225257 754 8224 548.385 - 548.485 0.0025 4.95s 3 - MBS crashed
13:29 2.5e8 6e5 225257 755-756 8226 548.385 - 548.485 0.0025 4.95s 3 93e3 RF now really off (wrong cavity was turned off)
13:43 2.5e8 6e5 225257 757-758 8227 548.385 - 548.485 0.0025 4.95s 3 67e3
14:08 2.5e8 6e5 225257 759 8228 548.385 - 548.485 0.0025 4.95s 3 70e3
14:22 2.2e8 6e5 225257 760 8229 548.385 - 548.485 0.0025 4.95s 3 56e3
14:35 2.2e8 6e5 225257 761 8230 548.385 - 548.485 0.0025 4.95s 3 64e3
14:50 2.2e8 6.5e5 225256 762 8231 548.385 - 548.485 0.0025 4.95s 3 59e3
15:04 2.0e8 7e5 225255 763 8232 548.385 - 548.485 0.0025 4.95s 3 58e3
15:28 1.9e8 ?e5 225272 764 8233 548.385 - 548.485 0.0025 4.95s 2 66e3 changed to 200mA cooler current, NTCAP stopped and started again folder: prob. ~31.5.22 13:??, loops decreased to 2
15:37 2e8 6e5 225272 765 8234 548.385 - 548.485 0.0025 4.95s 2 70e3
15:47 2.5e8 6e5 225272 766 8235 548.385 - 548.485 0.0025 4.95s 2 73e3 laser gone at loop 2 scan 35 (15:56), Ecooler went also off
16:17 ?e8 6e5 225272 767 8236 548.385 - 548.485 0.0025 4.95s 2 48e3 bad shot?, probably ecooler reset
16:27 2.2e8 6e5 225271 768 8237 548.385 - 548.485 0.0025 4.95s 2 77e3
16:36 2.0e8 7e5 225272 769 8238 548.385 - 548.485 0.0025 4.95s 2 65e3
16:52 ?e8 ?e5 225272 770 8239 548.385 - 548.485 0.0025 4.95s 2 61e3 we had to restart go4, it was very slow
17:02 2.0e8 7e5 225272 771 8240 548.385 - 548.485 0.0025 4.95s 2 63e3
17:16 2.3e8 7e5 225248 772-773 8241 548.385 - 548.485 0.0025 4.95s 4 45e3 changed to 50mA cooler current, NTCAP stopped and started again folder: 31.5.22 15:18, loops increased to 4
17:36 2.7e8 7.5e5 225248 774-775 8242 548.385 - 548.485 0.0025 4.95s 6 67e3 loops increased to 6
18:05 2.5e8 7.5e5 225248 776-777 8243 548.385 - 548.485 0.0025 4.95s 6 66e3
18:31 1.7e8 6e5 225247 778-779 8244 548.385 - 548.485 0.0025 4.95s 6 44.6e3 SIS pattern looked strange
Attachment 1: 2022-05-31_particles.png
2022-05-31_particles.png
  8   Wed May 4 22:45:12 2022 Carsten, SebastianDAQQ-Switch Signal (ch15) fixed
The "dead" Q-Switch signal was converted 
two times... This explains why in the 
Thorium experiment the Q-Switch signal 
(ch15) was empty. 

First conversion from TTL to NIM in the 
ESR Laserlab and unfortunately the signal 
was plugged in a second Level Adapter as 
TTL in 
the Messhütte and was "again" converted 
into a NIM for DAQ1/2.

Now the Q-Switch is converted from TTL to 
NIM in the ESR Laserlab. The NIM is 
afterwards guided through a Logic Fan 
In/Out to the 2 DAQs. 
  100   Tue May 31 19:32:56 2022 Carsten, Wilfried, MaxCalibrationelectron cooler calibration voltage - frequency
SetVoltage (DeltaU) MeasVoltage freq Current
+1950V 225247V 245.06725 50 mA
+1950V 225255.4V 245.0595 100 mA
+1960V 225266.4V 245.062125 100 mA
+1970V 225276.8V 245.064185 100 mA
+1980V 225286.6V 245.066 100 mA
+1990V 225296.1V 245.06775 100 mA
+2000V 225305.1V 245.0695 100 mA
+1950V 225255.5V 245.06 100 mA
+1940V 225246.0V 245.058125 100 mA
+1930V 225236.0V 245.05625 100 mA
+1920V 225226.0V 245.0545 100 mA
+1910V 225216.7V 245.052625 100 mA
+1900V 225205.8V 245.050375 100 mA
+1850V 225156.5V 245.041 100 mA
+1800V 225106.6V 245.031375 100 mA
+1950V 225256.1V 245.060125 100 mA
+2000V 225306.0V 245.06975 100 mA
+2050V 225355.8V 245.079375 100 mA
+2100V 225406.0V 245.0890 100 mA
+1950V 225256.2V 245.060125 100 mA
Change electron current and note down High Vltage and revolution frequency
NTCAP was restarted at the beginning and stopped at the end of the measuring period.
The NTCAP folder is 05-31_17-16-49 (system time 19:11)
  109   Fri Jun 3 12:01:17 2022 DanyalDetectorsswitched off XUV detector on 1 June ~17:00
I have switched off the XUV detector on 1 June at about 17:00. 
The high voltages of the MCP (in ESR laser lab) were turned off and inside the ESR cave the power supplies (coils and cathode) and the crate were turned off. 
Also the new "control box" for the detector was switched off. 
And I checked (visually) that the XUV detector (and the Cu detector too) were indeed "moved out". 

Danyal
  68   Fri May 13 16:55:58 2022 Danyal, Carsten, Phillip, WilfriedGeneralEnd of E128 Beamtime
Dear all,

unfortunately, the E128 experiment must now come to an early end. 
The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
Several things were tried, but without hope. 

Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 

Best wishes,

Wilfried
  31   Tue May 10 22:29:45 2022 Jan GloriusDAQDAQ2 shaper settings
Attached are the MSCF shaper settings applied on Tue May 10 at 22:30.
Attachment 1: setting_e128.v1
1652214506
Tue May 10 22:28:26 CEST 2022
e127pi:mrcc:mscf2:getGainCommon 15
e127pi:mrcc:mscf2:getShapingTimeCommon 0
e127pi:mrcc:mscf2:getThresholdCommon 200
e127pi:mrcc:mscf2:getPzCommon  255
e127pi:mrcc:mscf2:getGain1     15
e127pi:mrcc:mscf2:getGain2     10
e127pi:mrcc:mscf2:getGain3     15
e127pi:mrcc:mscf2:getGain4     15
e127pi:mrcc:mscf2:getShapingTime1 0
e127pi:mrcc:mscf2:getShapingTime2 0
e127pi:mrcc:mscf2:getShapingTime3 0
e127pi:mrcc:mscf2:getShapingTime4 1
e127pi:mrcc:mscf2:getThreshold1 255
e127pi:mrcc:mscf2:getThreshold2 3
e127pi:mrcc:mscf2:getThreshold3 4
e127pi:mrcc:mscf2:getThreshold4 255
e127pi:mrcc:mscf2:getThreshold5 222
e127pi:mrcc:mscf2:getThreshold6 2
e127pi:mrcc:mscf2:getThreshold7 20
e127pi:mrcc:mscf2:getThreshold8 255
e127pi:mrcc:mscf2:getThreshold9 2
e127pi:mrcc:mscf2:getThreshold10 10
e127pi:mrcc:mscf2:getThreshold11 255
e127pi:mrcc:mscf2:getThreshold12 255
e127pi:mrcc:mscf2:getThreshold13 100
e127pi:mrcc:mscf2:getThreshold14 255
e127pi:mrcc:mscf2:getThreshold15 255
e127pi:mrcc:mscf2:getThreshold16 255
e127pi:mrcc:mscf2:getPz1       100
e127pi:mrcc:mscf2:getPz2       100
e127pi:mrcc:mscf2:getPz3       100
e127pi:mrcc:mscf2:getPz4       100
e127pi:mrcc:mscf2:getPz5       100
e127pi:mrcc:mscf2:getPz6       100
e127pi:mrcc:mscf2:getPz7       100
e127pi:mrcc:mscf2:getPz8       100
e127pi:mrcc:mscf2:getPz9       100
e127pi:mrcc:mscf2:getPz10      100
e127pi:mrcc:mscf2:getPz11      100
e127pi:mrcc:mscf2:getPz12      100
e127pi:mrcc:mscf2:getPz13      100
e127pi:mrcc:mscf2:getPz14      100
e127pi:mrcc:mscf2:getPz15      100
e127pi:mrcc:mscf2:getPz16      100
e127pi:mrcc:mscf2:getSingleChMode 1
e127pi:mrcc:mscf2:getRcMode    1
e127pi:mrcc:mscf2:getAutoPZ    18
e127pi:mrcc:mscf2:getMultiplicityHi 8
e127pi:mrcc:mscf2:getMultiplicityLo 0
e127pi:mrcc:mscf2:getSumTrgThresh 18
e127pi:mrcc:mscf2:getBlrOn     1
e127pi:mrcc:mscf2:getCoincTime 121
e127pi:mrcc:mscf2:getThreshOffset 70
e127pi:mrcc:mscf2:getShaperOffset 35
e127pi:mrcc:mscf2:getBlrThresh 25
e127pi:mrcc:mscf2:getECLDelay  18
  32   Tue May 10 22:37:10 2022 Jan GloriusDAQDAQ2 cabling docu
Attachment 1: e128_daq2_cabling.ods
  89   Mon May 30 09:28:43 2022 Ken, Kristian, Simon, RaganDetectorsXUV-Detector
9:27 XUV-Detector is running again.

-5V cathode, 8A main coil, 2.4A sec.coil
Rate without beam was: 
Park position: ~300Hz 

Pump beneath the detector is now shut down, new rate: <10Hz.

Threshold was adjusted to trigger only on "nice" signals. 

Rate with beam in and laser:
Park position: ~400Hz
147mm: ~1.4kHz
 
with 2e6 ions
  43   Wed May 11 14:48:31 2022 KonstantinDAQVoltage range of the Keysight DMM changed from 10V to 1V
During the setup of the ion beam the voltage range of the Keysight DMM was changed from 10V to 1V. Additionally, the name of the high-voltage divider was adjusted (this changes only the filename of the file, which is stored at the local pc decpc003).
Attachment 1: VoltageRangeChanged.png
VoltageRangeChanged.png
  61   Thu May 12 14:04:09 2022 KonstantinDAQGo4 Laserstep histograms adapted
In order to correctly display the gated PMT signals PMT Middle and PMT North some modifications in the Go4 code were necessary. Affected files are TLdaAnlProc.cxx, TLdaAnlProc.h and TLdaInputDescription.h.
Modifications are indicated according to the scheme "//-- HH:MM mm-dd-yyyy: <description>" (an example is given in the attached screenshot). They were needed to

  1. Create relevant histograms (change of variable MAX_STEP from 10 to 13 and insertion of histogram names "QSWP1MS", "NORTH_GATED" and "MIDDLE_GATED" in the std::string array stepNames.
    Both adaptions were made in TLdaInputDescription.h)

  2. Fill the respective histograms. Changed lines of files TLdaAnlProc.cxx, TLdaAnlProc.h are listed below.

filename modified lines
TLdaAnlProc.h 47
TLdaAnlProc.cxx 258-261, 381-394, 442-443, 484-494, 536-542
Attachment 1: Go4Modifications.PNG
Go4Modifications.PNG
  80   Tue May 17 10:38:44 2022 KonstantinDetectorsPMT North changed
PMT located at the northern window was again replaced by the narrow-band PMT (ET Enterprise type 9423 SB, SN: 650).
  85   Mon May 30 01:13:40 2022 Konstantin, Max, PatrickDetectorsXUV-Detector voltage off
XUV-Detector shows up to 100 kHz and, therefore, was turned off.
  106   Wed Jun 1 00:16:02 2022 Konstantin, SimonDAQTiming 209Bi thick target
Timing for the final measurements on 209Bi was determined for the new frequency 1.93777MHz. Peak positions are

PD NO 106
PD SO 141.5
PMT MIDDLE 45 (due to the broad temporal structure difficult to determine)

Center between PDs is 123.75. Difference to PMT MIDDLE is 78.75. This is ~3 bins larger than the half period of 75. 
Attachment 1: Timing_209Bi_final.png
Timing_209Bi_final.png
  105   Wed Jun 1 00:03:08 2022 Konstantin, Simon, KristianRuns209-Bi runs
Time SIS-intensity ESR-intensity after orbit change cooler-HV cooler current (mA) LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
23:40 - - 223432 100 781 8246 601.735 - 601.95 0.005 4.95s 2 resonance found but problems with go4
00:02 - 5.5e6 223432 100 783 8248 601.735 - 601.95 0.005 4.95s 2 resonance not in the middle of the scan range
00:14 - 4.5e6 223432 100 784 8249 601.7 - 601.9 0.005 4.95s 2 change the scan range
00:14 - 1.1e7 223432 100 785 8250 601.7 - 601.9 0.005 4.95s 2
00:35 - 9e6 223432 100 786-787 8251 601.7 - 601.9 0.005 4.95s 4
00:50 - 6.5e6 223432 100 788-789 8252 601.7 - 601.9 0.005 4.95s 4
01:07 2.2e8 1.15e7 223432 100 790-791 8253 601.7 - 601.9 0.005 4.95s 4
01:26 2.3e8 1.15e7 223448 200 792 8254 601.7 - 601.9 0.005 4.95s 2 switched to coasting beam, changed ESR current
01:37 2.2e8 1.15e7 223448 200 793 8255 601.7 - 601.9 0.005 4.95s 2
01:48 2.2e8 1.15e7 223448 200 794 8256 601.7 - 601.9 0.005 4.95s 2
01:58 2.2e8 1.15e7 223448 200 795 8257 601.7 - 601.9 0.005 4.95s 2
02:08 2.2e8 1.15e7 223448 200 796 8258 601.7 - 601.9 0.005 4.95s 2
02:19 2.15e8 1.15e7 223432 100 797-799 8259 601.7 - 601.9 0.005 4.95s 6 changed ESR current again
02:45 2.17e8 1.15e7 223432 100 800-802 8260 601.7 - 601.9 0.005 4.95s 6
03:12 2.12e8 1.15e7 223423 50 803-805 8261 601.7 - 601.9 0.005 4.95s 6 changed cooler current again, restarted NTCAP folder 2022-05-31_19-33-57
03:38 2.2e8 1.15e7 223423 50 806-808 8262 601.7 - 601.9 0.005 4.95s 6
04:05 2.13e8 1.15e7 223427 75 809-811 8263 601.7 - 601.9 0.005 4.95s 6 changed cooler current again, restarted NTCAP folder 2022-06-01_03-12-03
04:30 2.03e8 1.15e7 223427 75 812-814 8264 601.7 - 601.9 0.005 4.95s 6
04:57 2.08e8 1.15e7 223440 150 815-817 8265 601.7 - 601.9 0.005 4.95s 6 changed cooler current again, restarted NTCAP folder 2022-06-01_04-04-32
05:21 2.1e8 1.15e7 223440 150 818-820 8266 601.7 - 601.9 0.005 4.95s 6
05:57 2.08e8 1.15e7 223440 150 821-823 8267 601.7 - 601.9 0.005 4.95s 6 laser power reduced from 46.2mJ to 25mJ
06:25 1.5e8 9e6 223440 150 824-826 8268 601.7 - 601.9 0.005 4.95s 6
06:56 2.1e8 1.15e7 223440 150 827-829 8269 601.7 - 601.9 0.005 4.95s 6 Laser power reset to 48mJ. Last ion injection!!!
07:18 - 4.7e6 223439 150 830-832 8270 601.7 - 601.9 0.005 4.95s 6 Last ion injection!!!
7:40 - 2.0e6 223439 150 833-834 8271 601.7 - 601.9 0.005 4.95s 6 old beam
8:02 - 1.0e6 223439 150 835-836 8272 601.7 - 601.9 0.005 4.95s 6 older beam
8:25 - 5e5 223439 150 837-8 8273 601.7 - 601.9 0.005 4.95s 6 very old beam
8:48 - 3e5 223439 150 839-840 8274 601.7 - 601.9 0.005 4.95s 6 very very old beam
9:10 - 2e5 223439 150 841-842 8275 601.7 - 601.9 0.005 4.95s 6 beam close to retirement - no signal anymore


9:33 beam retired. Turned laser off. Stopped NTcap

post beamtime change: replaced "ESR current" by "cooler current" in the comments column. (Wilfried)
  81   Fri May 27 10:39:53 2022 KristianDAQPMT North noise
During the last run, PMT North showed some weird noise.

The PMT was replaced by the deep UV PMT with small aceptance range (100-200nm) but there was still a lot of noise on the output channel in the Messhütte, see attached photo. The intensity of the noise signal was as strong as a normal signal count.

I replaced all cables and used other preamplifier channels. The noise is gone and the baseline is flat now. However, the timing of PMT north will be a bit different now, so we should use PMT middle for the laser/ion overlap as we did before.

Graziano opened the valves for the laser and turned off the vacuum gauges and emergency lights. The background of the UV PMT looks normal (Middle 10 Hz, North 1 Hz) so I think we are fine here.
Attachment 1: IMG_20220527_095501.jpg
IMG_20220527_095501.jpg
  90   Mon May 30 16:17:39 2022 Kristian, David, Wilfried, Carsten, Danyal, RodolfoRunsAfternoon shift 30.05
These are the first runs after changing to the thick stripper foil.

Time ESR-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
16:15 ? 5.0e6 223439 669-670 8180 601.95 - 601.734 0.005 5s 5 Resonance found in first scan. electron cooling current 100mA
16:45 ? 5.0e6 223439 671-672 8181 601.95 - 601.734 0.005 5s 5 electron cooling current 300mA


Width approximately the same with the higher electron current.
next we go to 208Bi
  107   Wed Jun 1 08:39:50 2022 Kristian, KonstantinCalibrationWavemeter reading
We recorded files with high wavemeter readout rate and saved it at the atplaser network drive (Q:) - Bismuth - wavemeter folder.

Could be used to calibrate the laser steps. The MBS readout rate is 4 Hz, here 30 Hz, so there are a few more values.
  88   Mon May 30 08:35:41 2022 Kristian, Simon, Ken, RaganDetectorsChanged PMT North
We did not see any signal at PMT North which was the narrowband PMT. Changed it to the old solar blind PMT. Now we see the resonance. It is about 3 times larger as PMT middle, most likely because of the larger window. CFD threshold was set. I also increased the CFD threshold for PMT middle slightly.


HV for  PMT North: 1600 V
  64   Thu May 12 15:50:33 2022 MaxAcceleratorNo ESR beam
Since 13:30 we have no beam in the ESR. There is a problem with the ESR septum.
The magnets department is investigating.
  98   Tue May 31 15:19:58 2022 Max, Carsten, DanyalGeneralscans for different E-cool currents
until 15:15 we have measured with I_e = 100 mA (3 loops per file) 
E_cool HV = 225255 V 


after that (at 15:26) we changed to I_e = 200 mA (2 loops per file) 
E_cool HV = 225272 V 

after that (at 17:15) we changed to I_e = 50 mA (first 4 then 6 loops per file) 
E_cool HV = 225247 V 
  99   Tue May 31 17:22:09 2022 Max, Carsten, Danyal, Rodolfo, WilfriedGeneralchange E-cooler current I_e = 50 mA
At 17:15 we changed again the E-cooler current I_e = 50 mA  
(4 laser scan loops per injection) 
E-cool HV = 225248 V 
  72   Mon May 16 17:38:38 2022 Max, Danyal, Wilfried, RodolfoGenerallaser bunch timing
We overlapped the laser and ion bunch in the time domain. 
Therefore we delayed the bunching HF in order to see the PMT signal between bin 10 and 22. Before the signal Peak was in channel ~145-5 and difficult to gate on.
Afterwards we also have to shift the laser.
The new values are:

PD NO: 77.5
PD SO: 113
Ion bunch: 16.5 
Attachment 1: timing1605.png
timing1605.png
  63   Thu May 12 15:34:47 2022 Max, Kristian, SebastianDAQlaser scan, laser step and laser busy checked
We checked all three signals in the Messhütte. Laser scan and laser step are OK.
The Laser busy signal is for large increments (0.1nm) also fine. For short increments like our usual 0.005nm increment the signal is irregularly.
Likely the laser busy status is too short.
  84   Mon May 30 00:56:33 2022 Max, PatrickLaserBeam overlap
The ion beam positions are (+- 1mm):


devicemove in dir.scratch (mm)gone (mm)gone +- 4.5 (mm)x0 (mm)
GECEDS1VUup -1.5 0.7 5.2
GECEDS1HAright -26 -22 -17.5 -4.7
left -10.0 -13.0 -17.5
GECEDS2VUup -2.0 0.0 4.5
GECEDS2HAright -22.0 -18.5 -14.0 3.1
left -6.0 -9.5 -14.0



Notes:
  • In between a measurement the scrapers stopped working in the device control. Therefore, we had to go into the electronics room.
  • Position to scratch charge transferred beam: S1HA at -35.
  • Beam diameter is roughly 6-7 mm (horizontally) and 4 mm vertically (as opposed to 1-2 mm).
  • The charge transferred ion beam seems to shift the position of the main beam over time (1cm / 2h) as the main beam "transfers its intensity".
Attachment 1: 2022-05-30_laser_beam.png
2022-05-30_laser_beam.png
Attachment 2: 2022-05-30_beamstab_settings.png
2022-05-30_beamstab_settings.png
  86   Mon May 30 02:12:20 2022 Max, Patrick, ~Konstantin, Ragan, KenRunsruns night shift 30.05.
These are the first runs of the substitute beamtime.

Time ESR-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
02:00 ? 8.0e6 223217 632 8158 601.95 - 601.734 0.005 5s 5 Resonance found in first scan. The resonance is much broader due to a broader ion beam.
02:28 ? 7.0e6 223217 633 8159 601.9 - 601.7 0.005 5s 5 Same injection.
02:52 ? 6.3e6 223217 634 8160 601.9 - 601.7 0.005 5s 5 Same injection. Adjusted gates in go4.
03:14 ? 5.6e6 223439 637 8163 601.9 - 601.7 0.005 5s 5 Same injection. Auto-impedance enabled -> correct voltages. NTCAP started shortly after scan start.
03:35 ? 3.0e5 ? (under range) 223439 639 8164 601.9 - 601.7 0.005 5s 5 Scraped the lower charge state beam by moving S1HA to pos. -30 (from the left).
04:50 ? 1.1e7 223439 640 8165 601.9 - 601.7 0.005 5s 5 Laser beam position slightly corrected for new ion beam position, see ID:84.
05:05 ? 1.0e7 223439 641 8166 601.9 - 601.7 0.005 5s 5 See picture (this + previous run)
05:21 ? 1.0e7 223439 642 8167 601.9 - 601.7 0.005 5s 5 Moved S1HA to -35 to get rid of the charge transferred beam.
05:33 ? 9.0e6 223439 644 8169 601.9 - 601.7 0.005 5s 5
05:52 ? 9.0e5 223439 645 8170 601.9 - 601.7 0.005 5s 5 Scraped main beam for lower beam intensities.
There were some issue with the acquisition, and thus there are some empty files
06:08 ? 4.e5 223438 650- 8172 601.9 - 601.7 0.005 3s 25
07:11 ? 1.15e7 223438 653 8173 601.9 - 601.7 0.005 3s 25 laser scan was not started
07:17 ? 1.03e7 223438 654-656 8174 601.9 - 601.7 0.005 3s 25
08:33 ? 6e6 223438 658-660 8176 601.9 - 601.7 0.005 3s 25 ESR scraper not in
09:27 ? 5.5e6 223438 661-667 8178 601.9 - 601.7 0.005 3s 25 XUV detector running again, signal of PMT north and middle in att. 2
10:15 ? <<1e6 223438 668 8179 601.9 - 601.7 0.005 3s 25 very low beam intensity


Note: PMT north does not see a resonance.

Note: PMT north does see a resonance after changing to the broadband PMT.
Attachment 1: 2022-05-30_resonance_10_loops.png
2022-05-30_resonance_10_loops.png
Attachment 2: 48_AM.png
48_AM.png
  104   Tue May 31 21:58:55 2022 Max, RodolfoLaserMRC Settings for 209Bi
We have change the laser settings for the spectroscopy of 209Bi.

We have now T-scraped the laser beam to the old position of the ion beam. The settings for the MRC system are shown in the screenshot below.
Attachment 1: MRC_209Bi_31-05-2022_2157.png
MRC_209Bi_31-05-2022_2157.png
  74   Mon May 16 19:20:55 2022 Max, WilfriedAnalysisstart go4 before laser scan
It is necessary to start go4 before you start the laser scan. Otherwise you get an offset in the laser Step plots.
  50   Wed May 11 22:45:22 2022 Max, Wilfried, PatrickGeneralscanning wavelength
The scan parameters for the next shift are:

in COBRACONTROL:

increment: 0,005nm

from position: 601,62nm

to position: 601,405nm

These are the wavelengths in air!


The wavelength in vacuum we expect is: 601.832nm

You can check the current wavelength in vacuum on the wavemeter in the LabView GUI.

edit: In the night shift, we checked the scanned vacuum wavelengths in the wavemeter and also checked the expected transition wavelength.
The resonance should be very much in the center of the above mentioned scan range.
The increment corresponds to 4.1 GHz steps. Is this small enough?
  49   Wed May 11 22:19:17 2022 Max, Wilfried, VolkerLaserlaser bunch timing
We overlapped the laser and ion bunch in the time domain. The delay has to be set on the module above the laser and NOT in the ESR Messhütte!

The values are:

PD NO: 63
PD SO: 98.5
Ion bunch: 150 
Attachment 1: timing10_5_22.png
timing10_5_22.png
  65   Thu May 12 16:35:17 2022 Max, Wilfried, ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNING
The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
Maybe tomorrow in the morning briefing there will be more information about this.

The night shift will not take place!
The morning shift starts at 9:00 or on further notice!

The PMTs are switched off and the laser also.
  54   Thu May 12 03:25:37 2022 PatrickDAQLaser scan complete signal off
As in ID:46, the 'laser scan complete' again is not coming in.
It is not very useful to repeatedly fix cable contact problems.
Therefore, Carsten is adding a 'number of steps' line to the config file to "repeat" the x-axis.
  76   Mon May 16 22:19:54 2022 PatrickDAQKeep go4 running (in theory), MBS
To accumulate more data into the opened go4, do not restart MBS, but just

sto ac
clo fi
open file lxg1297:/data.local2/208Bi/208Bi -auto -rfio
sta ac

Note: This does not work, because go4 somehow accumulates ~5 extra laser steps when starting a new scan which results in an x-axis-offset between the runs.
  51   Wed May 11 23:34:39 2022 Patrick, CarstenDetectorsParticle Detectors / Scraper positions
Voltages of particle detectors off.

Scraper positions:

GE02DS3HG: -8
GE01DD2AG: -25
GE01DD2IG: 6
GE02DD2_G: -30
  97   Tue May 31 03:18:52 2022 Patrick, KonstantinLaserLaser timing
The final timings are (in bins +-1):

PD NO: 103
PD SO: 138
PMT middle: 44
e-cooler = (PD NO + PD SO) / 2: 121
e-cooler - PMT middle: 77
roundtrip / 2: 75
roundtrip / 2 + 10ns: 78
  78   Tue May 17 00:44:01 2022 Patrick, KristianDAQChanged PMT North CFD channel
In run 8134 - 8135 PMT North showed a super high background rate. After the scan we checked the signal cables.

Incoming signal was still good until CFD. We changed channel from 2 to 12. New threshold is 36, was 10.
  77   Mon May 16 22:57:40 2022 Patrick, Kristian, David, Ruijiu DetectorsSwitched off nitrogen
Background counts with nitrogen and air.
Less multiphoton events with air (see pictures, histogram extended to 30 with nitrogen).


Read in 4_Lasersteps/Counts

nitrogen:
XUV: 15e4
Middle: 8e4
North: 9e4

air:
XUV: 13e4
Middle: 1.2e4
North: 0.7e4
Attachment 1: 2022-05-16_PMTs_after_nitrogen_off.png
2022-05-16_PMTs_after_nitrogen_off.png
  87   Mon May 30 02:33:45 2022 Patrick, MBS MaxDAQMBS procedure
It is possible to keep go4 running now. Summary of the procedure:

DAC1: open file lxg1297:/data.local2/208Bi/208Bi -auto -rfio
DAC2: open file lxg0155:/data.local2/E128/Bi -auto -rfio
sta ac
start go4

measure

stop go4
sto ac
clo fi

repeat
  15   Fri May 6 16:41:57 2022 Patrick, RodolfoLaserWavemeter
We coupled the laser through a multi-mode fiber into the wavemeter.
With the main amplifier enabled, we got enough power behind the fiber (0.5 - 1.5 mW) to use the wavemeter with 34 ms exposure time (1s / 30Hz to prevent jumps in the wavemeter readout).

Pictures below: 
1: First test scan with 34ms exp. time.
2: Comp. too large laser power (2. scan duoblet) vs. attenuated power (right scan doublet). The latter has less hickups.
3: Laser scan with attenuated power in go4.

The measured frequencies in the first scan step are unstable in any case.

Spikes (rather "second wavelength the laser is regulrarly jumping to") can be removed by adjusting the fiber coupling with the mirrors (change of interference pattern) or the L/2-waveplate (change of coupled power).
However, during (and after) the scan the spikes seem to reappear.
Attachment 1: Screenshot_(4).png
Screenshot_(4).png
Attachment 2: Bi2022_laserscan_test.PNG
Bi2022_laserscan_test.PNG
  35   Wed May 11 01:09:07 2022 Patrick, Sebastian, Volker, GuyLaserBeam overlap
We overlapped the laser with the ion beam.

The ion beam positions are:
devicemove in dir.scratch (mm)gone (mm)gone + 4.5 (mm)x0 (mm)
GECEDS1VUup -3.0 -2.71.8
GECEDS1HAright -21.9 -20.9 -16.4 -4.7
left -12.0 -13.1
GECEDS2VUup -3.8 -2.91.6
GECEDS2HAright -19.2 -18.4 -13.9in [-0.1, 4.3]
left -9.0 -9.7

We used the "gone + 4.5" column where the scraper is in the middle of the ion beam to adjust the laser.

Picture 1: Final beam position.
Picture 2: Final MRC settings.

Note 1: By switching to the "real" bunching frequency, the laser went out of the stabilization. We restarted the MRC system and shifted the laser back into position with the piezo mirror, looking at the first screen (without amplifiers!).
After enabling everything again, the before found settings did not correspond to the correct beam position anymore, so we overlapped again.

Note 2: After the repositioning, the horizontal screw was at its limit and the beam stabilization failed. We moved the screw away from the limit while still hitting the screen and restarted the MRC system. The laser could then be stabilized again.
Attachment 1: 2022-05-11_final_laser_spot.PNG
2022-05-11_final_laser_spot.PNG
Attachment 2: 2022-05-11_final_MRC_settings_2.PNG
2022-05-11_final_MRC_settings_2.PNG
  36   Wed May 11 03:10:55 2022 Patrick, Sebastian, Volker, Guy LaserLaser - bunch timing
We added the delay and gate generator in between the bunch trigger and the CFD to move the timing of the PMT middle signal relative to the photodiodes north and south.
The center value of PD-North is at 19 bins, PD-South at 55 bins, the middle is therefore at 37 bins. The PMT peak should be half a revolution, ie 75 bins further in the histogram, giving a peak position of 112, from which then 3 bins are subtracted to account for the distance of the PMT-middle from the center of the straight section. So all in all the delay is adjusted so the PMT-middle peak appears at 109 bins (see attached plot).
Attachment 1: 2022-05-06_Bi2023_laserscan_test.png
2022-05-06_Bi2023_laserscan_test.png
  37   Wed May 11 03:17:14 2022 Patrick, Volker, Guy RunsStart laser scanning
Runs of the night shift. The wavelength range is 601.95 - 601.735 nm.
We started the wavemeter python script on atppc023 located in Desktop/wavemeter_Bi.
We changed the wavelength range in go4 to the actual scan range.

Questions:
There are many other masses/isotopes/etc. visible in the Shottky spectrum. Is this wanted?
Are the vacuum gauges turned off?
Laser timing correct? +- 3 bins?

TimeSIS-intensitycooler-HVLMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm)step width(nm)dwell time(s)comments
03:30 ?e7 223218 373 8073 601.95 - 601.735 0.005 5s 2 loops
03:38 9.0e7 223218 374-377 8074 601.95 - 601.735 0.005 5s 8 loops from now on
04:15 8.4e7 223218 378 - 381 8075 601.95 - 601.735 0.005 5s
04:49 7.4e7 223217 382 - 385 8076 601.95 - 601.735 0.005 5s
05:23 6.4e7 223216 386 - 388 8078 601.95 - 601.735 0.005 5s 8077 was skipped due to some "server socket locked"-error
05:59 8.9e7 223218 389 - 391 8079 601.95 - 601.735 0.005 5s
  53   Thu May 12 00:16:13 2022 Patrick, Volker, Guy, Rui-JiuRunsRuns night shift

Time SIS-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
00:15 ~1.0e8 1.0e7 223219 433 - 435 8094 601.62 - 601.405 0.005 5s 4
00:47 3.7e8 2.0e7 223219 436 - 440 8095 - 8096 601.62 - 601.405 0.005 5s 8 increased to 15 injections, still not saturated
Tried 20 injections, got no injection into ESR, so moved back to 15. The scrapers were not moving for quiet some time, even after fixing them. The problem may have been that two ParamModi windows were opened. The injection into the SIS does not work when there are other users performing special operations with the machines.
02:28 1.0e8 1.0e7 223220 441 - 444 8097 601.62 - 601.405 0.005 5s 6
02:54 2.8e8 1.7e7 223219 445 - 449 8098 - 8099 601.62 - 601.405 0.005 5s 6
03:21 ~3e8 ~2e7 223219 DAQ did not write 8100 - 8101 601.62 - 601.405 0.005 5s 6
The vacuum gauge of the e-cooler failed. It was restarted. Apparently, upon changing/fixing anything related to our accelerator pattern, the scrapers forget to move. Then they have to be disabled and enabled again in ParamModi. Also, the injection does not work very well. Either the transition from SIS to ESR fails or we are just skipped completely. After fixing the injection, again the scrapers failed as expected. We keep the scrapers out now.
04:34 2.8e8 1.8e7 223219 DAQ failed, started late 454 - 458 8102 - 8103 601.62 - 601.405 0.005 5s 6 Set max.counts in PMT middle and north to 15 (In file 'SetConditions.C', applied when starting go4). No scrapers used.
05:02 2.5e8 1.7e7 223219 DAQ late, 461 - 464 8104 - 8105 601.62 - 601.405 0.005 5s 6
05:30 2.5e8 1.8e7 223219 465 - 469 8106 - 8107 601.62 - 601.405 0.005 5s 6 Set max.counts in PMT middle and north to 20.
05:57 2.5e8 1.7e7 223219 470 - 474 8108 - 8109 601.62 - 601.405 0.005 5s 6
06:25 2.6e8 1.7e7 223219 475 - 479 8110 - 8111 601.62 - 601.405 0.005 5s 6
06:50 2.4e8 1.6e7 223219 480 - 484 8112 - 8113 601.62 - 601.405 0.005 5s 6
07:24 2.2e8 1.5e7 223219 485 - 489 8114 - 8115 601.62 - 601.405 0.005 5s 6
07:49 - 6.5e6 223219 490 - 493 8116 601.62 - 601.405 0.005 5s 6 UNILAC tunnel will be open for ~1h -> no new beam from SIS available
08:15 - 2.6e6 223219 494 - 496 8117 601.62 - 601.405 0.005 5s 6 UNILAC tunnel will be open for ~1h -> no new beam from SIS available
  29   Tue May 10 20:35:42 2022 Phillip, Wilfried, MaxDetectorsPMT Threshold
Since we have ions in the ring now, we looked at the PMT thresholds and the widths. In order to do so we looked at the Raw Signal directly before the CFD and its output simultaneously. You can now set the threshold just above the noise. If the threshold is too low you will also see flat lines in the oscilloscope when triggered on the CFD output. New values:

PMT Mitte
---
Width: 200 -> 220 (60ns -> 90ns)
Threshold: 20 -> 5

PMT Nord
---
Width: 200 -> 220 (60ns -> 90ns)
Threshold: 12 -> 10

PMT Süd
---
blind.
  48   Wed May 11 22:04:30 2022 Phillip, Wilfried, MaxGeneralspacial laser - ion overlap verified
After the SIS/ESR optimization we checked the spatial overlap with the T-scrapers again.

The values are:
devicemove in dir.scratch (mm)gone (mm)
GECEDS1VUup -3.0 -2.2
GECEDS1HAright -22.9 -22.0
left -11.0 -13.0
GECEDS2VUup -4.5 -2.7
GECEDS2HAright -21.0 -19.6
left -7.8 -8.4


The beam position is approx. as before. The laser position is still good and we have spatial overlap.
  69   Mon May 16 14:20:05 2022 Ragan, Danyal, Carsten, Phillip, Wilfried et al.GeneralE128 Beamtime
> Dear all,
> 
> unfortunately, the E128 experiment must now come to an early end. 
> The problem(s) with the injection septum are severe and no work around solution (with acceptable risks) could be found. 
> Several things were tried, but without hope. 
> 
> Many thanks to everybody involved during the preparation time and the shifts during the beamtime. 
> 
> Best wishes,
> 
> Wilfried

There is beam again in the ESR. The plan is to take beam until tomorrow morning. 
  56   Thu May 12 10:21:30 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralNo Beam
There is no beam in the ESR due to some problem in the UNILAC.
Attachment 1: Screenshot_from_2022-05-12_09-21-38.png
Screenshot_from_2022-05-12_09-21-38.png
  57   Thu May 12 11:30:18 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralBeam is back
Beam is back in the ESR.
Attachment 1: Screenshot_from_2022-05-12_10-32-24.png
Screenshot_from_2022-05-12_10-32-24.png
  59   Thu May 12 12:02:56 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralNo beam
There is no beam in the ESR again.
Attachment 1: Screenshot_from_2022-05-12_11-02-37.png
Screenshot_from_2022-05-12_11-02-37.png
  60   Thu May 12 12:51:30 2022 Ragan, Shahab, Simon, Sebastian, Christopher, WilfriedGeneralBeam is back
12:50 Beam is back again in the ring.
12:52-until now Kicker problem in the ESR.
Attachment 1: Screenshot_from_2022-05-12_11-51-35.png
Screenshot_from_2022-05-12_11-51-35.png
Attachment 2: Screenshot_from_2022-05-12_12-08-52.png
Screenshot_from_2022-05-12_12-08-52.png
  1   Fri Jul 30 10:21:27 2021 RodolfoLaserKink
The laser beamline in the ESR north arc has a knik, therefore the laser beam can not get the "laser tower" in the north east arc. This path is used to get the laser beam up to the electron-cooler side, such that the laser beam co-propagates the ion beam.

In order to try fix this, Markus suggested to get in contact with Herr Kredel (Groß Montage). He will be back from holidays on August 11th (2021).
Attachment 1: Laser_beamline_ESR_NordBogen.jpg
Laser_beamline_ESR_NordBogen.jpg
  2   Fri Apr 22 09:38:24 2022 RodolfoLasergetting ready for Fluorescein548
We are going to change dye. Therefore I have take out the DCM-dye-solution* out of the dye circulators, rinsed them with Ethanol (5 times) and put new filters.

* This was a solution of 0.3 g/l in 1:1 solvent mixture of Ethanol and DMSO.
  3   Mon Apr 25 18:47:12 2022 RodolfoLaserNew dye circulators
I have put into operation the new circulators (SN. 182231, 182201) for our dye laser (the Cobra). I have rinsed them with pure Ethanol first and I have not seen any leaks.

The idea is to use these circulators with either Pyrromethene 597 or a combination of (Rhodamin B + Rhodamin 101).

The "old circulators" (SN. 104830, 104801) will be used together with (Fluorescein 27 + NaOH).
Attachment 1: Neue_Cobra-Farbstoffpumpe.jpg
Neue_Cobra-Farbstoffpumpe.jpg
  4   Mon Apr 25 21:47:28 2022 RodolfoLasergreen instead UV
I am exchanging the optical elements (mirrors and lenses) for the laser spectroscopy on bismuth. At some places I am also exchanging the 3"-mirror holders and installing 2"-mirror holders instead.

* Just in case. The "nice" laser profile comes from a laser pointer from Thorlabs (CPS532). The Cobra is still under construction.
Attachment 1: Libelle_Umtausch_GrüneOptik.jpg
Libelle_Umtausch_GrüneOptik.jpg
Attachment 2: Umtausch_Spiegel_2statt3.jpg
Umtausch_Spiegel_2statt3.jpg
  6   Tue Apr 26 18:15:19 2022 RodolfoDetectorsXUV-Detector and Cu-Mirror
Concerning the moveable detectors:

- I have switched off the power supply and cooling (heat exchanger) for the Cu-mirror.

- The heat exchanger for the XUV-detector is still ON. The water level in the heat exchanger is still OK.
  18   Mon May 9 13:48:20 2022 RodolfoLaserLaser for H-like 209Bi
I have changed the dye to Rhodamin 610 + Rhodamin 640. The Cobra wavelength can be tuned now from 600 to 630 nm.

The current wavelength is set to 605 nm.
  30   Tue May 10 21:41:17 2022 RodolfoAcceleratorT-Scraper
The T-Scrapers at the electron cooler have an issue. They can't be moved in the horizontal direction using the DeviceControl.
  34   Tue May 10 23:53:42 2022 RodolfoGeneralshift change
The night shift took over. They are trying now to overlap the ion and laser beams.
  44   Wed May 11 14:59:01 2022 RodolfoLaserLaser status
I have measured the output energy of the laser system. All values in [mJ] and over 500 laser-pulses average

DateOut of Quanta Ray @ 532 nmSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
10.05.202253348571
11.05.202248448067
  70   Mon May 16 15:57:37 2022 RodolfoLaserWavemeter calibration
I have calibrated our Wavemeter WS7 using the temperature stabilized He-Ne Laser (SIOS EN60 825-1:2014). In the screenshots below you can see the readout of the wavemeter before (vor) and after (nach) calibration.
Attachment 1: WS7_VorKalibrationMitHe-Ne_16-05-2022.PNG
WS7_VorKalibrationMitHe-Ne_16-05-2022.PNG
Attachment 2: WS7_NachKalibrationMitHe-Ne_16-05-2022.PNG
WS7_NachKalibrationMitHe-Ne_16-05-2022.PNG
  82   Fri May 27 14:57:23 2022 RodolfoLaserLaser Energy
I have started up the laser system (Q-Ray & Cobra) again. Here some parameters*:

- Q-Ray's output energy (@532 nm: 547 mJ.
- Seed energy for Cobra# (@532 nm): 504 mJ.
- Cobra's output energy (@ 601.7 nm): 71 mJ.

* all values averaged over 500 pulses.
# angle of lambda/2-plate: 107°
  108   Wed Jun 1 17:20:04 2022 RodolfoLaserHeNe @ WS7
 
Attachment 1: HeNe_WS7_01-06-2022_1.png
HeNe_WS7_01-06-2022_1.png
  111   Fri Jan 13 17:05:22 2023 RodolfoLaserTesting WS6
Testing the new Wavemeter (HighFinesse, WS6, SN3950) with the QRAY laser light @ 532 nm. Multimode fiber von High Finesse:FC/PC S (Corning, MM, OM2)
Attachment 1: WS6_3950_QRayWavelength_13-01-2022.png
WS6_3950_QRayWavelength_13-01-2022.png
  112   Wed Jan 18 13:02:12 2023 RodolfoLaserTesting WS6 with Cobra
Testing the WS6 (S.N. 3950) together with the Cobra.

Cobra operated with dye DCM in Ethanol + DMSO (Concentration 1:1)
- Oscillator concentration 0.3 g/l.
- Main amplifier concentration 0.0375 g/l (1/8 oscillator concentration).
- Laser linewidth: 6 GHz. Expansion factor: 10x. Grating: 2400 g/mm (40/2013)

Seed energy: 504 mJ @ 532 nm.
Cobra output energy: 112 mJ @ 640 nm.

Scan settings: 640.0 nm - 639.8 nm @ 0.005 nm / step.

Wavemeter settings: Pulsed (ext. trigg. 1 = QRay-Output: Lamp Sync). Precision: Fine.
- Wavemeter calibration. Reference source: Neon lamp.
- LTA-Data under ATPPC023 D:\WLM6 LTA data\D:\WLM6 (18.01.2023, 11.23, 640,10656 nm.lta)
Attachment 1: WS6_640-639.8_0.005_18-01-2023_11.23.png
WS6_640-639.8_0.005_18-01-2023_11.23.png
  113   Tue Jun 6 09:33:00 2023 RodolfoLaserFiber coupler
Cobra's new fiber-coupling unit for wavelength reading.
Attachment 1: Cobra_FiberCoupler.jpg
Cobra_FiberCoupler.jpg
  92   Mon May 30 19:42:20 2022 Rodolfo & KristianLaserChanging laser wavelength
We have changed the laser wavelength, e.g. the dye for the Cobra to Fluorescein 27.

We get about 84 mJ out the main amplifier @ 548 nm.

We also changed the optics and put into operation the MRC stabilization system for this new wavelength regime.

Next step is to T-scrape the ion- and laser-beams, e.g. to make the overlap of both beams at the E-Cooler.
  7   Fri Apr 29 21:18:12 2022 Rodolfo & MaxLaserFluorescein 27, Rh 610 + Rh 640
We (Max and Rodolfo) have tested the dyes. I have prepared the dye-solutions according to the recipes given in Sirah's User Manual.

The seed energy for the Cobra was 520 mJ @ 532 nm. The output energy after the Cobra's main amplifier was:

Fluorescein 27 (to be used for 208Bi):

Wavelength [nm] Energy [mJ]
54558
54864
55062
55558
56051


Rhodamin 610 + Rhodamin 640 (potential candidate to be used for 209Bi):

Wavelength [nm] Energy [mJ]
60065
60598
610104
615103
62097
62582


* All values averaged over 500 laser pulses.
  75   Mon May 16 21:08:48 2022 Rodolfo & MaxLaserLaser power
We checked the energy of the laser and optimized it a bit

TimeSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
20:4141563
20:4850673


The lambda/2 is now at 108°.
  28   Tue May 10 15:26:35 2022 Rodolfo, MaxLaserLaser stabilisation running
It is now possible to stabilize and move the laser with both stages.

The software and hardware settings are attached.
For synchronizing with the laser pulse we use following frequency generator settings:
period: 200us
high: 5V
low: 0V
duty: 50% 

The frequency generator is triggered with the external Q-switch trigger signal, that is in coincidence with the ESR HF.
To use the stabilization one has to use the external and NOT the q-switch mode of the laser. 
Attachment 1: MRC_Settings_for_Bismuth_10-05-2022.PNG
MRC_Settings_for_Bismuth_10-05-2022.PNG
Attachment 2: MRC_hardware_Setting.PNG
MRC_hardware_Setting.PNG
  9   Wed May 4 22:55:37 2022 Rodolfo, SebastianLaserFCU / Temp Control Bug
We found a "Bug" in the control of the Sirah dye system.

Due that we don't use the FCU and the temperature control unit we could not start the Sirah software without getting numerous errors. 
The fix was to plug in the BBO oven again, move the FCU to "origin", than move to a specific location that the FCU goes in an "idle" mode. 
Than the Sirah software can be started again without getting erros. 
  10   Wed May 4 22:56:22 2022 Rodolfo, Sebastian, KonstantinLaserLaser step complete, scan complete fixed
"Laser step complete" and "laser scan complete" are working again.

Problems:
1) Connections were wrong in the Software. 
2) Sometimes the connection to "laser scan complete" was lost (Wackelkontakt).
3) The VI was initialized with the wrong LabJack Channels.

Now:
1) fixed connections in the software.
2) switch to an other "channel" of the LabJack device for "laser scan complete".
3) The channels in the Cobra VI are for...
laser scan complete -> Channel 5
laser step complete -> 6

We definetely should keep an eye and check frequently the signals, that we do not have a lost connection (Wackelkontakt) again of these 2 channels.
  52   Wed May 11 23:36:24 2022 Ruijiu Chen, Carsten, GuyDAQstart NTCAP.
Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
RF-Attenuation(dB):40
IF-Attenuation(dB):19.9288
Samples/Record:2^18=262144
Records/File:2^12=4096
Masterpath:p:\208Bi\iq\IQ_2022-05-10_17-06-29
           p:\208Bi\sc\IQ_2022-05-10_17-06-29
Free space of hard disk: 34.9TB.
  11   Thu May 5 15:24:34 2022 SebastianLaserlaser busy problem
Current status: 
Laser busy signal works correctly (5V if the grating moves, 0V if not) if the laser is operated by the Sirah software.

When the laser is controled by the "Thorium Main VI" the laser busy signal is always 0V.
  12   Fri May 6 10:30:23 2022 SebastianDAQlaser busy / dye out signal fixed
Solution for a working laser busy / dye out signal was to disable the FCU and set the FCU status to "False" (see attached picture).

Remark: FCU unit will not be used for Bismuth experiment!
Attachment 1: CobraFix_LaserBusy.PNG
CobraFix_LaserBusy.PNG
  13   Fri May 6 10:35:06 2022 SebastianDAQlaser step complete cabling changed
I changed the laser step complete cabling from a quad coinc (see attached picture) to a Logic Fan In / Fan out (same as laser scan complete).
The "detour" through the quad coinc yielded to a very short laser step complete signal of ~500ns...

Due to the change it is now ~15µs long and has the same length as the laser scan complete signal (~15µs).
Attachment 1: stepComplete_beforeChange_QuadCoincCabling.PNG
stepComplete_beforeChange_QuadCoincCabling.PNG
  26   Tue May 10 11:40:55 2022 SebastianAcceleratorstill no beam @ESR
There is still no Beam in the ESR.

The beam is currently at TE3 - between SIS and ESR
  33   Tue May 10 23:10:25 2022 Sebastian, Patrick, Volker, GuyAcceleratorT-Scraper Reloaded
We have established a Control to "manually" move the T-Scrapers via a "remote desktop". We can now move both scrapers in the horizontal direction too.

We are now T-scraping the ion beam for determining its position in the vertical and horizontal directions.
  62   Thu May 12 15:21:23 2022 Sebastian, SimonLaserFlash lamps changed
We (Sebastian and I) changed the flash lamps of the Quanta Ray Laser and measured the output energy of the laser system afterwards (still during warm up).
All values in [mJ] and over 500 laser-pulses average

DateOut of Quanta Ray @ 532 nmSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
10.05.202253348571
11.05.202248448067
12.05.202257850175


The lambda/2 is at 103°. Correction factor for the 532nm-monitor is 11.4 (exchanged broken monitor).
  67   Fri May 13 11:46:51 2022 Sebastian, Simon Laser energy
We (Sebastian and I) measured the output energy of the laser system again.
All values in [mJ] and over 500 laser-pulses average

DateOut of Quanta Ray @ 532 nmSeed energy for Cobra @ 532 nmOut of Cobra @ 601 nm
10.05.202253348571
11.05.202248448067
12.05.202257850175
13.05.202263249878


The lambda/2 is at 100°. Correction factor for the 532nm-monitor is 8.4.
  27   Tue May 10 11:59:45 2022 Simon, Christopher, Kristian, SebastianLaserLabview VI checkups
The lower limit (to position) of the Cobra control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 the "to position" has to be 601.735.

We also checked the displayed HV values in Go4 with the shown values of the HV VI.

Both values in go4 and in the VI show the same value and are changing "simultaneously" (depending on the refresh time of go4 and Labview).
  39   Wed May 11 06:41:32 2022 Simon, Christopher, ShahabRunsshifts
new shift started.
  40   Wed May 11 06:47:58 2022 Simon, Christopher, ShahabRunsrestart laser scan

Time SIS-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) comments
06:37 7.8e7 ? 223217 392-395 8080 601.95 - 601.735 0.005 5s 8 loops
07:10 4.8e7 ? 223217 396-399 8081 601.95 - 601.735 0.005 5s 8 loops
07:48 1.3E8 ? 223219 400-403 8082 601.95 - 601.735 0.005 5s 8 loops
08:25 3.9E7 ? 223219 404- 406 8083 601.95 - 601.735 0.005 5s 8 loops
08:59 5.8E7 ? 223219 407 8084 601.95 - 601.735 0.005 5s 8 loops
09:38 7.2E7 3.1E6 223219 408-411 8085 601.95 - 601.735 0.005 5s 8 loops
10:24 6.4E7 3.1E6 223219 412-415 8086 601.95 - 601.735 0.005 5s 8 loops
11:05 7E7 2.2E6 223219 416-418 8087 601.95 - 601.735 0.005 5s 8 loops
11:36 6E7 2.2E6 223219 419-420 8088 601.95 - 601.735 0.005 5s number of loops now 4
11:56 2E8 6.9E6 223219 421-423 8089 601.62 - 601.405 0.005 5s 4 loops, changed scan range
12:28 1.1E8 5E6 223219 424-426 8090 601.62 - 601.405 0.005 5s 4 loops
12:43 6.5E7 2.6E6 223219 427-429 8091 601.62 - 601.405 0.005 5s 4 loops
13:11 1.3E8 5.8E6 223219 430-432 8092 601.62 - 601.405 0.005 5s 4 loops
  41   Wed May 11 07:28:39 2022 Simon, Christopher, ShahabGeneralDAQ Loop for shifters
Procedure:

- Scanning phase ends (on LabView wait until "Idle Status" blinks. it will show e.g. 8 loops and 44 scans)

- on DAQ2 (Carsten) and DAQ1 type (simultaneously):

sto ac

- on DAQ2 (Carsten) and DAQ1 type:


clo fi
exit


- on DAQ1 computer, stop GO4 and close it

- on DAQ2 (Carsten) and DAQ1 type:

resl
mbs
@startup


- on DAQ1 computer, start GO4

go4&


- request new injection (move the green slider to red, wait for machine to go further, then move it back to green)

ESR_EXP22_03_209Bi83_Laser_06May.C1.9_WAIT_FOR_MANIP_BY_OP

- in Lassie Monitor, remember the value of SIS-Trafo (GS09DT_ML) after injection, and put it later in the elog table

- wait until the ion beam is cooled (look at the Schottky monitor)

- on DAQ2 (Carsten) and DAQ1 type (simultaneously):

sta ac

- on LabView press on button

Start Scan

- Scanning phase starts.

- you can show the status (and also the current filename) by using the command

sh ac

- update elog with SIS Current, Filenames, and time


- restart from top
  58   Thu May 12 11:31:11 2022 Simon, Christopher, Shahab, Wilfried, Sebastian, RaganGeneralRuns morning shift

Time SIS-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
11:30 - 8,2e6 223219 497 - 500 8119 - 8119 601.62 - 601.405 0.005 5s 6 after this run we had to give the ESR Group the beam
  55   Thu May 12 10:10:35 2022 Simon, Christopher, Wilfried, SebastianDAQ1ms gated PMT north / middle added to DAQ
We added on DAQ1 and DAQ2 1ms gated PMT North and PMT Middle signals.
Now we "supress" the signal by a factor of ~30.

DAQ1:
Channel 11 --> 1ms gated PMT North
Channel 12 --> 1ms gated PMT Middle

DAQ2:
Channel 12 --> 1ms gated PMT North
Channel 13 --> 1ms gated PMT Middle

Update: the same gate has been added to the XUV anode and anode delayed signals, but on their original TDC channels not on new ones, in order to not only reduce the background in the XUV signals but also reduce the load on the DAQ.
  14   Fri May 6 16:29:03 2022 Simon, PatrickDetectorsPMT preparation
We changed PMT north and PMT south and tested them at 1500 V.

Both new PMTs are broadband.

PMT north and middle see between 2 and 7 kHz signal rate with a threshold close to the background noise.
PMT south still has the plastic cap on and is intended to be used as a reference for electro-magnetic disruptions. No signal was seen at 1500 V.
We fixed the signal cable of PMT south to the NIM-crate to get rid of background noise picked up by the cable.
  23   Mon May 9 19:05:17 2022 WilfriedDAQQ-Switch signals + 0.5 ms and +1 ms in VUPROM
We have generated two additional signals which are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
Q-Switch + 1.0 ms --> channel 10
(channel numbering 0-15)
The delays are generated by the two channels of a DGG222
  94   Mon May 30 21:52:08 2022 Wilfried, Danyal, David, RodolfoGeneralPosition of T-Scrapers
We have determined the position of the H-like 208Bi ion beam using the T-Scrapers. The position actually did not change in comparison to the position of H-like 209Bi.

Here we have the values where the beam was "gone"



devicemove in dir.gone (mm) x0 (mm)
GECEDS1VUup 0.7
GECEDS1HAright -22 -4.7
left -13.0
GECEDS2VUup 0.0
GECEDS2HAright -18.5 3.1
left -9.5



Below you can see a screenshot with the settings of the beam stabilization system.
Attachment 1: MRC_208Bi_30-05-2022-10Uhr.png
MRC_208Bi_30-05-2022-10Uhr.png
  17   Mon May 9 11:45:57 2022 Wilfried, Jon, SebastianGeneralHV Divider position & DMM calibration
We performed an autocalibration (attached picture 1) of the Keysight 34465A DMM (TUD Keysight).

The position and the "cabling" to the cooler platform was also adjusted (picture 2,3).
Attachment 1: DMM_calibration.PNG
DMM_calibration.PNG
Attachment 2: dividerPosition.PNG
dividerPosition.PNG
Attachment 3: dividerPosition1.PNG
dividerPosition1.PNG
  45   Wed May 11 18:00:40 2022 Wilfried, Phillip, MaxDetectorsdouble PD NO peak problem solved
In entry 36 one finds an additional PD NO peak around bin 100.
This was caused by signal reflection in the cable.
The problem was solved by adjusting the CFD threshold from 10 to 30.
 
  46   Wed May 11 18:13:04 2022 Wilfried, Phillip, MaxDAQlaser scan/step complete
The scaler channel laser scan complete and laser step complete is interchanged in go4. Carsten will fix this on the software side.
Additionally the laser scan complete signal was not there in the first place. After checking the signal on multiple points, the signal was suddenly back in the DAQ.
Possibly there is a bad cable/contact somewhere (on the Labjack?). The signal should be checked in go4 from time to time. 
  79   Tue May 17 06:37:28 2022 YL, KMAcceleratorReduced beam intensity
The resonance in 209Bi has been seen during the night.
Reducing the intensity by a factor~1000, to simulate 208Bi conditions
Running low intensity since ~6:15-6:20
The present intensity is so low that DCCT does not see the beam.
On Schottky the beam is clearly seen as ~30-40 dB over the background.
The real intensity is to be determined from the NTCap, which is running (checked).
  16   Mon May 9 09:43:08 2022 ZoranAcceleratorESR Beam
The main control room started setting up the Bi beam this morning, but quickly stopped in order to solve some problems around the UNILAC. Therefore we 
should not plan to receive ions earlier than late in the evening on Monday, or probably Tuesday during the day.
  24   Mon May 9 19:56:41 2022 ZoranAcceleratorstatus Monday evening
The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport and the devices for the 
ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment before tomorrow morning.

=> the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
=> the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.

The ESR cave is closed again. Talk to the main control room if you need access.
  25   Tue May 10 09:05:19 2022 ZoranAcceleratorstatus Monday evening
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport 
and the devices for the 
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment 
before tomorrow morning.
> 
> => the night shift will not take place, unless some laser adjustments need to be done (so far we see no problems)
> => the morning shift does not need to come at 6AM. My guess is that before the morning briefing at 8:30 there will be no news.
> 
> The ESR cave is closed again. Talk to the main control room if you need access.

Status SIS on Monday evening. ESR setting up starting on Tuesday morning. There is some prospect of getting more ions by setting up multi-multiturn 
injection, however still uncertain.
Attachment 1: 22-05-09_200006_20220509_170137_tcl1024_dcct.png
22-05-09_200006_20220509_170137_tcl1024_dcct.png
  42   Wed May 11 08:01:44 2022 ZoranRunsStart laser scanning

Quote:

Questions:
There are many other masses/isotopes/etc. visible in the Shottky spectrum. Is this wanted?
Are the vacuum gauges turned off?
Laser timing correct? +- 3 bins?


No, this is not wanted and yes, the machine is aware of the problem. The decision on Tuesday evening was to leave the ESR in that state in order to start the measurement and continue setting on Wednesday. Otherwise the night shift could not take place.

The additional isotopes are only a few percent and should contribute insignificantly to the background rate.
  47   Wed May 11 20:47:54 2022 ZoranAcceleratorbeam lost in SIS
For some reason the beam was lost in the SIS soon after taking the ESR beam this evening, reason unknown. Solved by sending teh full context to the SIS machine and having 
operators to manually set the voltage of the SIS extraction kicker. Afterwards a slight readjustment of the transfer beamline was necessary:

In the SIS: GTE5 KY1, MU0, QD21, QD22 as well as in the ESR: GE01MU4I (5 -> 6 mrad)

This brought back around 1E7 particle in the ESR after 5 accumulated SIS injections.
  66   Fri May 13 08:32:41 2022 ZoranAcceleratorNO BEAM UNTIL TOMORROW MORNING
> The problem at the ESR septum is serious. They have to remove the broken part and try to repair it.
> Maybe tomorrow in the morning briefing there will be more information about this.
>
> The night shift will not take place!
> The morning shift starts at 9:00 or on further notice!
>
> The PMTs are switched off and the laser also.

Update from the morning briefing: the DCCT (power converter) of the injection septum was demounted and the EPS group is trying to fix it. There is no replacement available, so if they do not succeed this beamtime is over. They promised more information in the midday meeting at 12:45.

In the ESR Messhüte is some cake ("Trostkuchen").
  73   Mon May 16 18:01:23 2022 mbsMax, Danyal, Wilfried, Rodolfo, Patrick, Kristian, David, Ruijiu Runsruns afternoon/night shift 16.05
These are the runs after the septum was repaired on 16.05.

Time ESR-intensity ESR-intensity after orbit change cooler-HV LMD-DAQ2 file nr LMD-DAQ1 file nr scan range(nm) step width increment (nm) dwell time(s) n loops comments
ca. 18:00 ? ~3.0e7 223222 504-505 8121 601.62 - 601.405 0.005 5s 4 DAQ2 late start
18:11 ? ~3.3e7 223222 506 8122 601.62 - 601.405 0.005 5s 4 aborted, ions are rapidly lost after Bahnverlagerung
18:33 4.5e7 ~3.7e7 223222 507-509 8123 601.62 - 601.405 0.005 5s 4 removed all scrapers, beam life time is better, high intensity, slight instability in bunching, ion intensity at the end: 1.4e7, DC Trafo was in saturation so ampl. was turned down
19:32 ? 3.7e7 223222 512 8125 601.62 - 601.405 0.005 5s 4 rf bunching amplitude decreased from 350V -> 280V
20:00 ? 3.6e7 223223 514 8127 601.745 - 601.32 0.01 5s 4 43 steps of laser, therefore 1 step offset from loop to loop, laser already of ?
20:30 ? 2.9e7 223223 520-522 8129 601.760 - 601.320 0.01 5s 6 aborted after 3 loops, laserstabi was off, probably during hole measurement
21:01 ? 3.6e7 223223 524-528 8130 601.760 - 601.320 0.01 5s 6
21:30 ? 3.4e7 223223 529-532 8131 601.760 - 601.320 0.01 5s 6 coasting beam now !!!
22:10 ? 3.7e7 223223 534-537 8132 601.760 - 601.320 0.01 5s 6 Night shift took over.
22:40 4.4e7 3.6e7 223223 539-542 8133 601.760 - 601.320 0.01 5s 6
23:52 3.8e7 3.2e7 223223 545-548 8134 - 8135 601.760 - 601.320 0.01 5s 6 Switched off the nitrogen before this run, stopped acq. after 4 loops (laser gone), PMT north saw a lot of noise? (ID:78) -> larger files.
00:39 4.3e7 3.2e7 223222 552-555 8136 601.760 - 601.320 0.01 5s 6 The secondary DAC always requires 2-3 restarts until it is working.
01:10 3.8e7 3.0e7 223222 557-558 8137 601.760 - 601.320 0.01 5s 6 Laser moved away during the third loop, acq. stopped.
01:33 4.2e7 3.1e7 223222 561-564 8139 601.760 - 601.320 0.01 5s 6 The previous laser scan was still running, restarted the acq. once.
02:00 > 4.0e7 3.4e7 223222 566-569 8140 601.760 - 601.320 0.01 5s 6
02:30 > 4.0e7 3.2e7 223222 573-576 8141 601.760 - 601.320 0.01 5s 6
02:58 4.2e7 3.4e7 223222 579-582 8142 601.760 - 601.320 0.01 5s 6
03:45 4.2e7 3.3e7 223222 585-589 8143 601.760 - 601.320 0.01 5s 6 Back to bunched beam mode
04:15 4.7e7 3.4e7 223222 594-598 8144 601.760 - 601.320 0.01 5s 6
04:43 4.4e7 3.4e7 223222 600-604 8145 601.960 - 601.520 0.01 5s 6 We changed the scan range Big grin
05:10 4.3e7 3.3e7 223221 606-610 8146 601.960 - 601.520 0.01 5s 6 It looks like the "overWavel" plots actually work better now, because the laser steps somehow are counted wrongly, leading to shifts between loops.
05:37 4.2e7 3.7e7 223221 611-615 8147 601.960 - 601.520 0.01 5s 6
06:27 ? ? 223219 616-618 8148 601.960 - 601.520 0.01 5s 6 Since Go4 was still running during startup we were not able to look into the data during the scan. After reduction of particle number, the dc trafo is no longer capable to measure to number of ions.
06:56 ? ? 223219 619-620 8149 601.960 - 601.520 0.01 5s 6
07:25 ? ? 223219 621-622 8150 601.9 - 601.7 0.01 5s 6 Changed the scan range t0 601.9-601.7 and reduced step increment to 0,005nm
07:56 ? ? 223219 623-624 8151 601.9 - 601.7 0.01 5s 6
08:20 ? ? 223219 625-625 8152 601.9 - 601.7 0.01 5s 6 Restarted scan without new injection, DAQ2 was not running during this scan
08:44 ? ? 223220 626-627 8153 601.9 - 601.7 0.01 5s 6 Reduced Loop number to 4 (aborted after 4 completed scans)
09:03 ? ? 223220 628 8154 601.9 - 601.7 0.01 5s 6 Reduced Loop number to 3 (before starting a new scan)
09:17 ? ? 223221 629 8155 601.9 - 601.7 0.01 5s 6
Since
ELOG V3.1.5-fc6679b