  Dielectronic recombination-assisted laser spectroscopy, Page 1 of 6  Not logged in ELOG logo
ID Date Authorup Category Subject Text Attachments
  5   Tue Apr 26 16:28:14 2022 CarstenDAQCable of Bunch HF disconnected and 1.995Mhz signal connected for DAQ tests see subject.   
  19   Mon May 9 16:58:41 2022 CarstenDetectorsVoltage particle dectectors NA_SZ und SA_SZ switched onVoltage SA_SZ (capture behind cooler): 1500
V (thin plastic scintillator)
Voltage NA_SZ (capture behind target): 750V
  
  20   Mon May 9 17:01:02 2022 CarstenDAQdirectories / paths / comments / reduction factors /startup.scom files for the 2 DAQs [U][B]DAQ1 (original):[/B][/U]
-user atplaser
-runs on lxg1050
  
  21   Mon May 9 17:14:02 2022 CarstenDAQNTCAP DAQThe NTCap DAQ computer in the HKR (Schottky
logbook) is started, and all preparations
for data taking (mounting of NAS etc.) are
  
  22   Mon May 9 17:16:34 2022 CarstenAcceleratorImportant: New ESR pattern - requies action for XUV detector in/outThe ESR pattern is enhanced compared to the
thorium experiment by additional machines
that can be  used for cooling/waiting in
  
  71   Mon May 16 17:15:56 2022 CarstenAnalysisDAQ /Analysis - shift of peaks in the accumulated spectra, changes in codeAfter a phone call with Wilfried I implemented
an offset to all hit channels of the stacked
/ accumulated spectra where one chekcs the
  
  83   Fri May 27 20:39:50 2022 CarstenAnalysisShort Manual for updated Go4 DAQ (version 2022_05_27)Short descriptions of the most recent version
of the GO4 code is attached. I will install
the corresponding vesion early on sunday.
 Short_Introduction_to_the_208Bi_Go4_Analysis.pdfShort_Introduction_to_the_208Bi_Go4_Analysis.odt 
  91   Mon May 30 19:00:19 2022 CarstenGeneralScraper Settings and Parameters for the last measrements with thick targetold Bunch frequency: 1.98777 MHz

Positions PL devices:
 screenshot-2022-05-30_19-12-151030168345517073342_(002).png 
  93   Mon May 30 20:58:26 2022 CarstenAcceleratorNew Settings for 208Bi Beam Old SetParameters.C and old SetConditions.C
were saved as SetParameters_209.C and SetConditions_209.C
  
  110   Thu Jun 30 11:12:21 2022 CarstenAnalysisUpdated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra)Here attached is a more recentversion of the
Go4 Analysis Code with some smaller bugfixes.
For adaequate *.C files please have alook
 208Bi_20220629_fix.tgz 
  102   Tue May 31 19:59:49 2022 Carsten, DanyalAcceleratorchange in frequency mismatch 208Bi --> 209Bitime = 20:00 

The RF has been adjusted so that it bunches
  
  103   Tue May 31 21:08:04 2022 Carsten, MaxDetectorsXUV detector automation offWe deactivated the automation of the XUV detector.
It stays out now.
  
  101   Tue May 31 19:37:30 2022 Carsten, Max, WilfriedDetectorsSASZ and NASZ voltages switched offSASZ and NASZ voltages were switched off bevor
we went back to 209Bi. Laser beam stabilization
turned off.
  
  96   Mon May 30 23:18:06 2022 Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, DanyalRunsRuns shifts 31.05.These are the first runs with 208Bi.

[TABLE border="1"]
 2022-05-31_particles.png 
  8   Wed May 4 22:45:12 2022 Carsten, SebastianDAQQ-Switch Signal (ch15) fixed The "dead" Q-Switch signal was converted 
two times... This explains why in the 
Thorium experiment the Q-Switch signal 
  
  100   Tue May 31 19:32:56 2022 Carsten, Wilfried, MaxCalibrationelectron cooler calibration voltage - frequency[TABLE border="1"]
SetVoltage (DeltaU) | MeasVoltage | freq
| Current 
  
  109   Fri Jun 3 12:01:17 2022 DanyalDetectorsswitched off XUV detector on 1 June ~17:00 I have switched off the XUV detector on 1
June at about 17:00. 
The high voltages of the MCP (in ESR laser
  
  68   Fri May 13 16:55:58 2022 Danyal, Carsten, Phillip, WilfriedGeneralEnd of E128 Beamtime Dear all,

unfortunately, the E128 experiment must now
  
  31   Tue May 10 22:29:45 2022 Jan GloriusDAQDAQ2 shaper settingsAttached are the MSCF shaper settings applied
on Tue May 10 at 22:30.
 setting_e128.v1 
  32   Tue May 10 22:37:10 2022 Jan GloriusDAQDAQ2 cabling docu   e128_daq2_cabling.ods 