HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Dielectronic recombination-assisted laser spectroscopy, Page 1 of 6  Not logged in ELOG logo
Entry  Tue Jun 6 09:33:00 2023, Rodolfo, Laser, Fiber coupler Cobra_FiberCoupler.jpg
Entry  Wed Jan 18 13:02:12 2023, Rodolfo, Laser, Testing WS6 with Cobra WS6_640-639.8_0.005_18-01-2023_11.23.png
Entry  Fri Jan 13 17:05:22 2023, Rodolfo, Laser, Testing WS6 WS6_3950_QRayWavelength_13-01-2022.png
Entry  Thu Jun 30 11:12:21 2022, Carsten, Analysis, Updated Go4 Analysis with small Bugfix (PMTOverWavelength SPectra) 208Bi_20220629_fix.tgz
Entry  Fri Jun 3 12:01:17 2022, Danyal, Detectors, switched off XUV detector on 1 June ~17:00  
Entry  Wed Jun 1 17:20:04 2022, Rodolfo, Laser, HeNe @ WS7 HeNe_WS7_01-06-2022_1.png
Entry  Wed Jun 1 08:39:50 2022, Kristian, Konstantin, Calibration, Wavemeter reading 
Entry  Wed Jun 1 00:16:02 2022, Konstantin, Simon, DAQ, Timing 209Bi thick target Timing_209Bi_final.png
Entry  Wed Jun 1 00:03:08 2022, Konstantin, Simon, Kristian, Runs, 209-Bi runs 
Entry  Tue May 31 21:58:55 2022, Max, Rodolfo, Laser, MRC Settings for 209Bi  MRC_209Bi_31-05-2022_2157.png
Entry  Tue May 31 21:08:04 2022, Carsten, Max, Detectors, XUV detector automation off 
Entry  Tue May 31 19:59:49 2022, Carsten, Danyal, Accelerator, change in frequency mismatch 208Bi --> 209Bi 
Entry  Tue May 31 19:37:30 2022, Carsten, Max, Wilfried, Detectors, SASZ and NASZ voltages switched off 
Entry  Tue May 31 19:32:56 2022, Carsten, Wilfried, Max, Calibration, electron cooler calibration voltage - frequency 
Entry  Tue May 31 17:22:09 2022, Max, Carsten, Danyal, Rodolfo, Wilfried, General, change E-cooler current I_e = 50 mA 
Entry  Tue May 31 15:19:58 2022, Max, Carsten, Danyal, General, scans for different E-cool currents 
Entry  Tue May 31 03:18:52 2022, Patrick, Konstantin, Laser, Laser timing 
Entry  Mon May 30 23:18:06 2022, Carsten, Rodolfo, Konstantin, Patrick, Ragan, Ken, Kristian, Max, Danyal, Runs, Runs shifts 31.05. 2022-05-31_particles.png
Entry  Mon May 30 21:52:08 2022, Wilfried, Danyal, David, Rodolfo, General, Position of T-Scrapers MRC_208Bi_30-05-2022-10Uhr.png
Entry  Mon May 30 20:58:26 2022, Carsten, Accelerator, New Settings for 208Bi Beam  
ELOG V3.1.5-fc6679b