HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Dielectronic recombination-assisted laser spectroscopy, Page 3 of 6  Not logged in ELOG logo
Entry  Wed May 11 14:59:01 2022, Rodolfo, Laser, Laser status 
I have measured the output energy of the laser system. All values in [mJ] and over 500 laser-pulses average

[TABLE border="1"]
Entry  Wed May 11 18:00:40 2022, Wilfried, Phillip, Max, Detectors, double PD NO peak problem solved 
In entry 36 one finds an additional PD NO peak around bin 100.
This was caused by signal reflection in the cable.
The problem was solved by adjusting the CFD threshold from 10 to 30.
Entry  Wed May 11 18:13:04 2022, Wilfried, Phillip, Max, DAQ, laser scan/step complete 
The scaler channel laser scan complete and laser step complete is interchanged in go4. Carsten will fix this on the software side.
Additionally the laser scan complete signal was not there in the first place. After checking the signal on multiple points, the signal was suddenly back
in the DAQ.
Entry  Wed May 11 20:47:54 2022, Zoran, Accelerator, beam lost in SIS 
For some reason the beam was lost in the SIS soon after taking the ESR beam this evening, reason unknown. Solved by sending teh full context to the SIS
machine and having 
operators to manually set the voltage of the SIS extraction kicker. Afterwards a slight readjustment of the transfer beamline was necessary:
Entry  Wed May 11 22:04:30 2022, Phillip, Wilfried, Max, General, spacial laser - ion overlap verified  
After the SIS/ESR optimization we checked the spatial overlap with the T-scrapers again.

The values are:
Entry  Wed May 11 22:19:17 2022, Max, Wilfried, Volker, Laser, laser bunch timing timing10_5_22.png
We overlapped the laser and ion bunch in the time domain. The delay has to be set on the module above the laser and NOT in the ESR Messhütte!

The values are:
Entry  Wed May 11 22:45:22 2022, Max, Wilfried, Patrick, General, scanning wavelength 
The scan parameters for the next shift are:

in COBRACONTROL:
Entry  Wed May 11 23:34:39 2022, Patrick, Carsten, Detectors, Particle Detectors / Scraper positions 
Voltages of particle detectors off.

Scraper positions:
Entry  Wed May 11 23:36:24 2022, Ruijiu Chen, Carsten, Guy, DAQ, start NTCAP. 
Carrier frequency:244MHz
IQ rate: 10M Samples/seconds
Reference level: -25
Entry  Thu May 12 00:16:13 2022, Patrick, Volker, Guy, Rui-Jiu, Runs, Runs night shift 

[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) |
Entry  Thu May 12 03:25:37 2022, Patrick, DAQ, Laser scan complete signal off 
As in ID:46, the 'laser scan complete' again is not coming in.
It is not very useful to repeatedly fix cable contact problems.
Therefore, Carsten is adding a 'number of steps' line to the config file to "repeat" the x-axis.
Entry  Thu May 12 10:10:35 2022, Simon, Christopher, Wilfried, Sebastian, DAQ, 1ms gated PMT north / middle added to DAQ 
We added on DAQ1 and DAQ2 1ms gated PMT North and PMT Middle signals.
Now we "supress" the signal by a factor of ~30.
Entry  Thu May 12 10:21:30 2022, Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried, General, No Beam Screenshot_from_2022-05-12_09-21-38.png
There is no beam in the ESR due to some problem in the UNILAC.
Entry  Thu May 12 11:30:18 2022, Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried, General, Beam is back Screenshot_from_2022-05-12_10-32-24.png
Beam is back in the ESR.
Entry  Thu May 12 11:31:11 2022, Simon, Christopher, Shahab, Wilfried, Sebastian, Ragan, General, Runs morning shift 

[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) |
Entry  Thu May 12 12:02:56 2022, Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried, General, No beam Screenshot_from_2022-05-12_11-02-37.png
There is no beam in the ESR again.
Entry  Thu May 12 12:51:30 2022, Ragan, Shahab, Simon, Sebastian, Christopher, Wilfried, General, Beam is back Screenshot_from_2022-05-12_11-51-35.pngScreenshot_from_2022-05-12_12-08-52.png
12:50 Beam is back again in the ring.
12:52-until now Kicker problem in the ESR.
Entry  Thu May 12 14:04:09 2022, Konstantin, DAQ, Go4 Laserstep histograms adapted Go4Modifications.PNG
In order to correctly display the gated PMT signals [I]PMT Middle[/I] and [I]PMT North[/I] some modifications in the Go4 code were necessary. Affected files
are [I]TLdaAnlProc.cxx[/I], [I]TLdaAnlProc.h[/I] and [I]TLdaInputDescription.h[/I].
Modifications are indicated according to the scheme "[B]//-- HH:MM mm-dd-yyyy: <description>[/B]" (an example is given in the attached screenshot). They
Entry  Thu May 12 15:21:23 2022, Sebastian, Simon, Laser, Flash lamps changed 
We (Sebastian and I) changed the flash lamps of the Quanta Ray Laser and measured the output energy of the laser system afterwards (still during warm up).

All values in [mJ] and over 500 laser-pulses average
Entry  Thu May 12 15:34:47 2022, Max, Kristian, Sebastian, DAQ, laser scan, laser step and laser busy checked 
We checked all three signals in the Messhütte. Laser scan and laser step are OK.
The Laser busy signal is for large increments (0.1nm) also fine. For short increments like our usual 0.005nm increment the signal is irregularly.
Likely the laser busy status is too short.
ELOG V3.1.5-fc6679b