Entry  Mon May 9 17:14:02 2022, Carsten, DAQ, NTCAP DAQ 
The NTCap DAQ computer in the HKR (Schottky logbook) is started, and all preparations for data taking (mounting of NAS etc.) are done.
Parameters for NTCAP DAQ will be adjusted as soon as beam is available. 
Entry  Mon May 9 17:16:34 2022, Carsten, Accelerator, Important: New ESR pattern - requies action for XUV detector in/out 
The ESR pattern is enhanced compared to the thorium experiment by additional machines that can be  used for cooling/waiting in order to optimize 208Bi yield.
As a consequence, the sub chain numbers (previous: virtuelle Beschleuniger) are changed. The new numbers still have to be dialed in into the devices in
the Messhütte and the automatic in/out of the XUV-detector tested-
Entry  Mon May 9 19:05:17 2022, Wilfried, DAQ, Q-Switch signals + 0.5 ms and +1 ms in VUPROM 
We have generated two additional signals which are fed into two VUPROM channels:
Q-Switch + 0.5 ms --> channel 9
Q-Switch + 1.0 ms --> channel 10
Entry  Mon May 9 19:56:41 2022, Zoran, Accelerator, status Monday evening 
The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport and
the devices for the 
ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment before
    Reply  Tue May 10 09:05:19 2022, Zoran, Accelerator, status Monday evening 22-05-09_200006_20220509_170137_tcl1024_dcct.png
> The main control room is setting up the SIS for extraction. At the moment there are 2.5E8 particles in the SIS. Later they will check the transport 
and the devices for the 
> ESR injection. The ESR operators might (! no info available) take over later in the evening, but there will definitely be no beam for the experiment
Entry  Tue May 10 11:40:55 2022, Sebastian, Accelerator, still no beam @ESR 
There is still no Beam in the ESR.

The beam is currently at TE3 - between SIS and ESR
Entry  Tue May 10 11:59:45 2022, Simon, Christopher, Kristian, Sebastian, Laser, Labview VI checkups 
The lower limit (to position) of the Cobra control VI has to be one increment smaller.
This means for moving from 601,95 to 601,74 the "to position" has to be 601.735.
Entry  Tue May 10 15:26:35 2022, Rodolfo, Max, Laser, Laser stabilisation running MRC_Settings_for_Bismuth_10-05-2022.PNGMRC_hardware_Setting.PNG
It is now possible to stabilize and move the laser with both stages.

The software and hardware settings are attached.
Entry  Tue May 10 20:35:42 2022, Phillip, Wilfried, Max, Detectors, PMT Threshold 
Since we have ions in the ring now, we looked at the PMT thresholds and the widths. In order to do so we looked at the Raw Signal directly before the CFD
and its output simultaneously. You can now set the threshold just above the noise. If the threshold is too low you will also see flat lines in the oscilloscope
when triggered on the CFD output. New values:
Entry  Tue May 10 21:41:17 2022, Rodolfo, Accelerator, T-Scraper 
The T-Scrapers at the electron cooler have an issue. They can't be moved in the horizontal direction using the DeviceControl.
Entry  Tue May 10 22:29:45 2022, Jan Glorius, DAQ, DAQ2 shaper settings setting_e128.v1
Attached are the MSCF shaper settings applied on Tue May 10 at 22:30.
Entry  Tue May 10 22:37:10 2022, Jan Glorius, DAQ, DAQ2 cabling docu e128_daq2_cabling.ods
 
Entry  Tue May 10 23:10:25 2022, Sebastian, Patrick, Volker, Guy, Accelerator, T-Scraper Reloaded 
We have established a Control to "manually" move the T-Scrapers via a "remote desktop". We can now move both scrapers in the horizontal direction too.

We are now T-scraping the ion beam for determining its position in the vertical and horizontal directions.
Entry  Tue May 10 23:53:42 2022, Rodolfo, General, shift change 
The night shift took over. They are trying now to overlap the ion and laser beams. 
Entry  Wed May 11 01:09:07 2022, Patrick, Sebastian, Volker, Guy, Laser, Beam overlap 2022-05-11_final_laser_spot.PNG2022-05-11_final_MRC_settings_2.PNG
We overlapped the laser with the ion beam.

The ion beam positions are:
Entry  Wed May 11 03:10:55 2022, Patrick, Sebastian, Volker, Guy , Laser, Laser - bunch timing 2022-05-06_Bi2023_laserscan_test.png
We added the delay and gate generator in between the bunch trigger and the CFD to move the timing of the PMT middle signal relative to the photodiodes north
and south.
The center value of PD-North is at 19 bins, PD-South at 55 bins, the middle is therefore at 37 bins. The PMT peak should be half a revolution, ie 75 bins
Entry  Wed May 11 06:41:32 2022, Simon, Christopher, Shahab, Runs, shifts 
new shift started.
Entry  Wed May 11 06:47:58 2022, Simon, Christopher, Shahab, Runs, restart laser scan 

[TABLE border="1"]
Time | SIS-intensity | ESR-intensity after orbit change| cooler-HV | LMD-DAQ2 file nr | LMD-DAQ1 file nr | scan range(nm) | step width increment (nm) |
Entry  Wed May 11 07:28:39 2022, Simon, Christopher, Shahab, General, DAQ Loop for shifters 
Procedure:

- Scanning phase ends (on LabView wait until "Idle Status" blinks. it will show e.g. 8 loops and 44 scans)
Entry  Wed May 11 03:17:14 2022, Patrick, Volker, Guy , Runs, Start laser scanning 
Runs of the night shift. The wavelength range is 601.95 - 601.735 nm.
We started the wavemeter python script on atppc023 located in Desktop/wavemeter_Bi.
We changed the wavelength range in go4 to the actual scan range.
    Reply  Wed May 11 08:01:44 2022, Zoran, Runs, Start laser scanning 
[quote]
[I]Questions:[/I]
[B]There are many other masses/isotopes/etc. visible in the Shottky spectrum. Is this wanted?[/B]
Entry  Wed May 11 14:48:31 2022, Konstantin, DAQ, Voltage range of the Keysight DMM changed from 10V to 1V VoltageRangeChanged.png
During the setup of the ion beam the voltage range of the Keysight DMM was changed from 10V to 1V. Additionally, the name of the high-voltage divider was
adjusted (this changes only the filename of the file, which is stored at the local pc decpc003).