HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  nuclear two-photon decay 2024, Page 1 of 6  Not logged in ELOG logo
ID Date Authordown Category Subject
  104   Sun May 19 17:48:15 2024 xing xu, hongfu, shahabRunsBeam back
beam is back, first file 17:47
  103   Sun May 19 15:13:48 2024 xing xu, hongfuRunsNo beam
beam is down 14:45. Problem with UNILAC. may take an hour.
  91   Sat May 18 12:31:45 2024 Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, ShahabDetectorsCooler Curve measurements
Cooler curve measurement, Primary Beam 100 Mo

center Freqs:
243.26875 MHz
408.03925 MHz

Running 13 harmonics
25 MHz
50 MSPS
1 sec

First injection:

-650, RSA01-2024.05.18.12.32.51.008.tiq, RSA02-2024.05.18.12.32.50.799.tiq
-700, RSA01-2024.05.18.12.34.53.819.tiq, RSA02-2024.05.18.12.34.53.611.tiq
-800, RSA01-2024.05.18.12.36.50.332.tiq, RSA02-2024.05.18.12.36.50.123.tiq
-1000, RSA01-2024.05.18.12.37.56.219.tiq, RSA02-2024.05.18.12.37.56.011.tiq
-1100, RSA01-2024.05.18.12.39.29.003.tiq, RSA02-2024.05.18.12.39.28.795.tiq
-1200, RSA01-2024.05.18.12.41.22.539.tiq, RSA02-2024.05.18.12.41.22.331.tiq
-1300, RSA01-2024.05.18.12.42.28.763.tiq, RSA02-2024.05.18.12.42.28.554.tiq
-1400, RSA01-2024.05.18.12.43.33.203.tiq, RSA02-2024.05.18.12.43.32.995.tiq
-1500, RSA01-2024.05.18.12.45.11.816.tiq, RSA02-2024.05.18.12.45.11.608.tiq


New injection:

uncoooled beam: RSA01-2024.05.18.12.49.09.850.tiq, RSA02-2024.05.18.12.49.09.642.tiq


-650, RSA01-2024.05.18.12.50.20.059.tiq, RSA02-2024.05.18.12.50.19.851.tiq
-650 (longer wait), RSA01-2024.05.18.12.52.37.936.tiq, RSA02-2024.05.18.12.52.37.728.tiq
-600, RSA01-2024.05.18.12.53.55.915.tiq, RSA02-2024.05.18.12.53.55.706.tiq
-500, RSA01-2024.05.18.12.55.31.146.tiq, RSA02-2024.05.18.12.55.30.938.tiq
-400, RSA01-2024.05.18.12.56.48.690.tiq, RSA02-2024.05.18.12.56.48.482.tiq
-300, RSA01-2024.05.18.12.58.16.906.tiq, RSA02-2024.05.18.12.58.16.698.tiq
-200, RSA01-2024.05.18.12.59.44.098.tiq, RSA02-2024.05.18.12.59.43.890.tiq
-100, RSA01-2024.05.18.13.00.38.088.tiq, RSA02-2024.05.18.13.00.37.880.tiq
0, RSA01-2024.05.18.13.01.28.466.tiq, RSA02-2024.05.18.13.01.28.258.tiq
  101   Sun May 19 14:11:29 2024 Yuri, SergeyAcceleratorSextupoles
at 13:00
scrapers in the ESR are moved to block the most outside orbits
E02DS3HG out -> -60 mm
EEXDS2HA out -> -75 mm

at 13:50
E02KS3 changed from +0.01 to -0.1
E01KS4 is unchanged at -0.26

peaks look somewhat narrower (see telegram)
  55   Thu May 16 16:43:29 2024 YuriAcceleratorHHT
HHT sees radiation from us. We stop for 10 min for them to see the speed with which the radiation level decreases.
  94   Sat May 18 14:43:59 2024 YuriAcceleratorReduce intensity, 98Mo42+
reduce intensity
eexds2ha 7mm --> 9 mm
e02ds3hg -69 mm -- stays

measure for about 30 min

9 mm was too much, change to +8 mm
  106   Mon May 20 09:01:14 2024 YuriAcceleratorModify SP magnets
In attempt to remove double-peak structure, we will modify the SP magnets
START: 9:02
SP unchanged. Other values lead to a worse peak shapes.

Scrapers: 
EEXDS2HA: -75 mm -> -5 mm (hopefully the left half is scraped)
E02DS3HG: -60 mm - unchanged

STOP: 9:40
  113   Tue May 21 08:50:06 2024 YuriAcceleratorEoB
End of beamtime!
Request is out.
Scrapers are removed, slits in the TE line removed, ESR is ramped down.
  114   Tue May 21 11:09:15 2024 YuriGeneralLogbook for beam tuning.
The version with better resolution is on our wiki page.
https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf
  82   Fri May 17 23:14:51 2024 Yoshi, OhnishiGeneralshift started
Just test
  85   Sat May 18 00:15:44 2024 Yoshi, OhnishiGeneralBeam back
Beam is back, but it stopped again at 0:17......
  89   Sat May 18 02:04:38 2024 Yoshi, OhnishiDAQRSA01 run
RSA01 was stopped from 19:25, it restart now.
  99   Sun May 19 11:02:49 2024 Xu Zhou, Yuhu Zhang, KanikaAcceleratorthe beam is paused
The beam is paused and HHT team needs to enter the ring.
  38   Wed May 15 23:04:32 2024 XinliangAnalysisElectron cooler data
The cooler curve measured during May 14 afternoon.
  88   Sat May 18 01:57:44 2024 WeickAccelerator96Sr isoc setting
We fist verified the ESR after a crash with the 98Zr setting, was fine good resolution, 
then we scaled to 96Sr directly at gamma_t not with shift as before.
E_SIS        = 449.21 MeV/u for 100Mo 38+
after target = 373.36 MeV/u for  96Sr 38+ 
in ESR       = 373.60 MeV/u for  96Sr 38+
in the LISE calculation this leads to gamma = 1.40082 as before in the other settings.
yield is very low now, but some lines.
  96   Sat May 18 16:21:30 2024 Taka, Filip, ShahabDAQDAQ start
16:21 DAQ restart for 96Sr

Acq. time 300 ms, 50 MS/s, span 25 MHz
  95   Sat May 18 15:26:46 2024 Taka, FilipDAQDAQ stop
15:20 RSA DAQ stop -> Sr setting
  102   Sun May 19 14:17:57 2024 Shahab, Kanika,hongfu li,xing xuDAQcenter frequency change for 96Sr
aiming for 96-Sr:


410 MHz:

The plunger position for 410 is 45, which should correspond to the 408.998 MHz which is expected position for 96Sr. The first file is at 14:38.


245 MHz:

The center frequency is changed to 244.235723 MHz for 96Sr, the new plunger position is 300.The first file is at 14:5
  8   Tue May 14 19:07:27 2024 ShahabRunsBroadband measurement / High Sampling rate
Stable beam after a long time:


from below ones, only the last 4 ones are probably best.

RSA01-2024.05.14.17.36.49.211.tiq
RSA01-2024.05.14.17.38.25.867.tiq
RSA01-2024.05.14.17.38.39.827.tiq
RSA01-2024.05.14.17.38.54.555.tiq
RSA01-2024.05.14.17.39.08.523.tiq

and

RSA02-2024.05.14.17.32.58.640.tiq
RSA02-2024.05.14.17.36.48.947.tiq
RSA02-2024.05.14.17.37.02.258.tiq
RSA02-2024.05.14.17.38.25.603.tiq
RSA02-2024.05.14.17.38.39.587.tiq
RSA02-2024.05.14.17.38.54.315.tiq
RSA02-2024.05.14.17.39.08.283.tiq
  9   Tue May 14 21:41:11 2024 ShahabRunsTest Screenshot
ELOG V3.1.5-fc6679b