HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028
  nuclear two-photon decay 2024, all entries  Not logged in ELOG logo
ID Datedown Author Category Subject
  114   Tue May 21 11:09:15 2024 YuriGeneralLogbook for beam tuning.
The version with better resolution is on our wiki page.
https://wiki.gsi.de/pub/ESR_EXP/E0018Experiment/20240521_logbook3.pdf
  113   Tue May 21 08:50:06 2024 YuriAcceleratorEoB
End of beamtime!
Request is out.
Scrapers are removed, slits in the TE line removed, ESR is ramped down.
  112   Tue May 21 03:27:21 2024 K.Takiura Y.KikuchiRunsBeam back
03:26 Beam is back.
  111   Tue May 21 03:07:58 2024 K.Takiura Y.KikuchiRunsNo beam
03:07 Beam is down.
  110   Mon May 20 14:02:03 2024 Jelena, Oliver, ShahabDAQRetune 245 MHz
Mew numbers for 245 MHz plunger is 190 (both)
  109   Mon May 20 13:31:09 2024 Jelena, Oliver, ShahabGeneralNew setting focussing on 96-Sr
plunger 150 for 250
plunger 48 for 410 

From file starting from 13:21 is a new setting for 96Sr.
  108   Mon May 20 13:26:55 2024 Jelena, Oliver, ShahabGeneralPlunger values
plunger 150 for 250
plunger 48 for 410 
  107   Mon May 20 09:01:51 2024 Oliver, JelenaGeneralShift news
Data collection runs smooth so far.

Yuri Litvinov will start modifying SP magnets now. The resolution will change.
  106   Mon May 20 09:01:14 2024 YuriAcceleratorModify SP magnets
In attempt to remove double-peak structure, we will modify the SP magnets
START: 9:02
SP unchanged. Other values lead to a worse peak shapes.

Scrapers: 
EEXDS2HA: -75 mm -> -5 mm (hopefully the left half is scraped)
E02DS3HG: -60 mm - unchanged

STOP: 9:40
  105   Mon May 20 05:32:17 2024 Gregor, CaglaAcceleratorShort beam interruption
We lost the beam for ~2min at (from ~5:28 till ~5:30). Everything seems to be back at the same state.
  104   Sun May 19 17:48:15 2024 xing xu, hongfu, shahabRunsBeam back
beam is back, first file 17:47
  103   Sun May 19 15:13:48 2024 xing xu, hongfuRunsNo beam
beam is down 14:45. Problem with UNILAC. may take an hour.
  102   Sun May 19 14:17:57 2024 Shahab, Kanika,hongfu li,xing xuDAQcenter frequency change for 96Sr
aiming for 96-Sr:


410 MHz:

The plunger position for 410 is 45, which should correspond to the 408.998 MHz which is expected position for 96Sr. The first file is at 14:38.


245 MHz:

The center frequency is changed to 244.235723 MHz for 96Sr, the new plunger position is 300.The first file is at 14:5
  101   Sun May 19 14:11:29 2024 Yuri, SergeyAcceleratorSextupoles
at 13:00
scrapers in the ESR are moved to block the most outside orbits
E02DS3HG out -> -60 mm
EEXDS2HA out -> -75 mm

at 13:50
E02KS3 changed from +0.01 to -0.1
E01KS4 is unchanged at -0.26

peaks look somewhat narrower (see telegram)
  100   Sun May 19 12:04:55 2024 KanikaAcceleratorBeam back
The beam is back.
  99   Sun May 19 11:02:49 2024 Xu Zhou, Yuhu Zhang, KanikaAcceleratorthe beam is paused
The beam is paused and HHT team needs to enter the ring.
  98   Sat May 18 16:45:15 2024 Helmut, YuryAcceleratorsetting for 96Sr (98Y)
To have a few more lines the setting actually is not on 96Sr directly, but on 98Y39+.
98Y is also the one set to be isochronous. 
But in addition the SIS-energy is shifted by -0.9 MeV/u to get at least better transmission for 96Sr.
  97   Sat May 18 16:29:15 2024 Filip, Taka, ShahabRunsGood operation screen shot
  96   Sat May 18 16:21:30 2024 Taka, Filip, ShahabDAQDAQ start
16:21 DAQ restart for 96Sr

Acq. time 300 ms, 50 MS/s, span 25 MHz
  95   Sat May 18 15:26:46 2024 Taka, FilipDAQDAQ stop
15:20 RSA DAQ stop -> Sr setting
  94   Sat May 18 14:43:59 2024 YuriAcceleratorReduce intensity, 98Mo42+
reduce intensity
eexds2ha 7mm --> 9 mm
e02ds3hg -69 mm -- stays

measure for about 30 min

9 mm was too much, change to +8 mm
  93   Sat May 18 13:13:45 2024 Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, Shahab CalibrationShorter shots with 98 Mo
now making shorter shots with 98-Mo
3 seconds each
50 MSPS

98Mo
13:57  RSA01-2024.05.18.13.57.32.674.tiq, RSA02-2024.05.18.13.57.32.472.tiq
13:58 RSA01-2024.05.18.13.58.32.760.tiq, RSA02-2024.05.18.13.58.32.552.tiq
14:00 RSA01-2024.05.18.14.00.23.759.tiq, ../RSA02/RSA02-2024.05.18.14.00.23.551.tiq
14:01 RSA01-2024.05.18.14.01.09.543.tiq, ../RSA02/RSA02-2024.05.18.14.01.16.038.tiq
14:01 RSA01-2024.05.18.14.01.54.049.tiq, ../RSA02/RSA02-2024.05.18.14.02.05.544.tiq 


last long shot :
14:05 RSA01-2024.05.18.14.05.14.375.tiq, ../RSA02/RSA02-2024.05.18.14.08.54.672.tiq

1 second each 


RSA01-2024.05.18.14.08.54.879.tiq
  92   Sat May 18 13:07:23 2024 Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, Shahab DAQLong measurements 100-Mo
Primary beam two shots, each 10 seconds 

13:06 --> RSA01-2024.05.18.13.05.41.969.tiq, ../RSA02/RSA02-2024.05.18.13.05.42.662.tiq
13:08 --> RSA01-2024.05.18.13.08.41.929.tiq, ../RSA02/RSA02-2024.05.18.13.08.42.621.tiq

for checking Markus hypothesis about the longevity of the bunched beam due to the ISO mode. This is important to understand lifetime measurements in ISO mode, otherwise the information might be affected.
  91   Sat May 18 12:31:45 2024 Yuri, Taka, Xinliang, Sophia, Yuanming, Ragan, ShahabDetectorsCooler Curve measurements
Cooler curve measurement, Primary Beam 100 Mo

center Freqs:
243.26875 MHz
408.03925 MHz

Running 13 harmonics
25 MHz
50 MSPS
1 sec

First injection:

-650, RSA01-2024.05.18.12.32.51.008.tiq, RSA02-2024.05.18.12.32.50.799.tiq
-700, RSA01-2024.05.18.12.34.53.819.tiq, RSA02-2024.05.18.12.34.53.611.tiq
-800, RSA01-2024.05.18.12.36.50.332.tiq, RSA02-2024.05.18.12.36.50.123.tiq
-1000, RSA01-2024.05.18.12.37.56.219.tiq, RSA02-2024.05.18.12.37.56.011.tiq
-1100, RSA01-2024.05.18.12.39.29.003.tiq, RSA02-2024.05.18.12.39.28.795.tiq
-1200, RSA01-2024.05.18.12.41.22.539.tiq, RSA02-2024.05.18.12.41.22.331.tiq
-1300, RSA01-2024.05.18.12.42.28.763.tiq, RSA02-2024.05.18.12.42.28.554.tiq
-1400, RSA01-2024.05.18.12.43.33.203.tiq, RSA02-2024.05.18.12.43.32.995.tiq
-1500, RSA01-2024.05.18.12.45.11.816.tiq, RSA02-2024.05.18.12.45.11.608.tiq


New injection:

uncoooled beam: RSA01-2024.05.18.12.49.09.850.tiq, RSA02-2024.05.18.12.49.09.642.tiq


-650, RSA01-2024.05.18.12.50.20.059.tiq, RSA02-2024.05.18.12.50.19.851.tiq
-650 (longer wait), RSA01-2024.05.18.12.52.37.936.tiq, RSA02-2024.05.18.12.52.37.728.tiq
-600, RSA01-2024.05.18.12.53.55.915.tiq, RSA02-2024.05.18.12.53.55.706.tiq
-500, RSA01-2024.05.18.12.55.31.146.tiq, RSA02-2024.05.18.12.55.30.938.tiq
-400, RSA01-2024.05.18.12.56.48.690.tiq, RSA02-2024.05.18.12.56.48.482.tiq
-300, RSA01-2024.05.18.12.58.16.906.tiq, RSA02-2024.05.18.12.58.16.698.tiq
-200, RSA01-2024.05.18.12.59.44.098.tiq, RSA02-2024.05.18.12.59.43.890.tiq
-100, RSA01-2024.05.18.13.00.38.088.tiq, RSA02-2024.05.18.13.00.37.880.tiq
0, RSA01-2024.05.18.13.01.28.466.tiq, RSA02-2024.05.18.13.01.28.258.tiq
  90   Sat May 18 02:22:30 2024 Helmut WeickAcceleratorpaper log book pages 17.05.2024
until we lost the beam in the night.
  89   Sat May 18 02:04:38 2024 Yoshi, OhnishiDAQRSA01 run
RSA01 was stopped from 19:25, it restart now.
  88   Sat May 18 01:57:44 2024 WeickAccelerator96Sr isoc setting
We fist verified the ESR after a crash with the 98Zr setting, was fine good resolution, 
then we scaled to 96Sr directly at gamma_t not with shift as before.
E_SIS        = 449.21 MeV/u for 100Mo 38+
after target = 373.36 MeV/u for  96Sr 38+ 
in ESR       = 373.60 MeV/u for  96Sr 38+
in the LISE calculation this leads to gamma = 1.40082 as before in the other settings.
yield is very low now, but some lines.
  87   Sat May 18 00:37:52 2024 Helmut, Wolfram, Shahab, David, XinliangRunsSIS beam gone
  86   Sat May 18 00:37:21 2024 Helmut, Wolfram, Shahab, David, XinliangRunsTrying to get back to Zr setting
  85   Sat May 18 00:15:44 2024 Yoshi, OhnishiGeneralBeam back
Beam is back, but it stopped again at 0:17......
  84   Sat May 18 00:06:56 2024 ShahabRunsHHT people out again
we try to re run the ESR. ESR behaves very strangely. Something not so right.
  83   Fri May 17 23:30:16 2024 ShahabGeneralHHT people inside
no beam since about one hour, also HHT people inside since about 10 min.
  82   Fri May 17 23:14:51 2024 Yoshi, OhnishiGeneralshift started
Just test
  81   Fri May 17 22:48:14 2024 Jelena BAcceleratorBack to old setting
We go back to the Zr-settings to make a deffinite state of ESR and we move again to previous setting (Sr) 
  80   Fri May 17 22:43:11 2024 Jelena B, Zsolt P.AcceleratorESR_e.cooler are back
We have back ESR and we have a fixed issue with a cooler. 

Beam issues! 
  Draft   Fri May 17 22:38:30 2024 Jelena B, Zsolt P. ESR + e.cooler are back
We have back ESR and fixed issue with a cooler. 
  78   Fri May 17 22:06:05 2024 Jelena B, Zsolt P.AcceleratorESR
ESR is down
  77   Fri May 17 21:56:58 2024 Jelena B, Zsolt P.AcceleratorOptimizing setting
We are optimizing setting for 96Sr
start time: 21:52
  76   Fri May 17 21:44:39 2024 Jelena B, Zsolt P.GeneralBeam issues
We do not have beam, and we have some instability during last 1-1.5 hour. 
  75   Fri May 17 20:33:43 2024 Jelena B, Zsolt P.GeneralBeam returned to FRS
We have again beam at FRS..
But we are taking still cycles on a same way as before...and discussing to go back to the old zirconium setting 

In one hour HHT will enter the cave. 
  74   Fri May 17 19:43:03 2024 Jelena B, Zsolt P., Shahab, DavidAnalysis+ Beam issues
Important - analysis 
-> we are trying to get PID with a new setting to see if 98Zr decays with 30s half-life
--> we are taking 1 min cycles 
---> strongest line does not corespondents to 96Sr38+ as it decays very fast (few seconds) and we observe long-lived one - still we have to confirm this 

----> analysis is still ongoing 

We lost the beam at 19:35

 
  73   Fri May 17 17:50:49 2024 Jelena B, Zsolt P., ShahabDAQnew trigger events
From 17:49 we have super short trigger. - see attached setting! 
  72   Fri May 17 17:09:26 2024 Helmut, YuryAcceleratorapprox. 96Sr setting (98Zr39+)
Only 96Sr would yield very few line with only ions from time to time.
So we went a bit lower in Brho 7.69 Tm -> 7.65 Tm.
The setting is calculated as a 98Mo39+.
E-SIS = 455.3 MeV/ for 100Mo,
after target 98Mo now with 39+ gives 7.6500 Tm.
In ESR also 39+.
In LISE we get the same average gamma as before for 98Zr (gamma = 1.40082).

The 98Zr was also entered as a 98Mo40+-
  71   Fri May 17 17:08:24 2024 Jelena B, Zsolt P.RunsNew setting from 5p.m.
NEW SETTING 

All runs from 17:00 are with new setting, due to changing the directory - transfer from old to new one around 200 runs.
  Draft   Fri May 17 17:03:39 2024 Helmut, YuryAcceleratorapprox. 96Sr setting
Only 96Sr would yield very few line with only ions from tiem to time.
So we went a bit lower in Brho 7.69 Tm -> 7.65 Tm.
The setting is calculated as a 98Mo39+.
E-SIS = 455.3 MeV/ for 100Mo.
after target 98Mo now with 39+ gives 7.6500 Tm.
In ESR also 39+.
In LISE we get the same average gamma as before for 98Zr (gamma = 1.40082).
  69   Fri May 17 16:42:00 2024 Jelena B, Zsolt P.GeneralBeam back
Beam is back at 16:38.

We are changing the setting.
  68   Fri May 17 16:34:43 2024 Jelena B, Zsolt P.GeneralBeam issues
We lost beam at 16:29. 
Cooler has to be investigated. 
  67   Fri May 17 05:48:33 2024 Ahmed, Zidarova, KalaidjievaRunsBeam stopped
HHT have more problems and need to enter the cave, beam is stopped for some time
Beam stop: 05:46
Beam back 6:31
  66   Fri May 17 00:15:24 2024 Ahmed, Zidarova, KalaidjievaRunsBeam gone
HHT called and said they have problems and need to enter the cave, so they stop the beam for some time
Beam Stop 00:10
Beam back 01:01
  65   Thu May 16 23:08:34 2024 Ahmed, ZidarovaRunsBeam dropped
Beam dropped between 23:00 and 23:05
  64   Thu May 16 21:51:22 2024 Ide, HubbardRunsIntensity back to previous values
since 21:48 particle intensities increased to again to 1.5E9
  63   Thu May 16 21:40:20 2024 Ide, HubbardRunsIntensity drop
Intensity in particles dropped from 21:33
  62   Thu May 16 21:26:50 2024 Ide, HubbardRunsIntensity back to previous values
since 21:20 the intensity is back to 1.5E9
  61   Thu May 16 21:13:18 2024 Ide, HubbardRunsIntensity drop
The intensity dropped at 21:10 from ~ 1.6E9 down to ~ 8E8
  60   Thu May 16 19:10:27 2024 Ide, Hubbard, Xinliang, David, ShahabRunsNew Run setting for Zr Isomer hunt
19:10 runs from now on run with an optimized setting:

we did a lot of optimization for the hunt of Zr isomer:

1- increased the time as much as possible, but stay within the 1:1 cycle with FRS
2- increased the sampling rate from 6.25 MSPS to 50 MSPS (!) going down to very short recording times --> 300ms only

We are now taking data with this settings for about half an hour.
  59   Thu May 16 18:55:38 2024 Ide, HubbardGeneralnew timing cycle
new timing cycle of 6.7s
  58   Thu May 16 18:33:30 2024 Ide, HubbardRunsBeam returned to ESR
Beam is back at 18:32 
now in the particle plot the peaks seem to be more isolated than before (see attachment 1)
since 18:36 it looks like before (see attachment 2)
  57   Thu May 16 18:28:31 2024 Ide, HubbardRunsNo beam to ESR
beam issues between 18:23-18:26
and beam completely lost from 18:27 till 18:32
in the SIS an issue with a dipole occured
  56   Thu May 16 16:45:33 2024 Ide, HubbardRunsBeam returned to ESR
beam is back
16:45
  55   Thu May 16 16:43:29 2024 YuriAcceleratorHHT
HHT sees radiation from us. We stop for 10 min for them to see the speed with which the radiation level decreases.
  54   Thu May 16 16:38:11 2024 Ide, HubbardRunsNo beam to ESR
because of problems in HHT
no beam from 16:36
  53   Thu May 16 16:10:03 2024 Ide, HubbardRunsLassie Screenshot
Lassie Screenshot taken at 16:09
  52   Thu May 16 15:24:30 2024 Ide, HubbardAcceleratornew Plunger setting
plunger motors were set

to +/-390 mm for 245 MHz resonator
and +/-55 mm for 410 MHz resonator
  51   Thu May 16 14:52:45 2024 ShahabDAQZr recording
Recording Zr starting from 14:45 again back to short cycle.
  50   Thu May 16 13:04:02 2024 Mayr, HannesRunsDAQ stopped, change setting to 98Zr
Beam tuning for 98Zr starting at 12:53, following data should be excluded from analysis. DAQ was stopped around 13:13.
  Draft   Thu May 16 12:48:58 2024 SergeyAcceleratorTune to 98Zr
- stop longer measurements
- change quadrupole and sextupole magnets
- rescale SIS-TE-ESR
  48   Thu May 16 11:20:10 2024 SergeyAcceleratorScreenshot of ESR pattern with 140 repetitions (each is 100 ms)
Injection Beam Process: 100ms
Bunching Beam Process: 16ms
Intermediate Beam Process: 100 ms, which is repeated 140 times
Intermediate Beam Process: 16 ms
  47   Thu May 16 11:13:05 2024 Mayr, HannesRunsRates
With the new timing, the rates now look like can be seen in the screenshot.
  46   Thu May 16 11:08:27 2024 Mayr, HannesRunsDAQ running again
"Real" measurement with good data starting from 11:07 until approximately 13:00.
Measurement time was changed to 10s with injections every 32s.
  45   Thu May 16 10:18:14 2024 Mayr, HannesRunsBeam back, DAQ off
Beam is back since 10:10, but DAQ is turned off to change the setting there.
Measurements starting at 10:18 are only test runs and should not be used for analysis.
  44   Thu May 16 09:41:56 2024 Mayr, HannesRunsNo beam
No beam from 09:39 to 10:10 due to a setting change. The change aims to increase the measurement time to 10s.
  43   Thu May 16 08:58:39 2024 Mayr, HannesRunsFluctuations in particle rate
Particle rates are fluctuating and increasing from a constant 5e8 to something around 1e9.
  42   Thu May 16 07:50:39 2024 Mayr, HannesRunsPeaks with very high particle rate
Peaks in the particle diagram going to unusual high 1.4e9 particles.
  41   Thu May 16 07:25:33 2024 Mayr, HannesRunsLassie Screenshot 07:23
Start of regular screenshots of the Lassie monitor every 1-2 hours.
  40   Thu May 16 04:37:27 2024 Boguslaw, CamilleRunsNo beam to ESR
We had no beam in ESR for about 3 minutes
  39   Thu May 16 00:37:41 2024 Boguslaw, CamilleRunsInjection pattern changed
The injection pattern changed on Lassie monitor (0:27 AM). (picture 1)

It when back to the previous rate at 1:48 AM. (picture 2)

The same pattern change appeared from 3:01 AM to 3:07 AM. (picture 3) and from 3:24 AM to 3:39 AM.
  38   Wed May 15 23:04:32 2024 XinliangAnalysisElectron cooler data
The cooler curve measured during May 14 afternoon.
  36   Wed May 15 20:40:51 2024 Jeroen, JohanRunsBeam returned to ESR
20:39:42 Runs restarted.
  35   Wed May 15 20:17:20 2024 JeroenAcceleratorFewer spills from SIS18 then lost beam
Apparently fewer spills coming from SIS18, see attached.

Beam was lost at 20:17:52. 
  34   Wed May 15 19:45:44 2024 Helmut WeickAcceleratorCooler curves after beam shift
After the Beam position tuning but before the scraper tuning two more cooler curves were taken.
The first with all scrapers open shows a similar shape to before with the same quadrupole setting.
Afterwards the ESR ebergy was shifted by -0.8 MeV/u to get the beam more on an outer orbit.
The curve then is shifted and has a bit less acceptance.
  33   Wed May 15 19:20:32 2024 Helmut WeickAcceleratorscraper setting
After the orbit correction on the target straight section the scrapers work better.
One pair of scrapers works best:
GEEXDS2HA (outside straight section =  low Brho side) = -4.0 mm
GE02DS3HG (outside arc              = high Brho side) = -71.4 mm
All other scrapers are open (finished playing with scrapers ~18:20)
When one side is opened more one can cut more on the other.
We can attack the beam from both sides.
With scrapers good resolution, David already posts lifetimes of the isomer.
Details in paper log book.
  32   Wed May 15 18:37:36 2024 Jeroen, Johan, ShahabRunsBeam returned to ESR
Beam returned at 18:30:55. Taking data with new triggers.
  31   Wed May 15 17:47:34 2024 Jeroen, Johan, ShahabGeneralNew Trigger Setup
We changed the trigger setup, see attachment
  30   Wed May 15 17:45:09 2024 Jeroen, JohanGeneralNo beam to ESR
Beam lost from SIS18 at 17:41:41.
  29   Wed May 15 17:22:43 2024 Jeroen, Shahab, JohanRuns98Mo run
Beam tuned at 4:50, data acquisition aligned for 98Mo at 4:56.
  28   Wed May 15 16:55:10 2024 Jeroen, JohanGeneralTuning ESR scraper. Isomer resolved.
4:50 Scraper tuned to produce Gaussian beam profile for 98Mo. Isomer now clearly resolved.

Plan to take data for 98Mo fragment for 12 hours. Measurements from 4:59 are now aligned so that the Molybdenum fragment is centered in the RSA acquisition.
  27   Wed May 15 13:39:10 2024 Beatriz, MinGeneralESR setting
From 13:37 ESR will be changed again. Now back to the primary beam, it will be attempted to measure the orbit of the beam.
  26   Wed May 15 12:58:12 2024 Beatriz, Min, ShahabRunsoptimizing the mass resolution
Yuri and Sergey still optimizing the mass resolution.

From 13:10 to ~ 13:35 SIS energy was increased to 457.4 (~3 MeV/u) to test whether this moves the best isochronicity to 98Mo (we were off before), -> Brho(98Mo)=7.12736 Tm

From ~13:35 back to setting up with the primary beam at 441.95 MeV (with target, same Brho as the 98Mo fragments). It will be attempted to measure the orbit of the beam
  25   Wed May 15 11:59:32 2024 Beatriz, MinDAQFile transfer to lustre looks to be stopped
File transfer to lustre looks to be stopped at around 11:35AM
  24   Wed May 15 11:45:22 2024 DavidAnalysisLustre Trouble
Since around 11:30, Lustre is down, therefore in https://sparc-daq-02.gsi.de/, the spectrograms are not being updated. Expected time to recovery > 2 hours.
The data will still be stored on the local hardisk. Whenever Lustre is online, we start file transfer and analysis.

Attached can be found an information email sent:
-------------------
Dear Lustre-users,

the main metadata server of the Lustre file system shows repeated errors that break I/O on at least
some clients.

We will have to restart the server, which will cause a downtime of min. 2 hours.
-----------------------------------------------------------------------
  23   Wed May 15 10:58:32 2024 Beatriz, MinGeneralBeam returned to ESR
Beam recovery at around 10:52:30. Sergey and Yuri still tuning the mass resolution.
  22   Wed May 15 09:35:08 2024 Beatriz, MinGeneralNo beam
At 9:32 we lost the beam. They have to work in the Unilac and there will be no beam for 45 minutes. 
  21   Wed May 15 06:15:02 2024 Chris, AsahiDAQData transfer to lustre looks to be stopped
File transfer to lustre looks to be stopped at 6:03

File copy program had stopped for some reason. 
After figuring out what the problem was, we have restarted the file copy and everything seems to be catching up.
  20   Wed May 15 02:12:59 2024 Chris G, Asahi YGeneralBeam returned to ESR
Injection to ESR restarted around 02:12:15
  19   Wed May 15 02:07:02 2024 Chris G, Asahi YGeneralNo beam to ESR
Injection to ESR stopped around 02:04:45.

Will continue to write data in hope that beam returns shortly.
  18   Wed May 15 01:27:13 2024 David, Asahi, Shahab, ChrisDAQRestarted data taking
Data taking restarted at 01:27 following re-alignment of the RSAs.

Also reduced number of processing threads to 10.
  17   Wed May 15 01:11:45 2024 David, Asahi, Shahab, Chris, RuijiuGeneralTime optimisation
DAQ stopped at 01:11 to optimise data taking cycle of RSAs. 
Changed data writing time from 2s -> 1.8s.
  16   Wed May 15 00:26:53 2024 David, Asahi, Shahab, Chris, RuijiuRunsFirst data file - 00:26
Centered resonant frequency on 98Mo+42 at the 126 harmonic (243.925 MHz) and 211 harmonic (408.483 MHz).
Recording for 2 seconds (injection start at 10%), injection every 6 seconds. 
  15   Wed May 15 00:17:24 2024 David, Asahi, Shahab, Chris, RuijiuDAQOptimizing the 245 resonance curve
  14   Wed May 15 00:06:10 2024 David, Asahi, Shahab, Chris, RuijiuDAQOptimizing the 410 resonance curve
  13   Tue May 14 23:46:04 2024 David, Asahi, ShahabDAQTrigger setup
GENESYS setup trigger

screen shot

https://clipboard.acc.gsi.de/screenshot-app/screenshots/tcl1064/2024-05-14_23-46-56-017.png
  12   Tue May 14 23:40:03 2024 Helmut, Sergey, YuryAcceleratorpaper log book
two pages of log book on paper for teh first setup,
injection into ESR and tuning primary beam 100Mo and fragment 98Mo.
  11   Tue May 14 23:22:55 2024 Helmut WeickAcceleratorisochronicity curves
Sergey started with a setting with quadrupoles already changed like in 2021.
Ths was used for the first isochronicity curves.
It also gave soem, however, not good peak shapes with scrapers closed.
But after a failure only a new setting of quads could revover the peaks.

Then more cooler curves were measured and found to have quite a slope.
Changing ESR energy does not change the curves much, but changing the quads does.
With the stronger variation of quads (+1.65% on two quadrupole families) the curve tilts to opposite side.

All curves in EXCEL.
Cooler voltage converted to Brho with gamma ~ 1.4 and curves in relative frequency spread shifted on top of each other.
In new injections the quads are set new, which causes a frequency jump. Pasted parts of curves to remove jump.
  10   Tue May 14 22:13:38 2024 David, Ruijiu, David, AsahiDAQdoing some test runs without accelerator trigger
empty shots for test.
  9   Tue May 14 21:41:11 2024 ShahabRunsTest Screenshot
  8   Tue May 14 19:07:27 2024 ShahabRunsBroadband measurement / High Sampling rate
Stable beam after a long time:


from below ones, only the last 4 ones are probably best.

RSA01-2024.05.14.17.36.49.211.tiq
RSA01-2024.05.14.17.38.25.867.tiq
RSA01-2024.05.14.17.38.39.827.tiq
RSA01-2024.05.14.17.38.54.555.tiq
RSA01-2024.05.14.17.39.08.523.tiq

and

RSA02-2024.05.14.17.32.58.640.tiq
RSA02-2024.05.14.17.36.48.947.tiq
RSA02-2024.05.14.17.37.02.258.tiq
RSA02-2024.05.14.17.38.25.603.tiq
RSA02-2024.05.14.17.38.39.587.tiq
RSA02-2024.05.14.17.38.54.315.tiq
RSA02-2024.05.14.17.39.08.283.tiq
  7   Tue May 14 15:07:23 2024 Ruijiu, David, Shahab, Xinliang, ZhangminRunsCooler curve measurement

Cooler curve measurement

# First run:
# V, RSA01-File, RSA02-File
-2300, RSA01-2024.05.14.15.21.21.576.tiq, RSA02-2024.05.14.15.21.21.334.tiq
-2200, RSA01-2024.05.14.15.22.56.743.tiq, RSA02-2024.05.14.15.22.56.501.tiq
-2100, RSA01-2024.05.14.15.24.17.833.tiq, RSA02-2024.05.14.15.24.17.591.tiq
-2000, RSA01-2024.05.14.15.25.34.248.tiq, RSA02-2024.05.14.15.25.34.006.tiq
-1900, RSA01-2024.05.14.15.26.39.602.tiq, RSA02-2024.05.14.15.26.39.359.tiq
-1800, RSA01-2024.05.14.15.27.41.204.tiq, RSA02-2024.05.14.15.27.40.962.tiq
-1700, RSA01-2024.05.14.15.28.45.781.tiq, RSA02-2024.05.14.15.28.45.539.tiq
-1600, RSA01-2024.05.14.15.29.49.831.tiq, RSA02-2024.05.14.15.29.49.589.tiq
-1500, RSA01-2024.05.14.15.31.02.912.tiq, RSA02-2024.05.14.15.31.02.670.tiq
-1400, RSA01-2024.05.14.15.32.53.806.tiq, RSA02-2024.05.14.15.32.53.564.tiq
-1300, RSA01-2024.05.14.15.34.02.599.tiq, RSA02-2024.05.14.15.34.02.357.tiq
-1200, RSA01-2024.05.14.15.35.32.079.tiq, RSA02-2024.05.14.15.35.31.836.tiq
-1100, RSA01-2024.05.14.15.36.35.601.tiq, RSA02-2024.05.14.15.36.35.359.tiq
-1000, RSA01-2024.05.14.15.37.52.778.tiq, RSA02-2024.05.14.15.37.52.536.tiq
-900, RSA01-2024.05.14.15.39.20.656.tiq, RSA02-2024.05.14.15.39.20.414.tiq
-800, RSA01-2024.05.14.15.40.24.019.tiq, RSA02-2024.05.14.15.40.23.777.tiq
-700, RSA01-2024.05.14.15.41.41.963.tiq, RSA02-2024.05.14.15.41.41.721.tiq
-600, RSA01-2024.05.14.15.42.53.140.tiq, RSA02-2024.05.14.15.42.52.899.tiq
-500, RSA01-2024.05.14.15.43.55.830.tiq, RSA02-2024.05.14.15.43.55.588.tiq


# Second run:

-1400, RSA01-2024.05.14.16.01.38.472.tiq, RSA02-2024.05.14.16.01.38.231.tiq
-1410, RSA01-2024.05.14.16.02.42.778.tiq, RSA02-2024.05.14.16.02.42.536.tiq
-1420, RSA01-2024.05.14.16.03.50.044.tiq, RSA02-2024.05.14.16.03.49.802.tiq
-1430, RSA01-2024.05.14.16.05.04.612.tiq, RSA02-2024.05.14.16.05.04.371.tiq
-1440, RSA01-2024.05.14.16.06.16.606.tiq, RSA02-2024.05.14.16.06.16.364.tiq
-1450, RSA01-2024.05.14.16.07.31.414.tiq, RSA02-2024.05.14.16.07.31.172.tiq
-1460, RSA01-2024.05.14.16.08.43.864.tiq, RSA02-2024.05.14.16.08.43.622.tiq
-1470, RSA01-2024.05.14.16.09.59.912.tiq, RSA02-2024.05.14.16.09.59.670.tiq
-1480, RSA01-2024.05.14.16.11.08.625.tiq, RSA02-2024.05.14.16.11.08.384.tiq
-1490, RSA01-2024.05.14.16.12.12.699.tiq, RSA02-2024.05.14.16.12.12.458.tiq
-1500, RSA01-2024.05.14.16.13.20.061.tiq, RSA02-2024.05.14.16.13.19.820.tiq
-1510, RSA01-2024.05.14.16.14.31.982.tiq, RSA02-2024.05.14.16.14.31.741.tiq
-1520, RSA01-2024.05.14.16.15.30.129.tiq, RSA02-2024.05.14.16.15.29.887.tiq
-1530, RSA01-2024.05.14.16.16.41.026.tiq, RSA02-2024.05.14.16.16.40.784.tiq
-1540, RSA01-2024.05.14.16.17.51.499.tiq, RSA02-2024.05.14.16.17.51.257.tiq
-1550, RSA01-2024.05.14.16.18.49.853.tiq, RSA02-2024.05.14.16.18.49.612.tiq
-1560, RSA01-2024.05.14.16.19.58.297.tiq, RSA02-2024.05.14.16.19.58.054.tiq
-1570, RSA01-2024.05.14.16.21.14.503.tiq, RSA02-2024.05.14.16.21.14.262.tiq
-1580, RSA01-2024.05.14.16.22.29.616.tiq, RSA02-2024.05.14.16.22.29.375.tiq
-1590, RSA01-2024.05.14.16.24.26.365.tiq, RSA02-2024.05.14.16.24.26.124.tiq
-1600, RSA01-2024.05.14.16.25.34.823.tiq, RSA02-2024.05.14.16.25.34.582.tiq
-1610, RSA01-2024.05.14.16.26.43.576.tiq, RSA02-2024.05.14.16.26.43.335.tiq
-1620, RSA01-2024.05.14.16.27.57.633.tiq, RSA02-2024.05.14.16.27.57.391.tiq
-1630, RSA01-2024.05.14.16.28.59.107.tiq, RSA02-2024.05.14.16.28.58.865.tiq
-1640, RSA01-2024.05.14.16.30.03.861.tiq, RSA02-2024.05.14.16.30.03.619.tiq
-1650, RSA01-2024.05.14.16.31.06.942.tiq, RSA02-2024.05.14.16.31.06.701.tiq
-1660, RSA01-2024.05.14.16.32.25.911.tiq, RSA02-2024.05.14.16.32.25.670.tiq
-1670, RSA01-2024.05.14.16.33.46.951.tiq, RSA02-2024.05.14.16.33.46.710.tiq
-1680, RSA01-2024.05.14.16.34.56.720.tiq, RSA02-2024.05.14.16.34.56.479.tiq
-1690, RSA01-2024.05.14.16.36.54.877.tiq, RSA02-2024.05.14.16.36.54.636.tiq
-1700, RSA01-2024.05.14.16.38.06.854.tiq, RSA02-2024.05.14.16.38.06.613.tiq


# Third run:

-1590, RSA01-2024.05.14.16.40.04.235.tiq, RSA02-2024.05.14.16.40.03.994.tiq

here computer crashed.


1. Preliminary result.
  6   Sun May 12 18:34:54 2024 RuijiuAnalysisHow to use queqiao to transfer tiq data
If the ssh to lxir131 was disconnected, you can connect to lxir131 and restart queqiao program to transfer tiq data from NAS to luster.

1. Open a terminal on any GSI linux computer, like the one in the Measurement Room:


2. start "Online data analysis system":

(base) litv-exp@lxg1478:~$ start_OnlineDataAnalysisSystem


3. click the 3rd button "Copy data from RSA hard disk to luster" to start "queqiao" program.

4. click "start" button on "queqiao" user interface to transfer tiq data on RSA spectrum analyzer.
  5   Thu May 9 15:59:30 2024 Ruijiu ChenDAQCarsten checked the NTCAP system.
Exactly this was the question. If several devices fail at the same time and you look for the course you might get suspicious.
 
Anyhow,
 
the NAS is working again. I assume this was only a temporary alert. I cannot trace the alert back to something special. One could do a S.M.A.R.T oft he HDDs to read out their status.
 
The bad new ist that the NI PXIe-1075 (crate) power supply seems to have a failure (95% sure). It is in a shuttle unit and can in priciple be replaced as a whole.
The shuttle itself is not easy to open itself, so to really measure the voltages is diffcult/takes some time. I tried to measure the voltages at an external connector (DB9 at backside of the crate) but as 
you might know it doesn’t have a „hard switch“ but some push button that starts some logic. Depending on the number of modules in the crate or if I switch on the fans on full intensity (as a load) the 
power of the crate immediately switches off or stays on a little bot longer. If you take out one or more modules (no particular one) the crate stays on a little bit longer. Some of the modules show an 
error then. I assume is because of wrong/missing power.
Again, I had no chance for a careful measurement of this behaviour, so I am not fully sure whether I am right.
 
Unfortunately, the crate itself cannot be bougth anymore (discontinued), similar ones are incredibly expensive and also usually not on stock
 
I suggest a twofold strategy :  We can bring the „power supply shuttle“ (that i shte name) to a specialist here at GSI, may be Shahab knows someone (or Jan/Uwe). May be there is a quick way to fix it.
In former times weh ad someone here at GSI.
 
Or try to get a new power supply shuttle (but it might be discontinued as well).
 
The full replament part (someone would need to contact NI and/or search the net, if a company/ebay still has it) is called:
 
„PXIe-1075 PowerSupplyShuttle“
I found two part numbers for it:
198136B-01L (original part number ont he back of the deivce)
780292-01 (official replacement part number) . However, NI doesn’t know about it on the web page.
 
http://download.ni.com/support/manuals/372539a.pdf
https://knowledge.ni.com/KnowledgeArticleDetails?id=kA00Z0000019N2CSAU&l=de-DE
 
Evtl. hier anfragen:
https://www.rosenkranz-elektronik.com/de/messgeraete/273795/national-instruments-ni-pxie-1075
 
or datatec, they also have a lot NI Pxie stuff.
https://www.datatec.eu/pxi-chassis
 
ebay?
 
However, again I am not 100% sure about the PS, but there are strong hints.
 
A few notes at the end:
 
Although none of the below is likely the reason for the failure, yet,
 
If a label on crate a states „please leave some headroom for ventilation“ then please do it. There might be a reason.
Please consider the maximum power that can be drawn from a single mains connection. Two crates (NIM/NI) + a server computer are quite something, in particular on a multi-outlet power strip….
Bending of cables, in particular of optical fibres… Don’t bend them two tight. The NI optical cable can also not be ordered anymore. Stiff long cables on tiny connector (found on several places on the NI 
crate).
 
I cannot take further care about the issue since I am pretty busy here with the Etarget beamtime but may be it helps soemhow.
 
Best,
 
Carsten
  4   Thu May 9 10:01:59 2024 Ruijiu ChenDAQNI crate of NTCAP system can not be started.
After moving the NTCAP system from HKR to ESR Messhutte, we tested the system with a signal generator on 16th February and confirmed that it was functioning correctly.

On 7th May, I and David tried to start the NTCAP system again. However, the main computer of the NTCAP system took a significantly longer time to boot up on 7th May. We 
managed to collect some data and subsequently shut down the LabVIEW interface on 7th May. The NTCAP system was running well during the test. In the afternoon of 7th May, to 
replace the new monitor, I turned off the NTCAP system except the hard disk of NTCAP.

 

On the morning of 8th May, I noticed an alert warning on the hard disk of the NTCAP system. Moreover, I found the NTCAP computer unexpectedly turned on. When I 
tried to start the system today at the office, it failed to boot. The SP Device indicator was flashing, and then the system powered down by itself.


I am concerned that not shutting down the hard disk might have contributed to these issues, although I am not entirely sure. 

1. Comparison of tdms files between 16th February and 7th May.
iq:
IQ_2024-02-16_11-00-53  0000000.iq.tdms   4196035 kB
IQ_2024-02-16_11-00-53  0000001.iq.tdms   4196035 kB
IQ_2024-02-16_11-00-53  0000002.iq.tdms   4196035 kB

IQ_2024-05-07_10-24-21  0000000.iq.tdms   4196035 kB
IQ_2024-05-07_10-24-21  0000001.iq.tdms   4196035 kB
IQ_2024-05-07_10-24-21  0000002.iq.tdms   4196035 kB

sc:
SC 2024-02-16[11-01-31 0000000.sc.tdms  386 kB
SC 2024-05-07 10-23-49 0000000.sc.tdms  136 kB

The iq and sc files recorded on 7th May are the same as the files which were recorded on 16 February. However, it took a long time to start the NTCAP system on 7th 
May. It seems that the status of NTCAP was wrong on 7 May. 

2. The hard disk of the NTCAP system was the old one on 06 February. The hard disk was replaced on 6th February and 7th May. 
  3   Thu May 9 09:12:59 2024 Dounia, ShahabDAQRSA file sync
RSA file sync with server was up with LXIR131 through to the Lustre.
  2   Mon May 6 12:16:09 2024 Ruijiu ChenDAQntcap scaler
  1   Tue Apr 16 15:35:07 2024 JanCollaborationG-PAC Proposal
ELOG V3.1.5-fc6679b