Entry  Fri Jun 20 06:37:51 2025, Konstantin, Accelerator, Position of contaminants 
I checked the positions of the contaminants. Therefore, I drove the scrapers and observed the signal at the Schottky detector

While the vertical positions are identical for all scrapers, the horizontal positions deviate due to the dispersion in the cooler section
Entry  Tue Jun 24 15:44:06 2025, Konstantin, DAQ, Phase shift in DAQ1 
In the SetParameters.C file is a parameter called fPar->piPhaseOffset. It was shifted from 100 to 50 in order to see ion bunches in the pmt signal and laser
pulses in the photodiode signal during the same revolution in the TDC spectrum. Note that this parameter must be taken 
into account when setting the window conditions of the arrival time in the SetConditions.C file. 
Entry  Fri Jun 20 11:25:32 2025, Julien, Kristian, Konstantin, Laser, Automated laser scans  
In contrast to entry [URL=https://elog.gsi.de/esr/E0052_2025/12]E12[/URL], the cabling for the automated start of the laser scan is now connected to [B]IO3
of sddsc221[/B].
Entry  Wed Jun 18 11:44:15 2025, Julien, Konstantin, Stefan, Rima, , Jitter CFD 
Pulses on photodiodes in entry 20 

1. seem wide, so we also looked at qswitch signal; also seemes wide.
Entry  Wed Jun 18 14:01:40 2025, Julien, Konstantin, Stefan, Rima, , Ion bunch on PMTs Bildschirmfoto_bunch_on_PMT_2025-06-18_14-11-44.png
Apparentlty did not work yesterday evening (no signal), but looks fine now (see attachment)
Entry  Wed Jun 18 07:59:00 2025, Julien, Konstantin, Laser, Phase-offset IMG_3889.jpgIMG_3888.jpgIMG_3891.jpgIMG_3892.jpg
We recognized that the output power of the pump laser was instable when externally triggered with 200kHz (stand-bye frequency of ESR). Therefore, we changed
the coarse timing offset of the pockels cell trigger compared to the flash lamp pulse from 215µs to 219.9µs. 
Thereby, the output power increased from ~600mJ to 620mJ, and the PTP stability improved from 15% to 10%. The RMS stability improved from 2% to 1.2 %.
Entry  Wed Jun 18 08:07:17 2025, Julien, Konstantin, Laser, new FCU Calibration 2025_06_18_FCU_Cal_Table.JPG2025_06_18_FCU_Cal_Plot.JPG
UV power was not stable but dropping from ~18 mW to 13 mW after opening COBRA shutters.
New calibration of frequency conversion unit:
Entry  Mon Jun 23 10:52:34 2025, Julian, Lukas, Zsolt, Nadine, Konstantin, Laser, Frequency conversion unit 
We exchanged the old BBO of the Cobra's FCU with a new one. The output power of the Cobra was around 120mJ. In the end, we achieved a UV power of about
21mJ. In addition, we optimized the fiber-coupling to the wavemeter. 
Entry  Mon Jun 23 10:59:36 2025, Julian, Lukas, Zsolt, Nadine, Konstantin, Runs, Scan routine 
-Start new injection
  ->wait for 60 injections to be complete
  ->note down SIS intensity (at extraction)
Entry  Thu Jun 26 18:13:17 2025, Jan, Carsten, Detectors, PMT voltages & thresholds 
current settings of PMT voltages and thresholds at the CAEN CFD:

PMT South   [HV ch2: 2700V]  [CFD ch0: 8]
Entry  Thu Jun 26 22:51:04 2025, Hendrik, Finn, Runs, Nightshift data runs 
After the scan at 22:04 teh FCU new was new calibrated. For this MEdusa was stopped and reopened in the laser lab. This stops the Labview server, and as
a consequence the the connection to the MBS was lsot. Then, MBS needs to be restarted and the online data is cleared. Such an intervention should avoided
as good as possible.
Entry  Fri Jun 27 06:55:45 2025, Esther. Konstantin, Laser, Laser-ion overlap 2025-06-27_06-52-01-807.png2025-06-27_07-12-27-135.png2025-06-27_07-32-28-599.png2025-06-27_07-51-52-620.png
We cross-checked the laser-ion superposition by using the T-scrapers. We did it only after the scans in order to do not change the duty cycle by much. Attachements
are in the order of the measurements compiled in the table.
Entry  Fri Jun 27 06:13:02 2025, Esther, Konstantin, Runs, Early shift - data taking 
[B]Notes:[/B] 
1. TE slits at -10 and +10
2. SIS intensity unstable until about 9:00 after that it became much more stable
Entry  Fri Jun 27 11:21:25 2025, Esther, Konstantin, DAQ, Timing 
We cross-checked the timing. Laser pulse is detected at bins 136 (PD-North) and 171 (PD-south), respectively. Therefore, the laser puls is in the electron
cooler at 153.5. The revolution period corresponds to 3e8Hz / 1.54315MHz = 194. 
The ion bunch must travel 2.5m more than the half of the circumference (108.3m). Taking this into account, the ion bunch must be detected (0.5 + 2.5 /
Entry  Wed Jun 18 00:33:56 2025, Esther, Alexis, Anton, Rodolfo, Carsten, DAQ, R4l-41 
We have some issues with the RIO computer R4l-41 (DAQ1). We had to switch off completely twice. Only then it reacted properly. Maybe a problem with the
network at about 00:00 o'clock? 
Entry  Wed Jun 18 01:58:02 2025, Esther, Alexis, Anton, Rodolfo, Carsten, Accelerator, No Bunched Beam Bildschirmfoto_PD_PMTSouth_2025-06-18_1.png
The Bunching is not set properly. We do not see the ion bunch with the Photomultiplier.
Entry  Sat Jun 28 15:28:22 2025, Carsten., Uwe , Runs, Runs with new scan range 
22:10  SIS Trafo GS09DT scale was changed to 4e8 (not just the lassie monitor)
23:50 Ausfall ESR: GE01 KP01 bis KP05 und KP22 bis KP24; Korrekturelement: GE02KX6 und GE01KX2; beam loss during measurement
01:45 reser press air Scrapers: GE02DD2_G (sc8,11); GE02DS03HG(sc7,8,11); GE01DD2IG(was sc7,10,11)(now7,8,11)
Entry  Mon Jun 16 21:47:23 2025, Carsten, Wilfried, Simon , Detectors, New threshold values for PMTs 
We adjusted the thresholds for the PMTs and increased the voltage of PMT middle to 2.7kV

[TABLE border="1"]
    Reply  Tue Jun 24 17:39:13 2025, Carsten, Stefan, Simon, Rima, Nils, Detectors, PMT behaviour - noise / PMT voltages / CFD Threshholds / CAEN Power supply (broken channel resetted) 
PMT North and South have been changed:

CFD CH0: Middle Thr 7 / CAEN HV Ch1: 2750 V
Entry  Mon Jun 16 22:27:01 2025, Carsten, Simon, DAQ, Thresholds  
We also adjusted the thresholds for the mesytic.
Doing that, we noticed that one of the trafos is broken (5th row, middle).