HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 1 of 9  Not logged in ELOG logo
Entry  Mon Mar 30 07:02:15 2020, tino, Runs, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  
I_cooler = 20 mA

beam: 206Pb81+
Entry  Sat Mar 28 16:12:25 2020, ruijiu, ragan, DAQ, enter ESR and turn on the HV crate. 
 
Entry  Tue Feb 25 15:48:31 2020, ruijiu chen, DAQ, Important folders of e121 eperiments: 
1. slow control:
1.1. program file:
litv-exp@ringpi:~/epics/mrcc_ioc/db $ 
Entry  Tue Feb 25 15:49:58 2020, ruijiu chen, DAQ, changing scaling factor. 
How to change scaling factor?
The parameters is in f_user.c file:
1. open the f_user.C with emacs :
Entry  Mon Mar 30 14:48:02 2020, ruijiu and Tino, Detectors, The leakcurrent of SiPad is over the setting limit. Screenshot_20200330-145551.jpgScreenshot_20200330-145544.jpgIMG_20200330_144915.jpg
Because the 
leakcurrent of 
6 Sipads is 
Entry  Mon Mar 30 15:03:58 2020, ruijiu Tino, Yuri, Lasoro, Nik and Uli, Detectors, the gas bottle is empty. IMG_20200330_152735_mh1585575780057.jpg
The gas bottle was empty. Tino replaced 
the previous old bottle with 50 bar gas left. 
Entry  Sat Mar 28 15:07:40 2020, ruijiu, DAQ, start run  
 
Entry  Sat Mar 28 15:19:23 2020, ruijiu, , start run e121_run_0236.lmd 
store 206Pb81+ beam inside ESR and measure its halflife. 
The HV of detector is off.
Start DAQ to record the ESR current in lmd file.
Entry  Sun Mar 29 09:40:35 2020, ruijiu, DAQ, restart go4 IMG_20200329_093354.jpg
go4 crush up. 
the problem is 
due to  mbs. 
Entry  Sun Mar 29 09:57:26 2020, ruijiu, Detectors, the HV of charged particle detector IMG_20200329_095014.jpg
        MHV1     MHV2
ch1:1st Sipad  4th 
Sipad
Entry  Sun Mar 29 10:09:14 2020, ruijiu, , start run e121_run_0237.lmd 
Sergey and Yuri are tuning Tl beam. The particle number in ers is about 1e4. I(SIS)=5e8
run stop: after few minutes (garbage data)
Entry  Sun Mar 29 13:05:36 2020, ruijiu, DAQ, start ntcap IMG_20200329_130438.jpg
IQ_2020-03-29_13-05-
56
SC_2020-03-29_13-05-
Entry  Sun Mar 29 14:01:45 2020, ruijiu, , beam position on DSSD IMG_20200329_140003.jpg
move the detector 1cm 
outside.from 60mm to 
70mm.
Entry  Sun Mar 29 14:29:13 2020, ruijiu, , e121_run_00240.lmd 
s6 positon at 50mm.
Entry  Sun Mar 29 18:41:31 2020, ruijiu, Analysis, Ratio between MPWC rate and DSSD rate ratio.png
slit Ratio error
-1 18.64 0.4
-2 18.18 0.38
Entry  Sun Mar 29 21:02:43 2020, ruijiu, Analysis, decay line of 205Tl beam main_s6_neg8_202003292059.pngmain_s6_neg8_202003292059.root
decay line of 205Tl beam with Ar gas jet target on and S6 slit at -8mm
Ar gas density~1e12 atoms/cm2
Entry  Sun Mar 29 21:39:27 2020, ruijiu, Analysis, Ionization cross section and capture cross section for h-206Pb + Ar 202003292141.png
Ionization cross section = 1320 barn.
Capture cross section = 557+137+44.5=735.5.
sigma_Ion/sigma_cap=1.79
Entry  Mon Mar 30 12:12:25 2020, ruijiu, General, Instruction of NTCAP for shift person Instruction_of_NTCAP_for_shift_person.png
To start a new run with NTCap, we need to retart NTCAP. 
1. Stop labview program. 
2. Start labview program and start a new run.
Entry  Mon Mar 30 13:40:57 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
Entry  Mon Mar 30 13:41:20 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
ELOG V3.1.5-fc6679b