HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 4 of 9  Not logged in ELOG logo
Entry  Fri Mar 27 19:59:09 2020, Ragan, General, Beam stacking in ESR is achieved 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOVstacking.png
Entry  Fri Mar 27 20:05:43 2020, Ragan, General, H2 gas jet ready BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
Entry  Fri Mar 27 20:52:31 2020, Ragan, General, Plans for the measurement with 206Pb81+ 
Entry  Sat Mar 28 01:14:19 2020, Ragan, General, Cross-section for capture and ionisation of 206Pb81+ with H2 target  GLOBAL.pdf
Entry  Sat Mar 28 11:07:49 2020, Ragan, RuiJiu, Tino, , General, Nikos is changing gas jet target 
Entry  Sat Mar 28 11:20:10 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, Reducing beam intensity in ESR 
Entry  Sat Mar 28 11:28:11 2020, Ragan, RuiJiu, Mei, Yuri, Tino, General, ESR open 
Entry  Sat Mar 28 13:09:11 2020, Mei,Yury, Tino, Ragan, Ruijiu, General, Shift plan 
Entry  Sat Mar 28 14:19:24 2020, Ragan, RuiJiu, Mei, Yuri, General, Instructions to change the electron cooler current instructions.pdf
Entry  Sat Mar 28 15:23:05 2020, Alex, Ragan, Mei Bai , General, beam lifetime measurement 15854053877798703970476301545600.jpg
Entry  Sat Mar 28 16:09:50 2020, Alex, General, no beam in the ESR 
Entry  Sat Mar 28 16:29:27 2020, Ragan, RuiJiu, Esther, General, Malfunction of several ESR machines 
Entry  Sat Mar 28 18:11:13 2020, Alex, Yuri, General, no beam in the ESR 
Entry  Sun Mar 29 12:56:02 2020, Ragan, RuiJiu, General, Good positive signals from MSCF E1DF3452-4051-4EFF-ADC2-519389D0E60F.MOV
Entry  Sun Mar 29 20:32:20 2020, Ragan, General, Template for Pb halflive measurement 
Entry  Sun Mar 29 21:55:47 2020, Ragan, General, MWPC Comparison.png
Entry  Mon Mar 30 01:07:29 2020, Ragan, General, Problem with SIS runstop: 0256 
Entry  Mon Mar 30 01:43:58 2020, Ragan, General, First measurement with 206Pb81+ beam pattern details 90FC7D41-6C97-4760-B5A3-3CF60643A405.jpegBF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg
Entry  Mon Mar 30 04:15:29 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 200 mA 1A7AE154-6A88-4AED-BA5D-748025FCD226.jpeg
Entry  Mon Mar 30 06:34:47 2020, Ragan, General, Second measurement with 206Pb81+ beam at I_cooler = 20 mA  C7A2736D-9C0A-4531-A768-85A55943EB5A.jpeg
ELOG V3.1.5-fc6679b