HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 4 of 9  Not logged in ELOG logo
ID Date Author Categoryup Subject
  23   Fri Mar 27 19:59:09 2020 RaganGeneralBeam stacking in ESR is achieved
Thanks to Sergey and Markus, stacking of primary H-like 206Pb81+ beam in ESR is achieved.

The stacking of the primary beam was established. There is continuous cooling on the injection orbit by stochastic cooling and by electron cooling on the stack orbit. (Time controlled operation of stochastic cooling could not be achieved due to controls issues). After stchastic cooling on the injection orbit the rf system decelerates the beam by 1.5 % in momentum and at the lower momentum electron cooling keeps the beam. The DC trafo shows accumulation of 10 injections of primary low intensity Pb81+ beam. Losses during the accumulation seems to be small.
Attachment 1: 8B7F254E-DB10-48B6-9E2E-9CA0FF998C12.MOV
Attachment 2: stacking.png
stacking.png
  24   Fri Mar 27 20:05:43 2020 RaganGeneralH2 gas jet ready
Thanks to Nikos, stable H2 gas jet target with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium )
Attachment 1: BAFA7906-5F66-4108-86F9-6D61573B43CD.MOV
  25   Fri Mar 27 20:52:31 2020 RaganGeneralPlans for the measurement with 206Pb81+
We plan to measure:

1. Lifetime of H-like 206Pb81+ beam with two electron cooler currents:
a) 200 mA
b) 10 mA (so that recombination rate is less)
using MWPC (capture detector in outer pocket) and CsISiPHOS (loss detector in inner pocket). 

2. To find the efficiency of the MWPC.
  26   Sat Mar 28 01:14:19 2020 RaganGeneralCross-section for capture and ionisation of 206Pb81+ with H2 target
Cross-section for capture and ionisation of 206Pb81+ with H2 gas jet target are calculated using GLOBAL code.
The ionisation (on CsISiPHOS) and capture (on MWPC) trigger rates are calculated for 206Pb81+ beam with 10^6 particles revolving in ESR ~2 MHz frequency with H2 gas jet target density ~ 10^14 particles/cm3.
Attachment 1: GLOBAL.pdf
GLOBAL.pdf GLOBAL.pdf
  30   Sat Mar 28 11:07:49 2020 Ragan, RuiJiu, Tino, GeneralNikos is changing gas jet target
The gas jet target is now being changed from H2 to Ar by Nikos.
  31   Sat Mar 28 11:20:10 2020 Ragan, RuiJiu, Mei, Yuri, TinoGeneralReducing beam intensity in ESR
Yuri reduces beam intensity in the ESR to reduce the countrate on the detectors.
  32   Sat Mar 28 11:28:11 2020 Ragan, RuiJiu, Mei, Yuri, TinoGeneralESR open
ESR is open now
  34   Sat Mar 28 13:09:11 2020 Mei,Yury, Tino, Ragan, RuijiuGeneralShift plan
From Yury,

For now, measure the beam life time with 3 different electron current in the e-cooler,i.e. 200mA(default), 10mA, and 20mA. For each current, 4 sets of 30mins long measurements shall be taken.

Starting from 9pm Helmut and Sergey will come for setting up FRS
  36   Sat Mar 28 14:19:24 2020 Ragan, RuiJiu, Mei, YuriGeneralInstructions to change the electron cooler current
Attached are the instructions on how to change the electron cooler current for the lifetime measurements of 206Pb81+ beam (interaction with residual gas and electron cooler).
Attachment 1: instructions.pdf
instructions.pdf instructions.pdf instructions.pdf instructions.pdf instructions.pdf
  39   Sat Mar 28 15:23:05 2020 Alex, Ragan, Mei Bai Generalbeam lifetime measurement
We see two species in the Schottky spectra during the beam lifetime measurement without the target. The one (probably the primiary beam) is significantly better cooled than the other.
So, we were wondering what is the other beam? Maybe the recombined ones?
Attachment 1: 15854053877798703970476301545600.jpg
15854053877798703970476301545600.jpg
  40   Sat Mar 28 16:09:50 2020 AlexGeneralno beam in the ESR
Ragan and Ruijiu went in the ESR for short time to fix something with the slow control of the silicon detector.
After this, there is no beam in the ESR.
  42   Sat Mar 28 16:29:27 2020 Ragan, RuiJiu, EstherGeneralMalfunction of several ESR machines
The HKR crew informs us that several machines in ESR are showing malfunctions.
The on-call expert cannot be reached.

Update (16:36): On-call service has been informed.

Update (16:48): ESR cycle stopped.
  43   Sat Mar 28 18:11:13 2020 Alex, YuriGeneralno beam in the ESR
Yuri and Sergey (on phone) have investigated extensively the problem with having no beam in the ESR. The FRS has been checked and seems OK. The ESR is fine as well.
The problem seems to be the timing. Ths SIS and the ESR seem to be completely out of synchronization. The on-call service for the control system has been called. 
  49   Sun Mar 29 12:56:02 2020 Ragan, RuiJiuGeneralGood positive signals from MSCF
As we (RuiJiu and me) changed the jumpers of MSCF 1, 2,3 and 4 yesterday, now we see nice positive signals on picoscope.
Yuri and Sergey are still working on optimising the Tl fragments !
Attachment 1: E1DF3452-4051-4EFF-ADC2-519389D0E60F.MOV
  57   Sun Mar 29 20:32:20 2020 RaganGeneralTemplate for Pb halflive measurement
beam: 
energy: 

purpose: data with electron cooler current xx mA

Detector position (CsISiPHOS):  mm
Detector position (MWPC):       mm

run start at xx:xx , first file: run0xxx.lmd
run stop  at xx:xx , last file:  run0xxx.lmd

_______________________________________________________________________________

time: 

I_cooler =  mA



HV1
CH1 voltage:           V  
CH1 leakage current:   uA

CH2 voltage:           V  
CH2 leakage current:   uA

CH3 voltage:           V  
CH3 leakage current:   uA

CH4 voltage:           V  
CH4 leakage current:   uA

HV2
CH1 voltage:           V  
CH1 leakage current:   uA

CH2 voltage:           V  
CH2 leakage current:   uA

CH3 voltage:           V  
CH3 leakage current:   uA

CH4 voltage:           V  
CH4 leakage current:   uA


SIS particles before:           
ESR particles at injection:     
ESR particles after stacking:     
Target ON density:              


NTCAp file:
IQ_2020-03-27_21-02-31/0000xxx.iq.tdms
SC_2020-03-27_21-02-31/0000xxx.iq.tdms

copy and repeat the above (below the line) every 30 minutes
  61   Sun Mar 29 21:55:47 2020 RaganGeneralMWPC
Alex goes to Messhute to check the signals from MPWC. After he completes, we start with the measurements with the primary beam )
Attachment 1: Comparison.png
Comparison.png
  65   Mon Mar 30 01:07:29 2020 RaganGeneralProblem with SIS runstop: 0256
There is problem with SIS
Run stop: 0257.lmd (at1:06)
  67   Mon Mar 30 01:43:58 2020 RaganGeneralFirst measurement with 206Pb81+ beam pattern details
The following shows the pattern for first measurement in ESR (gas jet is on for = 60*5 secs = 300 secs as it can be seen on step SC7 in pattern).
One injection cycle runs for ~ 6 mins.
Attachment 1: 90FC7D41-6C97-4760-B5A3-3CF60643A405.jpeg
90FC7D41-6C97-4760-B5A3-3CF60643A405.jpeg
Attachment 2: BF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg
BF20DBD8-1672-4817-8412-13B29CBF2E0A.jpeg
  74   Mon Mar 30 04:15:29 2020 RaganGeneralSecond measurement with 206Pb81+ beam at I_cooler = 200 mA
In the picture below, a very nice storage of 206Pb81+ at 200 mA electron cooler current for no gas jet target can be seen in ESR. The measurement started at 02:24 and we will now finish it in 5-10 mins. We will now do two more measurements for I_cooler = 10 mA ans 20 mA.
Attachment 1: 1A7AE154-6A88-4AED-BA5D-748025FCD226.jpeg
1A7AE154-6A88-4AED-BA5D-748025FCD226.jpeg
  79   Mon Mar 30 06:34:47 2020 RaganGeneral Second measurement with 206Pb81+ beam at I_cooler = 20 mA
In the ESR picture below, the decay of beam is very fast initially for few minutes and then the decay is constant. But why does it decay for first few minutes ?
Attachment 1: C7A2736D-9C0A-4531-A768-85A55943EB5A.jpeg
C7A2736D-9C0A-4531-A768-85A55943EB5A.jpeg
ELOG V3.1.5-fc6679b