165
|
Mon Apr 6 08:37:02 2020 |
Ragan, Shahab, Pierre-Michel | Runs | 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
|
8x |
166
|
Mon Apr 6 09:34:58 2020 |
Shahab | Runs | Pictures from one and a half hour measurement | cheers! |
|
167
|
Mon Apr 6 14:17:54 2020 |
Yuri, Shahab | Runs | FRS valves | We saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum |
|
168
|
Mon Apr 6 14:57:04 2020 |
Shahab | Runs | cooler down | cooler component GECEBG2T again had to be
reset. |
|
13
|
Wed Jan 29 10:42:42 2020 |
Shahab | General | Gas target control with the new control system event |
Many thanks to Sergey and Nikos we have tested
the connection of the new control system |
    |
14
|
Fri Feb 21 11:30:52 2020 |
Laszlo | General | Shift plan | e127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0
e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0 |
|
18
|
Thu Mar 26 17:21:40 2020 |
Ragan | General | Stochastic cooling | 1) From SIS, 206Pb67+ @401.17 MeV/u goes to
FRS where only SEETRAM is placed in the target
area to strip off 206Pb67+ to get 206Pb81+.
|
|
19
|
Fri Mar 27 13:02:07 2020 |
Ragan | General | Stochastic cooling | 1) ESR team is successful with the Stochstic
cooling of primary H-like 206Pb81+ beam @400
MeV/u.
|
|
20
|
Fri Mar 27 13:04:17 2020 |
Ragan | General | FRS Settings until now | Yuri and Helmut have been extensively involved
in tuning and optimizing of the FRS.
|
 |
21
|
Fri Mar 27 13:40:54 2020 |
Ragan | General | NTCap start and shutdown information | The attachment contains information on how
to start and shutdown NTCap and bridge computer. |
|
22
|
Fri Mar 27 19:51:37 2020 |
Ragan | General | ESR Machine | By changing the tune to Qx=2.33, Qy=2.36 the
momentum acceptance was significantly improved.
A variation of the cooler voltage of 10300 |
|
23
|
Fri Mar 27 19:59:09 2020 |
Ragan | General | Beam stacking in ESR is achieved | Thanks to Sergey and Markus, stacking of primary
H-like 206Pb81+ beam in ESR is achieved.
|
 |
24
|
Fri Mar 27 20:05:43 2020 |
Ragan | General | H2 gas jet ready | Thanks to Nikos, stable H2 gas jet target
with 10^14 particles/cm^3 is ready.
(More information can be found on: https://ulpc24.gsi.de/cgi-bin/jet.py?gasart=Helium |
|
25
|
Fri Mar 27 20:52:31 2020 |
Ragan | General | Plans for the measurement with 206Pb81+ | We plan to measure:
1. Lifetime of H-like 206Pb81+ beam with |
|
26
|
Sat Mar 28 01:14:19 2020 |
Ragan | General | Cross-section for capture and ionisation of 206Pb81+ with H2 target | Cross-section for capture and ionisation of
206Pb81+ with H2 gas jet target are calculated
using GLOBAL code.
|
|
30
|
Sat Mar 28 11:07:49 2020 |
Ragan, RuiJiu, Tino, | General | Nikos is changing gas jet target | The gas jet target is now being changed from
H2 to Ar by Nikos. |
|
31
|
Sat Mar 28 11:20:10 2020 |
Ragan, RuiJiu, Mei, Yuri, Tino | General | Reducing beam intensity in ESR | Yuri reduces beam intensity in the ESR to
reduce the countrate on the detectors. |
|
32
|
Sat Mar 28 11:28:11 2020 |
Ragan, RuiJiu, Mei, Yuri, Tino | General | ESR open | ESR is open now |
|
34
|
Sat Mar 28 13:09:11 2020 |
Mei,Yury, Tino, Ragan, Ruijiu | General | Shift plan | From Yury,
For now, measure the beam life time with |
|
36
|
Sat Mar 28 14:19:24 2020 |
Ragan, RuiJiu, Mei, Yuri | General | Instructions to change the electron cooler current | Attached are the instructions on how to change
the electron cooler current for the lifetime