HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075 E0203_E0018 E0052_2025
  Bound beta decay experiment on Tl-205, Page 8 of 9  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Authordown Category Subject Text Attachments
  107   Tue Mar 31 20:32:05 2020 RaganGeneral203Tl80+ 200Hg79+ 205Tl81+Below in the schottky spectrum, on left is
203Tl80+ contamination, in middel is 200Hg79+
contamination and on right most is 205Tl81+.
 85AD7203-736C-4531-BA80-D045CC690BED.jpeg 
  108   Tue Mar 31 20:50:05 2020 RaganGeneral200Hg79+ 205Tl81+203Tl80+ impurity is removed by moving scrapper
inside ESR.
Only 220Hg79+ is left now
 31E7D028-F469-4BFF-B683-203821C174E9.jpeg 
  109   Tue Mar 31 21:07:05 2020 RaganGeneralSeparation of 203Tl80+ and 200Hg79+ using scrapper in ESRIt can be seen in the video how 203Tl80+ (on
extreme left) and then 200Hg79+ (in middle
originally) is separted from 205Tl81+ by
 06B012F5-5435-41D7-AD82-4A5FDADF281E.MOV 
  113   Thu Apr 2 02:36:48 2020 RaganGeneralStochastic cooling and orbit problemOn 1 April by 5 pm, we could stop the stochastic
cooling after the stacking process and also
change the orbit of the Tl beam to centre.
  
  117   Thu Apr 2 06:25:13 2020 RaganRunsTemplatebeam: 205Tl81+ (no scraping)
energy: 400 MeV/u
storage time: ___ hrs
  
  121   Thu Apr 2 15:24:15 2020 RaganGeneralHow to know whether electron cooling is workingFor Alle and Kuehler the bottom left status
should look like as shown in pictures below.
 IMG_8238.JPGIMG_8239.JPG 
  143   Sat Apr 4 03:06:12 2020 RaganGeneralInstructions if electron cooler goes off during long storage time measurementsPlease read the attachment.  electron_cooler.pdf 
  169   Mon Apr 6 20:03:50 2020 RaganGeneralExperiment finished ))E121 experiment is finished with the last
10 hours measurement at 19:47 ))
Many thanks to everyone for there significant
  
  170   Thu Apr 9 11:16:35 2020 RaganGeneralMeasurements done in the experiment   storage11.pdfstorage12.pdfstorage13.pdf 
  173   Mon Apr 20 11:17:18 2020 RaganGeneralLogbook   logbook.pdfcombined_FRS.pdfcombined_data.pdf 
  183   Sun May 30 12:09:00 2021 RaganGeneralNTCAPAttached is the info given by Carsten.
The instructions to operate NTCAP are given
on https://wiki.gsi.de/ESR_EXP/ManualOfNTCAP
 ntcap_carsten.pdf 
  182   Mon Mar 29 16:31:09 2021 Pierre-MichelDAQcross section(1.393*^-8 + 3.18*^-13 + 4.707*^-8)/4.707*^-8
= 1.29595
 Pb81onAr.png 
  34   Sat Mar 28 13:09:11 2020 Mei,Yury, Tino, Ragan, RuijiuGeneralShift planFrom Yury,

For now, measure the beam life time with
  
  14   Fri Feb 21 11:30:52 2020 LaszloGeneralShift plane127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0

e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0
  
  1   Thu Sep 13 11:32:17 2018 Jan GloriusCollaborationProposalAttached is the beam time proposal submitted
and accepted by the G-PAC in 2017.
 E121_Litvinov.pdfE121_Approval.pdf 
  4   Fri Dec 7 10:56:04 2018 Jan GloriusSlowControlEPICS ioc on raspberryWe have an EPCIS server (ioc) running on our
raspberry (ext-027377). It talks to our MesyTec
modules (MSCF shapers, MHV4 high-voltages).
  
  5   Fri Dec 7 11:39:41 2018 Jan GloriusSlowControlGUI for remote control of MSCF+MHV4We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
  
  9   Tue May 28 08:36:14 2019 JanDAQMBS start & RFIO serverYou need a DAQ-PC and the RIO crate computer.
All of the DAQ proceedures laid out here
are operated from inside the DAQ screen session.
  
  10   Wed Jun 26 16:20:31 2019 JanDAQunpacker: lmd > rootI have written an unpacker for the lmd data
taken with the current daq-system for E121.
The crate configuration is as follows:
 E121.specdet_mapping.hh 
  62   Sun Mar 29 23:48:12 2020 JanAnalysisrun0251: E_spectra for CsISiPhos This is a collection of energy spectra of
the CsISiPhos detectors from run0251 with
primary beam.
 14x 
ELOG V3.1.5-fc6679b