ID |
Date |
Author |
Category |
Subject |
Text |
|
151
|
Sat Apr 4 19:55:37 2020 |
Ragan, Alex, Esther | Runs | Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) | FAILED - measurement was stopped by sudden
loss of the beam
|
|
153
|
Sat Apr 4 23:44:22 2020 |
Ragan, RuiJiu, Laszlo | Runs | Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
|
|
154
|
Sun Apr 5 10:21:54 2020 |
Shahab | Runs | 10 hour measurement pictures | Schottky pictures from the 10 hour measurement
gas target, including the time before gas
target. |
|
155
|
Sun Apr 5 10:31:08 2020 |
Ragan, Shahab | Runs | Two hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: hr
|
|
156
|
Sun Apr 5 12:48:58 2020 |
Shahab | Runs | 2hour measurement parent pictures | |
6x |
157
|
Sun Apr 5 13:05:43 2020 |
Ragan, Shahab | Runs | Zero measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
|
|
158
|
Sun Apr 5 15:28:35 2020 |
Ragan, Alex, Esther | Runs | Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
|
7x |
159
|
Sun Apr 5 20:23:02 2020 |
Ragan, Alex, Esther | Runs | Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
|
7x |
160
|
Sun Apr 5 21:50:02 2020 |
Ragan, Alex, Esther | Runs | Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
|
7x |
161
|
Sun Apr 5 23:28:01 2020 |
Ragan, Alex, Esther | Runs | One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
|
7x |
162
|
Mon Apr 6 01:02:00 2020 |
Ragan, Laszlo, Nikos | Runs | Three hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hr
|
9x |
163
|
Mon Apr 6 05:28:55 2020 |
Ragan, Laszlo, Nikos | Runs | Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
|
|
164
|
Mon Apr 6 05:43:50 2020 |
Ragan, Laszlo, Nikos | Runs | One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
|
|
165
|
Mon Apr 6 08:37:02 2020 |
Ragan, Shahab, Pierre-Michel | Runs | 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) | beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
|
8x |
166
|
Mon Apr 6 09:34:58 2020 |
Shahab | Runs | Pictures from one and a half hour measurement | cheers! |
|
167
|
Mon Apr 6 14:17:54 2020 |
Yuri, Shahab | Runs | FRS valves | We saw reduction in ESR beam life. It turned
out that FRS has opened valves and venting
caused us reduction of the quality of vacuum |
|
168
|
Mon Apr 6 14:57:04 2020 |
Shahab | Runs | cooler down | cooler component GECEBG2T again had to be
reset. |
|
4
|
Fri Dec 7 10:56:04 2018 |
Jan Glorius | SlowControl | EPICS ioc on raspberry | We have an EPCIS server (ioc) running on our
raspberry (ext-027377). It talks to our MesyTec
modules (MSCF shapers, MHV4 high-voltages).
|
|
5
|
Fri Dec 7 11:39:41 2018 |
Jan Glorius | SlowControl | GUI for remote control of MSCF+MHV4 | We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
|
|
8
|
Tue May 7 15:52:47 2019 |
Chen, Sidhu | SlowControl | GUI for remote control of MSCF+MHV4 [detailed] | We have a GUI for remote controlling our MesyTec
modules MSCF16 and MHV4 for E121 experiment.
|
|