HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 9 of 9  Not logged in ELOG logo
Entry  Sat Apr 4 19:55:37 2020, Ragan, Alex, Esther, Runs, Failed measurement...Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_19-54-47-760.png2020-04-04_20-02-26-363.png
FAILED - measurement was stopped by sudden loss of the beam 

beam: 205Tl81+ (no scraping , Al ~1g/cm2)
Entry  Sat Apr 4 23:44:22 2020, Ragan, RuiJiu, Laszlo, Runs, Ten hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-04_23-43-29-909.png2020-04-05_09-41-00-904_10.png6275225E-0E05-42AF-9F64-F666263D89B8.jpegA12CCF1C-16DC-4869-A54C-ED812E921E3C.jpegC075E863-D102-41EE-A8CF-62220D949F4A.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
Entry  Sun Apr 5 10:21:54 2020, Shahab, Runs, 10 hour measurement pictures 2020-04-05-10h-aftergasjet2.PNG2020-04-05-10h-aftergasjet.PNG205Tl_gasjet_view3.PNG
Schottky pictures from the 10 hour measurement gas target, including the time before gas target.
Entry  Sun Apr 5 10:31:08 2020, Ragan, Shahab, Runs, Two hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-05_10-30-25-440.png2020-04-05_10-51-22-398.png2020-04-05_12-44-55-857.png93A21749-0099-4D69-8D40-32D8EC02342C.jpegFC9B44C4-D9C7-48B0-98DA-132A6CEF3596.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time:  hr
Entry  Sun Apr 5 12:48:58 2020, Shahab, Runs, 2hour measurement parent pictures 6x
 
Entry  Sun Apr 5 13:05:43 2020, Ragan, Shahab, Runs, Zero measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-05_13-04-08-686.png22A1BDA0-CAC3-4CB3-951E-F99ACD9CAED6.jpeg2020-04-05_13-58-21-916.pngCC28F701-F809-4100-982D-25E67770CAA7.jpeg
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Sun Apr 5 15:28:35 2020, Ragan, Alex, Esther, Runs, Four hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 4 hr
Entry  Sun Apr 5 20:23:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 21:50:02 2020, Ragan, Alex, Esther, Runs, Half-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0.5 hr
Entry  Sun Apr 5 23:28:01 2020, Ragan, Alex, Esther, Runs, One-hour measurement (S2: 0/35 mm and S6: -20/7 mm) 7x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1 hr
Entry  Mon Apr 6 01:02:00 2020, Ragan, Laszlo, Nikos, Runs, Three hour measurement (S2: 0/35 mm and S6: -20/7 mm) 9x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 3 hr
Entry  Mon Apr 6 05:28:55 2020, Ragan, Laszlo, Nikos, Runs, Zero hour measurement (S2: 0/35 mm and S6: -20/7 mm) 46C168E2-D1D5-4CD3-B87F-7F82D045D527.jpegC55A1803-E814-412F-B3DC-40FE24946F8A.MOV75662B09-68EE-49FD-9BB2-71766305ECF8.jpeg1C0040AA-3CE4-4019-B85E-0049EBE85384.jpeg2020-04-06_05-40-47-352.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 0 hr
Entry  Mon Apr 6 05:43:50 2020, Ragan, Laszlo, Nikos, Runs, One and a half hour measurement (S2: 0/35 mm and S6: -20/7 mm) 2020-04-06_06-18-59-809.png946073FA-3077-4CBF-900B-565BD19CF040.jpeg10FEB6AE-653B-4803-9927-EEB5BF33D3ED.jpeg2020-04-06_08-03-40-493.png
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 1.5 hr
Entry  Mon Apr 6 08:37:02 2020, Ragan, Shahab, Pierre-Michel, Runs, 10 hour measurement (S2: 0/35 mm and S6: -20/7 mm) 8x
beam: 205Tl81+ (no scraping , Al ~1g/cm2)
energy: 400 MeV/u
storage time: 10 hr
Entry  Mon Apr 6 09:34:58 2020, Shahab, Runs, Pictures from one and a half hour measurement wideband_rec_001.PNG
cheers!
Entry  Mon Apr 6 14:17:54 2020, Yuri, Shahab, Runs, FRS valves 2020-04-06_14-22-20-965.png
We saw reduction in ESR beam life. It turned out that FRS has opened valves and venting caused us reduction of the quality of vacuum in ESR leading to beam
loss. We manged to closed GEE5VV so that now beam is stable somehow.
Entry  Mon Apr 6 14:57:04 2020, Shahab, Runs, cooler down 
cooler component GECEBG2T again had to be reset.
Entry  Fri Dec 7 10:56:04 2018, Jan Glorius, SlowControl, EPICS ioc on raspberry 
We have an EPCIS server (ioc) running on our raspberry (ext-027377). It talks to our MesyTec modules (MSCF shapers, MHV4 high-voltages).
In principal it should be running all the time, but here is the manual how to check/start it:
Entry  Fri Dec 7 11:39:41 2018, Jan Glorius, SlowControl, GUI for remote control of MSCF+MHV4 
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
Entry  Tue May 7 15:52:47 2019, Chen, Sidhu, SlowControl, GUI for remote control of MSCF+MHV4 [detailed] 000000000003.png
We have a GUI for remote controlling our MesyTec modules MSCF16 and MHV4 for E121 experiment.

Here is the instructions to run it:
ELOG V3.1.5-fc6679b