HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  Bound beta decay experiment on Tl-205, Page 3 of 9  Not logged in ELOG logo
Entry  Sat Mar 28 04:50:34 2020, Ragan, Detectors, MWPC 4475A53F-48AB-430E-8A22-7D92E5FEACBF.jpeg
Alex and Pierre-Michel applied 1500 V to the anode and adjusted the threshold in Messhute.
x1 signal was small & noisy and rest of the signals were fine.
Entry  Sat Mar 28 11:00:14 2020, Ragan, RuiJiu, Mei, Yuri, Tino, Detectors, Movement of detector IMG_20200328_110253.jpgIMG_20200328_110258.jpg
10:51 am the CsISiPHOS is moved to 65 mm from 60 mm.The spot on the DSSSD is changed by 5 mm which confirms the hit of the beam.

11:05 
Entry  Sun Mar 29 09:57:26 2020, ruijiu, Detectors, the HV of charged particle detector IMG_20200329_095014.jpg
        MHV1     MHV2
ch1:1st Sipad  4th 
Sipad
Entry  Mon Mar 30 13:40:57 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
Entry  Mon Mar 30 13:41:20 2020, ruijiu, Detectors, HV of Inner detector IMG_20200330_133909.jpg
 
Entry  Mon Mar 30 14:48:02 2020, ruijiu and Tino, Detectors, The leakcurrent of SiPad is over the setting limit. Screenshot_20200330-145551.jpgScreenshot_20200330-145544.jpgIMG_20200330_144915.jpg
Because the 
leakcurrent of 
6 Sipads is 
Entry  Mon Mar 30 15:03:58 2020, ruijiu Tino, Yuri, Lasoro, Nik and Uli, Detectors, the gas bottle is empty. IMG_20200330_152735_mh1585575780057.jpg
The gas bottle was empty. Tino replaced 
the previous old bottle with 50 bar gas left. 
Entry  Mon Mar 30 16:25:05 2020, ruijiu, Detectors, turn down the HV 
turn down the hv and pull out the detector.  

suggest by 
Entry  Mon Mar 30 20:51:06 2020, Ragan, Detectors, Bias Voltage for Si-pads Si_pad_bias-voltage.ods
The limit of the leakage current for all Si pads was increased from 1500 nA to 5000nA and 
leakage current was recorded for different Bias Voltages (32V, 35V, 40V, 45V, 50V, 55V 
and 60V).
Entry  Wed Apr 1 01:02:24 2020, ruijiu, Detectors, the detector cable is disconnected. 
 
Entry  Wed Apr 1 01:05:36 2020, ruijiu, Detectors, detector position fixed at 60 mm VID_20200401_010416.mp4
The detector cable was disconnected . We entered and reconnected the cable.
Entry  Thu Nov 19 09:14:40 2020, Jan, Detectors, remote MSCF settings for CsISiPHOS setting.1585477986det_mapping.png
Attached is a list of all set values for the 5 MSCF shaper modules.
This was done prior to run0251, which served as a final benchmark for those settings.
See: https://elog.gsi.de/esr/E121/62
Entry  Tue Dec 8 15:47:07 2020, Jan, Detectors, manual preamp & shaper settings for CsISiPhos amp_settings.pdf
attached is a document showing fotos of all involved amplifiers in the chain to document the manual settings active during the experiment.

Summary:
Entry  Wed Jan 29 10:42:42 2020, Shahab, General, Gas target control with the new control system event IMG_20200128_153508.jpgIMG_20200128_145345.jpgIMG_20200128_145340.jpgIMG_20200128_145307.jpgIMG_20200128_144555.jpg

Many thanks to Sergey and Nikos we have tested the connection of the new control system for turning on and off of the gas target.
Entry  Fri Feb 21 11:30:52 2020, Laszlo, General, Shift plan 
e127: https://docs.google.com/spreadsheets/d/14m8WcCq1erx6HqWJRK7TLbCx121IkjqGa5l-frf4YjI/edit#gid=0

e121: https://docs.google.com/spreadsheets/d/10MUzA5-Ilf2WzCyNj8u_KSG6yzPg0e4vtZGGPFB3K-k/edit#gid=0
Entry  Thu Mar 26 17:21:40 2020, Ragan, General, Stochastic cooling 
1) From SIS, 206Pb67+ @401.17 MeV/u goes to FRS where only SEETRAM is placed in the target area to strip off 206Pb67+ to get 206Pb81+.
2) There is 206Pb81+ (H-like primary beam) inside ESR at 400 MeV/u.
3) The ESR team is now trying Stochastic cooling with 206Pb81+ beam at 400 MeV/u.
Entry  Fri Mar 27 13:02:07 2020, Ragan, General, Stochastic cooling stochastic_cooling.PNG
1) ESR team is successful with the Stochstic cooling of primary H-like 206Pb81+ beam @400 MeV/u.
2) Now, they are trying for stacking of the beam.
Entry  Fri Mar 27 13:04:17 2020, Ragan, General, FRS Settings until now frs.pdfFRS.pdf
Yuri and Helmut have been extensively involved in tuning and optimizing of the FRS.

26th March, 2020 (Evening setting):
Entry  Fri Mar 27 13:40:54 2020, Ragan, General, NTCap start and shutdown information ntcapmanual.pdf
The attachment contains information on how to start and shutdown NTCap and bridge computer.
Entry  Fri Mar 27 19:51:37 2020, Ragan, General, ESR Machine 
By changing the tune to Qx=2.33, Qy=2.36 the momentum acceptance was significantly improved. A variation of the cooler voltage of 10300 V was possible without
beam loss. That corresponds to a momentum acceptance of 2.7 %. That should provide good conditions for longitudinal stacking.
ELOG V3.1.5-fc6679b