HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038 E0075
  dN=0 experiment, Page 1 of 2  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subject
  1   Tue Mar 23 08:39:11 2021 Martino Trassinelli Target triggers
Settings for the event triggers (on left - machine 6 event 32 / off right - machine 7 event 32) (first picture)

Unplug the black no 1 to twitch of target, but remaining the cycle and triggering of the camera (second picture).
Attachment 1: triggers_gas-jet.jpeg
triggers_gas-jet.jpeg
Attachment 2: target_inhibit.jpeg
target_inhibit.jpeg
  2   Tue Mar 23 08:42:11 2021 Martino TrassinelliRunsBeam nominal set-up
- 238U89+ at the energy of 30.16 MeV/u for the Li-like from excitation --> 1-3 days of beam time
        
- 238U91+ at the energy of 41.035 MeV/u for the He-like from capture --> 10 or more days of beam time
  3   Wed Mar 24 22:45:37 2021 Martino TrassinelliGeneralAccelerator cycle
Cycle at present
Attachment 1: acc_cycle.jpeg
acc_cycle.jpeg
  4   Wed Mar 24 22:48:09 2021 Martino Trassinelli Typical cycle
Typical cycle at present
Attachment 1: typical_cycle.jpeg
typical_cycle.jpeg
  5   Thu Mar 25 01:37:04 2021 Martino TrassinelliRunsChange in the gas-jet density
We reduced the pressure of the gas-jet target at 0:45AM. Now it is about 7E11 (indicated as 7x10E11 in the webpage of the control).
Beam cycle: ~45 s
Target on: 2x5  = 10 s

For the cameras: 
Integration time: 10 s
waiting time: 30 s
Attachment 1: DSC_3187.JPG
DSC_3187.JPG
  6   Thu Mar 25 08:59:50 2021 Martino TrassinelliRunsSummary of the last evening night
Starting from about 23:40 we have a complete set-up with Ge detector and particle detector. Gas jet density about 1.1e12.

Between 23:40a and 00:10 the waiting time of the CCDs was too short --> additional noise in the CCDs.
Then failure of the GE camera too in data07 files.

Starting from 00:45, 
- new gas jet pressure of 7E11 a/cm2
- injection with 1E7 ions
- cycle time: 46 seconds
- measurement time: 10 secons 
- CCD waiting time: 30 seconds

No problem until 5:04 --> failure in the UNILAC

6:30 Zn calibration (01, 20 minutes) but with the ESR cycle still active!! 
6:50 backround calibration (background1)

7:15 Ge detector filling

7:25 Restart new measurement data05

8:45: Closing data05 opening data06

8:50: injection failure in ESR for files n=3-4

8:52 beam is back

(then we try to write here more regularly.....)
  7   Thu Mar 25 11:42:14 2021 Martino TrassinelliDAQTDC recalibration
Check of the TDC spectrum:it is strange. Uwe and Jan recheck all the chain. Still strange behavior.  
Meanwhile CCD acquisition continued with the folder data07
  8   Thu Mar 25 13:29:22 2021 Martino TrassinelliDAQmbs acquisition restarted
TDC changed and acquisition restarted.
We have now a 2D histogram time vs energy. We should have some clues to solve the mystery.
  9   Thu Mar 25 19:20:24 2021 Martino TrassinelliGeneralSwitch to Be-like line
Tuning the beam for the Be-like U from capture in Li-like U. 
Energy setting up to 39.293 MeV/u.
  10   Thu Mar 25 23:59:46 2021 RobertRunsData run for Be-like
We started a run with cooler energy set to 21715 V, corresponding to 21515 V with space charge correction for Be-like from capture.
The acquisition started at the lmd file n. 1100.
  11   Fri Mar 26 07:26:48 2021 RobertRunstypical cycle for the be-like measurement
Attachment 1: 20210326_071721.jpg
20210326_071721.jpg
Attachment 2: 20210325_235453.jpg
20210325_235453.jpg
  12   Fri Mar 26 08:35:25 2021 Martino TrassinelliRunsEnd of the Be-like beam
Problems from the high frequency in unilac. We stoped the acquisition at 6:50 corresponding to the lmd file n. 1184.
Once the beam back in the SIS, we have a bad injection in the ESR and nobody to adjust it. Because of the plan to go to new settings in the ESR, We stop this beam period and we warm the target to be ready for the week end.
  13   Fri Mar 26 09:10:02 2021 Martino TrassinelliAnalysisLow energy Li-like beam TDC vs ADC from Ge detector
Arrival time vs energy of the Xray from the Ge detector during the beam with Li-like U at 39 MeV/u. Prompt data are visible, due to the capture.
Excitation photons are on the right part only (early arrival time). On the left, due the feature of the multi trigger and the high count rate in the particle detector, the data from capture and excitation are together.
From this figure we concluded that probably the excitation was much less effective than the capture, which was confirmed by last  night data.
Attachment 1: time_vs_energy_Li-like_beam_30MeV.png
time_vs_energy_Li-like_beam_30MeV.png
  14   Fri Mar 26 20:42:31 2021 RobertAnalysisimage of the photons from the be-run
around 16 photons in the right energy range after ~5 h of integration.
Attachment 1: Be-like_run_210325.jpg
Be-like_run_210325.jpg
  15   Tue Mar 30 11:03:17 2021 RobertRunsdata run for Li like
We startet run on Tuesday 2 am with ~4E7 decellerated ions. 
We get a count rate of ~40 cts per hour in the line.
Target density: ~1.5E12 part/cm2
  16   Tue Mar 30 11:24:51 2021 MartinoRunsTypical good cycles for He-like beam
Attachment 1: WhatsApp_Image_2021-03-30_at_11.16.25_(1).jpeg
WhatsApp_Image_2021-03-30_at_11.16.25_(1).jpeg
Attachment 2: WhatsApp_Image_2021-03-30_at_11.16.25.jpeg
WhatsApp_Image_2021-03-30_at_11.16.25.jpeg
  17   Thu Apr 1 21:24:14 2021 MartinoRunsH-like ion beam started for He-like
Starting the acquisition for the He-like U with a H-like U beam at 41.035 MEV/u
Gas jet detector: 2.38E12 part/cm2
Decelerated ions: 4.5E7 ions
Particle: about 1 MHz, saturated
Attachment 1: DSC_3217.JPG
DSC_3217.JPG
Attachment 2: DSC_3218.JPG
DSC_3218.JPG
  18   Sat Apr 3 12:01:01 2021 RobertAnalysisLine energies for Germanium detector
Attachment 1: Energies_for_Ge_detector.pdf
Energies_for_Ge_detector.pdf
  19   Sat Apr 3 12:03:57 2021 Pierre-MichelAnalysisX-ray spectrum
Live X-ray spectrum from U91+ at 41 MeV/u, accumulated within 35.6 h according to Go4.
Attachment 1: E_Cal_35deg_H-like_beam_41MeV.png
E_Cal_35deg_H-like_beam_41MeV.png
  20   Sun Apr 4 15:26:57 2021 RobertRunsstability of ion beam current during He-like run
graph starts covers the whole he-like run from Thursday evening to monday afternoon
Attachment 1: ioncurrentHe-like-run.png
ioncurrentHe-like-run.png
ELOG V3.1.5-fc6679b