HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Wed Oct 13 15:15:53 2021, Jan, DAQ, root-file header for analysis, 2021 e127b.h
Attached is the header file needed for root analysis.
Entry  Wed Oct 13 15:09:04 2021, Jan, Collaboration, K-REC cross sections A. Surzhykov, 2021 DCS_Z_52_Tp_7.049MeV_NEW.datDCS_Z_54_Tp_7.049MeV_NEW.datDCS_Z_52_Tp_6.042MeV_NEW.dat
Attached are the theory K-REC cross sections as calculated by Andrey Surzhykov (August 2021).

They are done for 118Te52+ on H2 at 7.049 and 6.042 MeV/u as well as for 124Xe54+ on H2 at 7.049 MeV/u.
Entry  Wed Jul 14 14:46:05 2021, Jan, Sophia, Detectors, collimator geometry, 2021 10x
We have measured the collimator geometry. The annotations of the variables can be found in the attached sketch  

[TABLE border="1"]
Entry  Thu Jul 8 14:07:19 2021, Jan, Calibration, beam energies, 2021 CodeCogsEqn.pngCodeCogsEqn(1).png
Table of ion energies calculated from cooler parameters

[TABLE border="1"]
Entry  Thu Jul 8 13:39:34 2021, Jan, Calibration, Electron cooler parameters, 2021 
Below are the results from the e-cooler voltage offset measurments done by Regina Hess et al. using the voltage divider (VD).

--7 MeV-- 
Entry  Thu Jun 24 09:43:01 2021, Jan Glorius, DAQ, Unpacker, 2021 
The unpacker used for the production runs of E127b is located at 
/u/litv-exp/unpacker/unpackexps/e127_TO_2021_with_ECL
Entry  Wed Jun 23 12:29:35 2021, Jan, Sophia, Calibration, Efficiency of the x-ray Detectors , 2021 Effizienz_x_ray_GEM1800_90.pngEffizienz_x_ray_GEM3000_145.pngEffizienz_x_ray_GLP_35_ohne33keV.png
For the x-ray detectors, efficiencies have been measured, before and after the experiment was performed. 
The preliminary results of the determined efficiencies can be seen in the attached plots 
Entry  Tue Jun 8 15:06:17 2021, Shahab, Analysis, Beam lifetime, 2021 pgamma_lifetime.001.pngpgamma_lifetime.002.png
measured beam lifetime after the second deceleration using parallel plate Schottky detector and the RSA5103 spectrum analyser. Analysis code can be found
here:
Entry  Wed Jun 2 09:14:04 2021, Jan, General, Telegram Chat Export, 2021 E127_TelegramChat.pdfE127_TelegramChat_json.zip
Attached is the exported Telegram chat.
There is the simple PDF and the zip-file containing the chat in json-format as well as all media files.
Entry  Mon May 31 14:38:33 2021, Sophia, Calibration, Runlist for X-ray detector calibrations after the experiment, 2021 Kopie_von_E127_Runlist-calibrations-4-3-1.xlsx
The by Jacobus Swartz created table in entry 335 extended by the calibration after the experiment.
Entry  Mon May 31 10:08:42 2021, Jan, Sophia, Runs, E127b runsheet, 2021 e127b_runsheet.ods
 
Entry  Sun May 30 14:48:09 2021, Jan, Sophia, Calibration, run0215 - crap, 2021 
 
Entry  Sun May 30 14:40:55 2021, Jan, Sophia, Detectors, real detector assignment, 2021 
************************************
GEM1800 @ 90deg (xray1) 
GLP2000 @ 35deg (xray2)
Entry  Sun May 30 14:38:09 2021, Jan Glorius, Calibration, run0216 - X-calib. 90-ba 35-pb, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 13:23:26 2021, Jan Glorius, Calibration, run0214 - X-calib. 90-ba 145-ba 35-am, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 11:32:06 2021, Jan Glorius, Calibration, run0213 - X-calib. 90-am 145-pb 35-ba, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 10:24:20 2021, Jan Glorius, Calibration, run0212 - X-calib. 90-pb 145-am, 2021 
Efficiency calibration in ESR after experiment

************************************
Entry  Sun May 30 07:26:14 2021, Oliver, Diego, Jan, Runs, Run 0211, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 06:32:43 2021, Oliver, Diego, Jan, Runs, Run 0210, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
Entry  Sun May 30 05:32:42 2021, Oliver, Diego, Runs, Run 0209, 2021 
No. of stacks: 10 00:52:43
length SC10: 2x 5.5s 
bump ge01sq2f (sc10): -20 mm 
ELOG V3.1.5-fc6679b