HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 15 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
Entry  Sun Mar 15 19:46:34 2020, Laszlo, Calibration, run042 - Xray35 calib Ba133 - high rate,  
Entry  Sun Mar 15 20:26:08 2020, Laszlo, Calibration, run043 - Xray35 calib Am241,  run043_241Am_35.png
Entry  Sun Mar 15 21:01:23 2020, Laszlo, Calibration, run044 - Xray35 calib Ba133 - a night long run ,  run044_133Ba_high_35.png
Entry  Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,  
Entry  Thu Mar 19 19:14:40 2020, Laszlo, General, primary beam measurement,  
Entry  Thu Mar 19 23:48:56 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetOFF,  IMG_20200319_232647.jpgIMG_20200319_232704.jpgIMG_20200319_234450.jpg
Entry  Fri Mar 20 01:11:58 2020, Laszlo, General, Target - beam jntersection,  IMG_20200320_011008.jpg
Entry  Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,  
Entry  Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,  
Entry  Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,  
Entry  Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,  IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg
Entry  Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,  IMG_20200320_222748.jpgIMG_20200320_223424.jpg
Entry  Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,  DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg
Entry  Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,  DSSSD_moving_vacuum_change1.JPG
Entry  Sat Mar 21 01:44:57 2020, Laszlo, General, ,  
Entry  Sat Mar 21 02:36:44 2020, Laszlo, General, detector and scraper position,  IMG_20200321_025644.jpg
Entry  Sat Mar 21 11:25:47 2020, Laszlo, , possible misalignement between target and fragment beam,  Te_measurement_after_first_night.png
Entry  Sat Mar 21 11:30:04 2020, Laszlo, General, MWPC movement,  MWPC_movement.png
Entry  Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,  
Entry  Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,  
ELOG V3.1.5-fc6679b