HOME
ESR
EXPERIMENTS
LABS etc
|
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
|
proton-capture on 118Te, Page 15 of 29 |
Not logged in |
|
|
New entries since: | Thu Jan 1 01:00:00 1970 | |
Sun Mar 15 19:46:34 2020, Laszlo, Calibration, run042 - Xray35 calib Ba133 - high rate,
|
Sun Mar 15 20:26:08 2020, Laszlo, Calibration, run043 - Xray35 calib Am241,
|
Sun Mar 15 21:01:23 2020, Laszlo, Calibration, run044 - Xray35 calib Ba133 - a night long run ,
|
Thu Mar 19 09:43:28 2020, Laszlo, General, Status of the ESR,
|
Thu Mar 19 19:14:40 2020, Laszlo, General, primary beam measurement,
|
Thu Mar 19 23:48:56 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetOFF,
|
Fri Mar 20 01:11:58 2020, Laszlo, General, Target - beam jntersection,
|
Fri Mar 20 01:21:00 2020, Laszlo, General, target is switched on event based,
|
Fri Mar 20 01:36:48 2020, Laszlo, General, 124Xe primary beam at 10Mev TargetON,
|
Fri Mar 20 16:48:00 2020, Laszlo, General, flipped Si shaper output in x and y,
|
Fri Mar 20 22:51:36 2020, Laszlo, General, Target on signal change,
|
Fri Mar 20 22:54:30 2020, Laszlo, General, First view of the beam,
|
Fri Mar 20 23:43:26 2020, Laszlo, General, Vacuum while moving in the detector at yesterday evening,
|
Sat Mar 21 01:25:07 2020, Laszlo, General, Vacuum while moving in the detector for fragment measurement,
|
Sat Mar 21 01:44:57 2020, Laszlo, General, ,
|
Sat Mar 21 02:36:44 2020, Laszlo, General, detector and scraper position,
|
Sat Mar 21 11:25:47 2020, Laszlo, , possible misalignement between target and fragment beam,
|
Sat Mar 21 11:30:04 2020, Laszlo, General, MWPC movement,
|
Sat Mar 21 12:06:50 2020, Laszlo, General, run61 - SCRAPER moved out,
|
Sat Mar 21 12:32:00 2020, Laszlo, General, Estimated target thickness,
|
|