HOME
ESR
EXPERIMENTS
LABS etc
E121
E127
E132
E125
E143
laser_cooling_2021
E142
Ê128
E146
E0052
E0018
E0028
E0038
proton-capture on 118Te, Page 16 of 29
Not logged in
Find
|
Login
|
Help
New entries since:
Thu Jan 1 01:00:00 1970
Full
| Summary |
Threaded
-- All entries --
Last day
Last 3 Days
Last week
Last month
Last 3 Months
Last 6 Months
Last Year
-- Category --
Analysis
Calibration
DAQ
General
Collaboration
Runs
Detectors
Simulations
Accelerator
572 Entries
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
27
,
28
,
29
Next
ID
Date
Author
Category
Subject
Year
Text
127
Sat Mar 21 13:24:10 2020
Laszlo
Runs
run entry - run063
open file : run063
beam: 118Te52+
128
Sat Mar 21 13:37:53 2020
Laszlo
MCP can monitor target
now with the MCP we can see clearly the effect
of the target :) (scintillation?)
so we want to scan through the target thickness
130
Sat Mar 21 14:52:05 2020
Laszlo
General
target optimization
previous position of the beam at target was
-3mm (for the night position)
max. intensity position of the beam at target
133
Sat Mar 21 15:26:49 2020
Laszlo
General
SCRAPER is ON use again
Yuri puts back the scraper (Egelhof 1 - GE01DD1IG)
into position = +19. (where it was in the
evening)
135
Sat Mar 21 17:21:57 2020
Laszlo
General
new Target density
Ulli and Nikos managed to set the target density
to ~7E13 at 51K temperature
151
Sat Mar 21 23:07:00 2020
Laszlo
General
1672. MCP file was (recoils) was not closed
1672. MCP file was (recoils) was not closed
when we refilled the Xrays and did the cable
change of 90 and 145 xrays
186
Sun Mar 22 12:53:43 2020
Laszlo
General
quick summary for the 118Te overnight measurement
Quoting Yury:
"The count rate is very low. We estimate
that we store about 10^4 118Te particles
188
Sun Mar 22 13:33:19 2020
Laszlo
General
2nd storage of MCP data
I made a backup for the MCP data on my own
GSI laptop. Looking for better solution...
the original "fresh" files stored at litv-exp@lxg1299:/data.local2/hillenbrand/Laszlo/
191
Sun Mar 22 14:58:59 2020
Laszlo
General
dropping density of Gasjet
after like 20min run, the density of the gasjet
already dropped from 10^14 to 8.7*10^13.
Now it seems to remain in that value
198
Sun Mar 22 17:45:07 2020
Laszlo
General
switching to primary beam
We have finished the measurement with the
fragments.
199
Sun Mar 22 17:47:27 2020
Laszlo
Si, Xrays target density spectra during 118Te afternoon measurement
We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
201
Sun Mar 22 18:35:43 2020
Laszlo
target dropped aagain
there was a drop again from 8.6e13 to 7e13
in the target density
203
Sun Mar 22 19:15:03 2020
Laszlo
Si moved out of the ring, high voltage is switched off
210
Mon Mar 23 00:13:25 2020
Laszlo
General
SIS and ESR beam currents
227
Mon Mar 23 07:56:51 2020
Laszlo
General
Yuri made magick and we operate again
DSSSD was moved out (HV switched off)
also the scraper was mistakenly moved.
232
Mon Mar 23 09:33:11 2020
Laszlo
General
SIS failure again!
run096 is stopped
233
Mon Mar 23 09:47:05 2020
Laszlo
General
explanation of an ESR cycle
234
Mon Mar 23 10:06:12 2020
Laszlo
Runs
run entry - run097
this one is garbage
239
Mon Mar 23 11:32:42 2020
Laszlo
General
SIS went down again
run101 is stopped
253
Mon Mar 23 15:48:15 2020
Laszlo
Calibration
run105 - Xray90 calib Am241, distance 167.5mm, wrong?
Detector: 90
Source: Am241
Distance: 167.5mm
Goto page
Previous
1
,
2
,
3
...
15
, 16,
17
...
27
,
28
,
29
Next
ELOG V3.1.5-fc6679b