  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 Taking data again with primary beam.

open file : run092
  
  213   Mon Mar 23 01:17:26 2020 ShahabGeneralLife time measurements using Schottky Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ
  
  212   Mon Mar 23 00:39:52 2020 ShahabGeneralRamping cycle picture and data Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
 Stored as XLS file.
 2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx 
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run091
  
  210   Mon Mar 23 00:13:25 2020 LaszloGeneralSIS and ESR beam currents    2020-03-23_00-09-48-737.png2020-03-23_00-21-43-581.png 
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run090
  
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings    ESR_Vakuum2020-03-22-2318.PNG 
  207   Sun Mar 22 22:46:56 2020 Michael, Laszlo, YuriRunsrun entry - run090 Taking data again with primary beam.

open file : run090
  
  206   Sun Mar 22 22:06:21 2020 Michael, Laszlo, YuriRunsrun entry - run089 - stopped closed file again.

Yuri is still tuning, but we are collecting
  
  205   Sun Mar 22 22:00:49 2020 Michael, Laszlo, YuriRunsrun entry - run089 - switched to Primary beam Yuri is still tuning, but we are collecting
data. Beam is in. Detectors are out.
  
  204   Sun Mar 22 19:49:12 2020 Michael, Laszlo, Yuri Yuri is still tuning FRS We filled the Xray detectors.
Yuri is sill tuning FRS for primary beam.
  
  203   Sun Mar 22 19:15:03 2020 Laszlo Si moved out of the ring, high voltage is switched off     
  202   Sun Mar 22 18:41:50 2020 Michael, LaszloRunsrun entry - run088 Closed file run088 at 17:55. No beam in ESR.   
  201   Sun Mar 22 18:35:43 2020 Laszlo target dropped aagain there was a drop again from 8.6e13 to 7e13
in the target density
 target_density_after_118Te_afternoon_runs.png 
  200   Sun Mar 22 17:49:28 2020 Michael, LaszloRunsrun entry - run088 The beam is still unchanged. We just start
a run to collect all remaining data.
Data is probably scratch, expect changing
 Trafo_run88.png 
  199   Sun Mar 22 17:47:27 2020 Laszlo Si, Xrays target density spectra during 118Te afternoon measurement We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
 End_of_118Te_runs.pngtarget_density_during_118Te_afternoon_runs.png 
  198   Sun Mar 22 17:45:07 2020 LaszloGeneralswitching to primary beam We have finished the measurement with the
fragments.
  
  197   Sun Mar 22 17:35:39 2020 MichaelRunsrun entry - run087.  Closing file at 17:39, stopping data taking.
Yuri will switch to primary beam through
FRS without target.
  
  196   Sun Mar 22 17:09:49 2020 MichaelRunsrun entry - run087 open file : run087

beam: 118Te52+
  
  195   Sun Mar 22 16:39:37 2020 MichaelRunsrun entry - run087 Four shots at the end of 086/beginning of
87 were empty, no SIS kicker. Beam operators
fixed it quickly.
  