HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018
  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
ID Date Author Category Subject Yearup Text Attachments
  1   Thu Sep 13 11:42:33 2018 Jan GloriusCollaborationProposal Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017.    
 E127_Reifarth_pg.pdfE127_Approval.pdf 
  2   Thu Jan 17 08:45:43 2019 JanDetectorsMicron W1 DSSSD - technical information Attached are the spec sheets and design drawings
of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo
 6x 
  3   Wed Feb 6 10:04:23 2019 Laszlo VargaSimulationsBackground subtraction for 124Xe, 109In, 73As made by MOCADI General remarks to the MOCADI simulations:


scraper size vertically > (p,g) spot at the
scraping position --> (p,g) can be separated
 template.pdf 
  4   Wed Feb 6 10:16:09 2019 Laszlo VargaGeneralStudy on scraping A publication on scraping systems suggested
by Siegbert. 
In the study they have used cylindrical "high-quality"
 1-s2.0-0168583X88900122-main.pdf 
  5   Fri Apr 5 05:46:20 2019 JanDAQrunning DRASI for (p,g) We now have a drasi DAQ running for our (p,g)
experiments.
The RIO we have it installed right now is:
  
  6   Fri Apr 5 06:05:55 2019 JanDAQmaking changes to the DAQ  If you need to add or change a module of the
VME crate you need to follow this proceedure:
  
  7   Wed Jun 5 11:29:13 2019 JanDetectorsposition/channel calib. This is the first position calibration done
with the detector installed in the holder.
The goal is to assign rough positions (top/bottom/left/right)
  
  8   Fri Jun 7 10:18:23 2019 JanRunsprerun001 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun001-root

~2h run
 alpha_centered.jpg 
  9   Fri Jun 7 13:52:32 2019 JanRunsprerun002 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun002

~20min run
 alpha_top_left.jpg 
  10   Fri Jun 7 14:28:09 2019 JanRunsprerun003 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun003

~20min run
 alpha_bottom_right.jpg 
  11   Fri Jun 7 14:39:36 2019 JanDetectorsPt100 installation & readout The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires.
 det_connector.pngPt100_readout.JPG 
  12   Fri Jun 7 15:57:41 2019 JanDAQDAQ with & without MDPP-16 The DAQ located in 

../esrdaq_2018/r4l-58/ 
  
  13   Tue Jun 11 10:13:56 2019 JanRunsprerun003 - MixedAlpha save point: lxg1275:/datalocal1/e127/predata/prerun004
~10min run
  
  14   Tue Jun 25 21:19:50 2019 LaszloSimulationsMOCADI input parameters initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in
 template.pdfsteck2004.pdf 
  Draft   Fri Jun 28 14:06:28 2019 JanGeneralCAD of (p,g) setup     
  16   Mon Jul 8 14:57:07 2019 Yuanming XingDetectorsThe measurement of the tilting angle As shown in the figure, the detector is tilted
by a certain angle which is about 45 degree.
 TiltingAngle.png 
  17   Tue Jul 9 15:26:59 2019 Yuanming XingSimulationsSimulated Rutherford scattering distribution on detector Simulated Rutherford scattering distribution
on detector
 6MeV.png7MeV.png8MeV.png 
  18   Tue Jul 23 10:46:29 2019 LaszloAnalysis124Xe pg peak fit using mixed cascade simulation This entry is the continuation of the cascade
effects on the pg peak shape entry:
 7x 
  Draft   Fri Aug 9 13:14:09 2019 Laszlo pn channel simulations for 111Sn(p,g)112Sb experiment The p,n channel opening for the 111Sn+p reaction
is at 5.8895 MeV/u beam energy. Therefore,
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam
  
  20   Fri Aug 9 13:43:15 2019 LaszloSimulationspn channel simulations for 111Sn(p,g)112Sb experiment The p,n channel opening for 111Sn beam is
at 5.8895 MeV/u beam energy. Therefore, when
choosing 6MeV/u, 7MeV/u,
 12x 
ELOG V3.1.5-fc6679b