  proton-capture on 118Te, Page 1 of 29  Not logged in ELOG logo
ID Date Author Categoryup Subject Year Text Attachments
  Draft   Fri Aug 9 13:14:09 2019 Laszlo pn channel simulations for 111Sn(p,g)112Sb experiment The p,n channel opening for the 111Sn+p reaction
is at 5.8895 MeV/u beam energy. Therefore,
when choosing as 6MeV/u, 7MeV/u, 8MeV/u beam
  
  118   Sat Mar 21 11:25:47 2020 Laszlo possible misalignement between target and fragment beam after 9hours of measurement we see only 19
counts on our targetON silicon detector histo.
this low count rate can indicate two scenarios:
 Te_measurement_after_first_night.png 
  128   Sat Mar 21 13:37:53 2020 Laszlo MCP can monitor target now with the MCP we can see clearly the effect
of the target :) (scintillation?)
so we want to scan through the target thickness
  
  199   Sun Mar 22 17:47:27 2020 Laszlo Si, Xrays target density spectra during 118Te afternoon measurement We got 30 counts out of this afternoon 118Te
run on our Si TargetON histo.
That 1 count at bin (6,10) I dont understand.
 End_of_118Te_runs.pngtarget_density_during_118Te_afternoon_runs.png 
  201   Sun Mar 22 18:35:43 2020 Laszlo target dropped aagain there was a drop again from 8.6e13 to 7e13
in the target density
 target_density_after_118Te_afternoon_runs.png 
  203   Sun Mar 22 19:15:03 2020 Laszlo Si moved out of the ring, high voltage is switched off     
  204   Sun Mar 22 19:49:12 2020 Michael, Laszlo, Yuri Yuri is still tuning FRS We filled the Xray detectors.
Yuri is sill tuning FRS for primary beam.
  
  361   Fri May 21 10:00:51 2021 JanAcceleratortarget bump2021The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
  
  413   Mon May 24 05:20:36 2021 Helmut, Yuri, Faraz, SergeyAcceleratorFRS setup2021Logbook from start of FRS until 118Te injection  14x 
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
  448   Tue May 25 15:56:48 2021 Robert/ShahabAcceleratorTrafo2021Trafo was set to 0   
  449   Tue May 25 17:12:59 2021 Robert/ShahabAcceleratorBeam2021Beam is back; It is now being optimized   
  450   Tue May 25 18:46:04 2021 Robert/ShahabAcceleratorQuadrupoles down2021All quadrupoles went off, waiting for the
on-call service
  
  496   Thu May 27 13:26:35 2021 JanAcceleratorFRS degrader failure2021Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
  
  497   Thu May 27 13:48:18 2021 Helmut WeickAcceleratorFRS wrong status display for one day2021By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
 drivestat-log.JPG 
  18   Tue Jul 23 10:46:29 2019 LaszloAnalysis124Xe pg peak fit using mixed cascade simulation This entry is the continuation of the cascade
effects on the pg peak shape entry:
 7x 
  22   Wed Sep 25 13:03:46 2019 LaszloAnalysissimulations on 118Te+p I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
 11x 
  83   Fri Mar 20 13:21:33 2020 Jan, LaszloAnalysis124Xe data of first night The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
 90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png 
  153   Sat Mar 21 23:19:14 2020 JanAnalysis118Te52+ on H2-target - Xray spectrum 90 degree The attached spectrum is for the 90 degree
X-ray detector taken for about 3 hours with
118Te52+.
 90_deg_118Te_runs64to66.png 
  159   Sun Mar 22 01:36:14 2020 Pierre-MichelAnalysisTarget overlap Here are the data file for the rates of the
recoil detector for different values of the
target bump. The average rate over background
 10x 