ID |
Date |
Author |
Category |
Subject |
Year |
Text |
|
219
|
Mon Mar 23 03:53:41 2020 |
Shahab | Runs | Reduced intensity inspite of faulty kicker | | SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on |
|
138
|
Sat Mar 21 17:34:10 2020 |
Sergiy | General | Recoils | |
We started recording the data from the recoils
using the MCP from Pierre-Michael's experiment. |
|
129
|
Sat Mar 21 13:44:16 2020 |
Pierre-Michel | Detectors | Recoil detector | | We turn on Recoil detector, to use it as a
monitor for target overlap.
|
|
212
|
Mon Mar 23 00:39:52 2020 |
Shahab | General | Ramping cycle picture and data | | Complete ramping cycle recorded from Oscilloscope
Tektronix MSOX2024A.
Stored as XLS file. |
|
450
|
Tue May 25 18:46:04 2021 |
Robert/Shahab | Accelerator | Quadrupoles down | 2021 | All quadrupoles went off, waiting for the
on-call service |
|
11
|
Fri Jun 7 14:39:36 2019 |
Jan | Detectors | Pt100 installation & readout | | The new detector holder incorporates a Pt100
temperature sensor, which is UHV compatible.
The Pt-resistor is read out via 4 wires. |
|
1
|
Thu Sep 13 11:42:33 2018 |
Jan Glorius | Collaboration | Proposal | | Attached is the beam time proposal submitted
and accepted by the G-PAC in 2017. |
|
224
|
Mon Mar 23 06:20:06 2020 |
Shahab | Runs | Position on scintillator corrected sitll no beam in ESR | | position on the scintillator was corrected
by the OPs to center, but beam is still not
in ESR. |
|
265
|
Tue Mar 24 10:20:26 2020 |
Laszlo | Calibration | Pictures of the xray calibration | | |
|
474
|
Wed May 26 18:37:34 2021 |
Ragan, Thanassis | General | Optimization target bump/overlapp | 2021 | | bump position | X ray bdt ON | Si rate ON
|
---------------------------------------------
|
|
490
|
Thu May 27 08:26:15 2021 |
Yuri, Beatriz | General | Optimisation beam position on target and scraper position | 2021 | Optimised overlap with the target by shifting
the beam from -11.5 to 12.8 mm. This lead
to an increase of the DSSSD rate of a factor |
|
447
|
Tue May 25 13:49:51 2021 |
Oliver, Diego, Jan | General | No Beam | 2021 | No beam from 13:49:00 until |
|
552
|
Sat May 29 23:05:52 2021 |
Oliver, Diego | General | No Beam | 2021 | Due to a radioprotection issue in CaveA there
is no beam. We wait for the radioprotection
shift to arrive...
|
|
414
|
Mon May 24 06:30:42 2021 |
Ragan | DAQ | NTCAP | 2021 | NTCAP started for recording Schottky data
SC_2021-05-24_06-29-31
|
|
2
|
Thu Jan 17 08:45:43 2019 |
Jan | Detectors | Micron W1 DSSSD - technical information | | Attached are the spec sheets and design drawings
of the new DSSSDs from Micron.
Additionally, the 3D model made by Laszlo |
6x |
119
|
Sat Mar 21 11:30:04 2020 |
Laszlo | General | MWPC movement | | now we try to move the capture detector (MWPC
in the 1. dipol before our Si setup) inside
the ring while the DAQ was ON
|
|
14
|
Tue Jun 25 21:19:50 2019 |
Laszlo | Simulations | MOCADI input parameters | | initial BEAM input parameters for MOCADI are
based on:
- https://web-docs.gsi.de/~weick/mocadi/download/esr-exl-test.in |
|
128
|
Sat Mar 21 13:37:53 2020 |
Laszlo | | MCP can monitor target | | now with the MCP we can see clearly the effect
of the target :) (scintillation?)
so we want to scan through the target thickness |
|
452
|
Tue May 25 22:03:22 2021 |
Robert/Shahab | Runs | Lifetime measurement | 2021 | Run 0118
Gas jet target has been turned off for lifetime |
|
185
|
Sun Mar 22 12:50:00 2020 |
Shahab | Runs | Life time of 10 MeV/u Tail of 118-Te-52+ | | The life time of 10 MeV/u Tail of cycle 118-Te-52+
was analyzed using Schottky peak intensity.
Schottky signal was taken from the parallel |
|