213
|
Mon Mar 23 01:17:26 2020 |
Shahab | General | Life time measurements using Schottky | | Did Schottky measurements using 5 shots with
and without gas target each
restarting the DAQ |
|
222
|
Mon Mar 23 05:55:24 2020 |
Shahab | Runs | Kicker problem not solved yet | | no solution to kicker problem. |
|
220
|
Mon Mar 23 03:58:25 2020 |
Shahab | General | Kicker guy arrived | | Kicker Guy (U. Blell) arrived in order to
fix modules. |
|
578
|
Wed Oct 13 15:09:04 2021 |
Jan | Collaboration | K-REC cross sections A. Surzhykov | 2021 | Attached are the theory K-REC cross sections
as calculated by Andrey Surzhykov (August
2021).
|
|
351
|
Wed May 19 13:47:26 2021 |
Jan Glorius | General | GasTarget Operation | 2021 | We have two tasks to take over for the target
operation:
|
|
23
|
Wed Sep 25 13:58:24 2019 |
Laszlo | General | Gamow window energies for 118Te(p,g) | | # Z A Iso Re Rc T9 upper width mxpos
shift
52 118 te118 pg 20 0.5 1.39 0.58 1.06 |
|
59
|
Mon Mar 16 15:15:22 2020 |
Jan | Calibration | Gamma- and X-ray intensities for efficiency calib | | Intensities for special gamma or x-ray lines
needed for efficiency calibration can be
found here:
|
|
90
|
Fri Mar 20 22:54:30 2020 |
Laszlo | General | First view of the beam | | Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible.
However we could.catch it somehow with Shottky |
|
497
|
Thu May 27 13:48:18 2021 |
Helmut Weick | Accelerator | FRS wrong status display for one day | 2021 | By checking the log files we realized that
from yesterday 26.05. 13:44 - today 13:05
the FRS degrader was shown as out.
|
|
424
|
Mon May 24 17:48:04 2021 |
Erika | General | FRS shiftplan, name abbreviations and phone list | 2021 | FRS shift plan for this week:
[img]elog:424/1[/img]
|
|
413
|
Mon May 24 05:20:36 2021 |
Helmut, Yuri, Faraz, Sergey | Accelerator | FRS setup | 2021 | Logbook from start of FRS until 118Te injection |
14x |
352
|
Wed May 19 15:09:22 2021 |
Helmut Weick | General | FRS settings, LISE file | 2021 | Here is a setting plan for FRS and corresponding
LISE files.
2 LISE files still use the old FRS-ESR optics, |
|
496
|
Thu May 27 13:26:35 2021 |
Jan | Accelerator | FRS degrader failure | 2021 | Maybe, our degrader in FRS was removed by
hand at (~13:40 26/05/21)
It is put back now (~13:10 27/05/21)
|
|
125
|
Sat Mar 21 12:32:00 2020 |
Laszlo | General | Estimated target thickness | | Target thickness must be like 5mm (was measured
with a moving thin wire)
The beam thickness is small because of the |
|
126
|
Sat Mar 21 12:42:21 2020 |
Ragan | General | Entry to ESR for MCP detector | | Pierre Michel and Laszlo go inside the ESR
for switching on the MCP detector so that
the photons from the gas jet and secondary |
|
215
|
Mon Mar 23 01:53:59 2020 |
Shahab | Runs | Empty shots in ESR | | since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
|
|
575
|
Thu Jul 8 13:39:34 2021 |
Jan | Calibration | Electron cooler parameters | 2021 | Below are the results from the e-cooler voltage
offset measurments done by Regina Hess et
al. using the voltage divider (VD).
|
|
573
|
Wed Jun 23 12:29:35 2021 |
Jan, Sophia | Calibration | Efficiency of the x-ray Detectors | 2021 | For the x-ray detectors, efficiencies have
been measured, before and after the experiment
was performed.
|
|
438
|
Tue May 25 07:51:48 2021 |
Jan | Accelerator | ESR stacking cycle length | 2021 | The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
|
|
226
|
Mon Mar 23 06:49:46 2020 |
Shahab | Runs | ESR kicker also has some problems | | |
|