HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 27 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectdown Year Text Attachments
  208   Sun Mar 22 23:19:23 2020 MichaelGeneralESR Vacuum readings    ESR_Vakuum2020-03-22-2318.PNG 
  569   Mon May 31 10:08:42 2021 Jan, SophiaRunsE127b runsheet2021   e127b_runsheet.ods 
  249   Mon Mar 23 14:12:54 2020 RaganRunsE127 experiment stops close file : run104 (14:12:44)
E127 experiment finishes on a successful
note )) Congratulations to the entire team
  
  282   Tue May 19 16:48:15 2020 LaszloGeneralE127 beamtime overview Here is a representation how was the time
management during E127. The time, what we
could spend with measuring the 118Te(pg),
 E127_beamtime_overview.pngE127_beamtime_overview.pdf 
  29   Fri Nov 15 10:46:12 2019 LaszloDetectorsDetector movement from HKR To move the detector remotely from the HKR:
-go to a desktop of a HKR computer
-right click: "App Launcher PRO"
 IMG_20191114_135600.jpg 
  106   Sat Mar 21 06:02:22 2020 Tino, OliverGeneralDetector filling Run stopped for detector fillings   
  478   Wed May 26 20:34:50 2021 Ragan, ThanassisDetectorsDetector filling2021Jan is filling the detector after run0137.   
  37   Tue Mar 10 08:52:34 2020 JanDetectorsDSSSD positioning To find a good Si position, we need to follow
a procedure similar to this:
 optimum_detector_position_2.jpg 
  387   Sat May 22 16:28:10 2021 LaszloGeneralDSSSD movement2021The DSSSD is moved back to its measurement
position(-25mm).
  
  283   Fri Jun 5 14:06:15 2020 LaszloDetectorsDSSSD and SCRAPER position estimate for Xe and Te experiments2020We don't know the exact absolute positions
of the detector (+scraper) and the beam.
However, what we have to know is only these
 SP54120060514100.pdfDSSSD_new1.pdfIMG_20200321_025644.jpg 
  28   Wed Nov 6 14:13:53 2019 Jan, LaszloDetectorsDSSSD - 1st movement - realignment We moved the new detector installation for
the first time slowly into the dipole chamber.
The alignement seems to be pefect, no distortion
  
  287   Tue Feb 2 13:59:00 2021 JanDetectorsDSSD installation and alignment2021The DSSD has been exchanged and aligned in

November 2020. After bakeout at 140°C 
  
  286   Tue Nov 24 15:35:49 2020 JanCalibrationDSSD X/Y channel mapping2021During the detector test [URL=https://elog.gsi.de/esr/E127/284]test
measurements[/URL] with alpha source the
allocation of the 16 X- and 16 Y-channels
  
  386   Sat May 22 14:53:34 2021 Beatriz et al.GeneralDSSD Movement2021DSSSD moved to the most in position in order
to try to scrape the beam with the scraper.
  
  12   Fri Jun 7 15:57:41 2019 JanDAQDAQ with & without MDPP-16 The DAQ located in 

../esrdaq_2018/r4l-58/ 
  
  26   Wed Oct 23 15:35:29 2019 JanDAQDAQ with & without MDPP-16 the DAQ located in
../esrdaq_2018/r4l-58_dev/
  
  71   Fri Mar 20 04:29:45 2020 JanDAQDAQ settings for the first night    e127.trlomain.cfgr3bfuser.cfgsetting.1584673412 
  39   Wed Mar 11 09:08:21 2020 JanDAQDAQ & controls - OVERVIEW For all DAQ & slow control buissines the user

[COLOR=red][SIZE=3]litv-exp[/SIZE][/COLOR]
  
  273   Wed Apr 8 20:06:10 2020 LaszloCalibrationCounts in the K-REC peaks 3 datasets were investigated:
-124Xe with Scraper    (2. Xray calibration
parameters needed)
 124Xe_wScraper_full_spectra_labels_thick.png124Xe_wScraper_90_backgnd.pngKREC-pics.zip 
  475   Wed May 26 19:08:17 2021 Ragan, ThanassisGeneralCooler down2021We stopped data taking as the electron cooler
is down.
  
ELOG V3.1.5-fc6679b