HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 25 of 29  Not logged in ELOG logo
ID Datedown Author Category Subject Year Text Attachments
  93   Sat Mar 21 01:44:57 2020 LaszloGeneral  from the SIS side they could optimize the
intensity. we gained a factor ~3. Now the
SIS intensity is at 
  
  92   Sat Mar 21 01:25:07 2020 LaszloGeneralVacuum while moving in the detector for fragment measurement Stayed below E-10
Start:2.42E-11
Top after moving: 4.144E-11
 DSSSD_moving_vacuum_change1.JPG 
  91   Fri Mar 20 23:43:26 2020 LaszloGeneralVacuum while moving in the detector at yesterday evening Vacuum before DSSSD movement: 1.5844E-11
Top value after movement: 3.64378E-11
 DSSSD_moving_vacuum_change.JPGIMG_20200320_021131.jpg 
  90   Fri Mar 20 22:54:30 2020 LaszloGeneralFirst view of the beam Intensity from Sis 1.7E9
The intensity is too.low at ESR to be visible.
However we could.catch it somehow with Shottky
 IMG_20200320_222748.jpgIMG_20200320_223424.jpg 
  89   Fri Mar 20 22:51:36 2020 LaszloGeneralTarget on signal change From the previous settings:
JetOn
  mashine number 11
 IMG_20200320_223918.jpgIMG_20200320_224306.jpgIMG_20200320_224614.jpg 
  88   Fri Mar 20 22:26:42 2020 JanDetectorsBaF2 deactivated BaF2 detectors are deactivated nor for the
following runs.
  
  87   Fri Mar 20 19:37:43 2020 JanCalibrationXray energies - rough 1. calibration  -- E calibration seems to have changed! ---

This calibration is based on the source data
  
  86   Fri Mar 20 16:58:02 2020 JanDAQXray2 & Xray3 cabling We found that Xray2 and Xray3 the cabling
is not consistent:
  
  85   Fri Mar 20 16:54:53 2020 JanDAQBaF OFF downscaled red=32 I introduced a downscaling by a factor of
2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable
  
  84   Fri Mar 20 16:48:00 2020 LaszloGeneralflipped Si shaper output in x and y Yesterday evening we have found out that the
energy signals from the silicon are negative
--> wrong polarity of the shapers was chosen
  
  83   Fri Mar 20 13:21:33 2020 Jan, LaszloAnalysis124Xe data of first night The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
 90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png 
  82   Fri Mar 20 11:00:25 2020 Ragan, RuiJiuRunsrun entry - run050 Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
 IMG_20200320_111413.jpg 
  81   Fri Mar 20 10:28:31 2020 Ragan, RuiJiuRunsrun entry - run050 Beam is back at 10:27 am.
Open file: runstart050
  
  80   Fri Mar 20 08:30:52 2020 Ragan, RuiJiuRunsrun entry - run049 There is no beam due to water leakage in the
transfer channel of SIS.
  
  79   Fri Mar 20 08:01:40 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  78   Fri Mar 20 07:30:16 2020 Ragan, RuiJiuRunsrun entry - run049 beam: 124Xe54+
energy: 10 MeV/u
  
  77   Fri Mar 20 07:01:06 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  76   Fri Mar 20 06:34:40 2020 ShahabRunsrun entry - run048 beam: 124Xe54+
energy: 10 MeV/u
  
  75   Fri Mar 20 06:00:26 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
  74   Fri Mar 20 05:32:44 2020 ShahabRunsrun entry - run047 beam: 124Xe54+
energy: 10 MeV/u
  
ELOG V3.1.5-fc6679b