Wed May 26 15:30:03 2021 |
Ragan, Thanassis | General | Changing the beam energy | 2021 | The ESR team is changing the beam energy to
6 MeV/u. |
|
316
|
Thu May 6 11:03:46 2021 |
Jan Glorius | DAQ | Cabling Documentation | 2021 | |
 |
346
|
Sun May 16 13:31:49 2021 |
Laszlo | DAQ | Cabling Documentation | 2021 | Si HV and current was switched in the last
documentation. |
|
Draft
|
Fri Jun 28 14:06:28 2019 |
Jan | General | CAD of (p,g) setup | | |
|
350
|
Tue May 18 21:08:16 2021 |
ESR team | General | Beam stacking | 2021 | Beam stacking. 3 pulses, stochastically cooled
and stacked on an inner orbit |
 |
572
|
Tue Jun 8 15:06:17 2021 |
Shahab | Analysis | Beam lifetime | 2021 | measured beam lifetime after the second deceleration
using parallel plate Schottky detector and
the RSA5103 spectrum analyser. Analysis code |
 |
353
|
Wed May 19 19:47:14 2021 |
Yuri | General | Beam Halflife at 30 AMeV | 2021 | |
|
449
|
Tue May 25 17:12:59 2021 |
Robert/Shahab | Accelerator | Beam | 2021 | Beam is back; It is now being optimized |
|
250
|
Mon Mar 23 14:23:01 2020 |
Pierre-Michel | DAQ | Backup recoil files | | Recoil detector files backup to lxg1260:/data.local2/hillenbrand/Laszlo |
|
3
|
Wed Feb 6 10:04:23 2019 |
Laszlo Varga | Simulations | Background subtraction for 124Xe, 109In, 73As made by MOCADI | | General remarks to the MOCADI simulations:
scraper size vertically > (p,g) spot at the
scraping position --> (p,g) can be separated |
|
88
|
Fri Mar 20 22:26:42 2020 |
Jan | Detectors | BaF2 deactivated | | BaF2 detectors are deactivated nor for the
following runs. |
|
32
|
Tue Feb 11 13:20:01 2020 |
Jan | Detectors | BaF2 - HV settings | | with these HV values the 6 channels are roughly
gain matched, such that the 7.83 MeV Po-decay
is around channel 5000. |
 |
85
|
Fri Mar 20 16:54:53 2020 |
Jan | DAQ | BaF OFF downscaled red=32 | | I introduced a downscaling by a factor of
2^5=32 for the BaF2 during target OFF.
The reason is, that we get a lot reasonable |
|
288
|
Wed Mar 31 13:52:04 2021 |
Jan | Detectors | BaF Na22 Testing | 2021 | On 30. and 31.03.2021 we did some testing
with the 6 BaF detectors.
|
|
289
|
Wed Mar 31 13:57:27 2021 |
Jan | Detectors | BaF HV settings | 2021 | The setting below is a start value for final
gain matching with a full ADC range of 12MeV:
|
|
290
|
Wed Apr 14 09:42:50 2021 |
Jan | Detectors | BaF HV gain matching | 2021 | The preliminary gain matching settings for
a full ADC range of ~12MeV:
|
 |
521
|
Fri May 28 14:14:31 2021 |
Laszlo | General | Alvarez failure at 10:30 28:05:2021 | 2021 | |
|
411
|
Sun May 23 15:36:10 2021 |
Rui-Jiu Chen& Alex | General | All shifts until Monday morning (24th May) have been cancelled. | 2021 | All shifts until Monday morning (24th May)
have been cancelled.
Next update on further situation (in particular |
|
188
|
Sun Mar 22 13:33:19 2020 |
Laszlo | General | 2nd storage of MCP data | | I made a backup for the MCP data on my own
GSI laptop. Looking for better solution...
the original "fresh" files stored at litv-exp@lxg1299:/data.local2/hillenbrand/Laszlo/ |
|
271
|
Mon Apr 6 04:39:19 2020 |
Laszlo | Calibration | 2. Xray energy calibration | | 30angle: E[keV] = 0.015898 *ch-1.91
90angle: E[keV] = 0.0211075*ch-2.39
145angle: E[keV] = 0.01663 *ch-1.758 |
9x |