| ID | 
Date | 
Author | 
Category | 
Subject  | 
Year | 
Text | 
  | 
| 
  208  
 | 
Sun Mar 22 23:19:23 2020 | 
Michael | General | ESR Vacuum readings |   |   | 
    | 
| 
  569  
 | 
Mon May 31 10:08:42 2021 | 
Jan, Sophia | Runs | E127b runsheet | 2021 |   | 
    | 
| 
  249  
 | 
Mon Mar 23 14:12:54 2020 | 
Ragan | Runs | E127 experiment stops |   | close file : run104 (14:12:44)
 
E127 experiment finishes on a successful 
note )) Congratulations to the entire team | 
   | 
| 
  282  
 | 
Tue May 19 16:48:15 2020 | 
Laszlo | General | E127 beamtime overview |   | Here is a representation how was the time 
management during E127. The time, what we 
could spend with measuring the 118Te(pg), | 
     | 
| 
  29  
 | 
Fri Nov 15 10:46:12 2019 | 
Laszlo | Detectors | Detector movement from HKR |   | To move the detector remotely from the HKR:
 
-go to a desktop of a HKR computer
 
-right click: "App Launcher PRO"
 | 
    | 
| 
  106  
 | 
Sat Mar 21 06:02:22 2020 | 
Tino, Oliver | General | Detector filling |   | Run stopped for detector fillings | 
   | 
| 
  478  
 | 
Wed May 26 20:34:50 2021 | 
Ragan, Thanassis | Detectors | Detector filling | 2021 | Jan is filling the detector after run0137. | 
   | 
| 
  37  
 | 
Tue Mar 10 08:52:34 2020 | 
Jan | Detectors | DSSSD positioning |   | To find a good Si position, we need to follow 
a procedure similar to this:
 
 | 
    | 
| 
  387  
 | 
Sat May 22 16:28:10 2021 | 
Laszlo | General | DSSSD movement | 2021 | The DSSSD is moved back to its measurement 
position(-25mm). | 
   | 
| 
  283  
 | 
Fri Jun  5 14:06:15 2020 | 
Laszlo | Detectors | DSSSD and SCRAPER position estimate for Xe and Te experiments | 2020 | We don't know the exact absolute positions 
of the detector (+scraper) and the beam. 
However, what we have to know is only these | 
      | 
| 
  28  
 | 
Wed Nov  6 14:13:53 2019 | 
Jan, Laszlo | Detectors | DSSSD - 1st movement - realignment |   | We moved the new detector installation for 
the first time slowly into the dipole chamber.
 
The alignement seems to be pefect, no distortion | 
   | 
| 
  287  
 | 
Tue Feb  2 13:59:00 2021 | 
Jan | Detectors | DSSD installation and alignment | 2021 | The DSSD has been exchanged and aligned in 
 
November 2020. After bakeout at 140°C 
 | 
   | 
| 
  286  
 | 
Tue Nov 24 15:35:49 2020 | 
Jan | Calibration | DSSD X/Y channel mapping | 2021 | During the detector test [URL=https://elog.gsi.de/esr/E127/284]test 
measurements[/URL] with alpha source the 
allocation of the 16 X- and 16 Y-channels | 
   | 
| 
  386  
 | 
Sat May 22 14:53:34 2021 | 
Beatriz et al. | General | DSSD Movement | 2021 | DSSSD moved to the most in position in order 
to try to scrape the beam with the scraper. | 
   | 
| 
  12  
 | 
Fri Jun  7 15:57:41 2019 | 
Jan | DAQ | DAQ with & without MDPP-16 |   | The DAQ located in 
 
 
../esrdaq_2018/r4l-58/ 
 | 
   | 
| 
  26  
 | 
Wed Oct 23 15:35:29 2019 | 
Jan | DAQ | DAQ with & without MDPP-16 |   | the DAQ located in
 
../esrdaq_2018/r4l-58_dev/
 
 | 
   | 
| 
  71  
 | 
Fri Mar 20 04:29:45 2020 | 
Jan | DAQ | DAQ settings for the first night |   |   | 
       | 
| 
  39  
 | 
Wed Mar 11 09:08:21 2020 | 
Jan | DAQ | DAQ & controls - OVERVIEW |   | For all DAQ & slow control buissines the user 
 
[COLOR=red][SIZE=3]litv-exp[/SIZE][/COLOR]
 | 
   | 
| 
  273  
 | 
Wed Apr  8 20:06:10 2020 | 
Laszlo | Calibration | Counts in the K-REC peaks |   | 3 datasets were investigated:
 
-124Xe with Scraper    (2. Xray calibration 
parameters needed)
 | 
      | 
| 
  475  
 | 
Wed May 26 19:08:17 2021 | 
Ragan, Thanassis | General | Cooler down | 2021 | We stopped data taking as the electron cooler 
is down. | 
   |