HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 28 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year Text Attachments
  576   Thu Jul 8 14:07:19 2021 JanCalibrationbeam energies2021Table of ion energies calculated from cooler
parameters
 CodeCogsEqn.pngCodeCogsEqn(1).png 
  18   Tue Jul 23 10:46:29 2019 LaszloAnalysis124Xe pg peak fit using mixed cascade simulation This entry is the continuation of the cascade
effects on the pg peak shape entry:
 7x 
  22   Wed Sep 25 13:03:46 2019 LaszloAnalysissimulations on 118Te+p I have made some simulations at 8AMeV, 7AMeV
and 4AMeV energies for the main 118Te + p
reaction channels. For the
 11x 
  83   Fri Mar 20 13:21:33 2020 Jan, LaszloAnalysis124Xe data of first night The unpacked data of all runs from the first
night (46-50) is located at
litv-exp@lxg0188:/data.local2/E127_lmd/124Xe_1st_night.root
 90_deg.png35_deg.png145_deg.pngimage3063.pngimage4019.png 
  153   Sat Mar 21 23:19:14 2020 JanAnalysis118Te52+ on H2-target - Xray spectrum 90 degree The attached spectrum is for the 90 degree
X-ray detector taken for about 3 hours with
118Te52+.
 90_deg_118Te_runs64to66.png 
  159   Sun Mar 22 01:36:14 2020 Pierre-MichelAnalysisTarget overlap Here are the data file for the rates of the
recoil detector for different values of the
target bump. The average rate over background
 10x 
  241   Mon Mar 23 12:30:39 2020 laszloAnalysiswith and without scraper    124Xe_with_scraper_3D.png124Xe_with_scraper_2D.png124Xe_without_scraper_2D.png124Xe_without_scraper_3D.png 
  244   Mon Mar 23 13:26:59 2020 JanAnalysisruns_90to99 SCRAPER RESULTS With scraper, we have roughly 150-200 (p,g)
counts now.
 124Xe_Si_map.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png124Xe_Si_projection.png 
  251   Mon Mar 23 14:32:03 2020 JanAnalysisruns_100to104 NO-SCRAPER RESULTS Without scraper, we have very few (p,g) counts,
hard to get numbers quickly, maybe ~50.
 124Xe_Si_map.png124Xe_Si_projection.png124Xe_x-ray_35.png124Xe_x-ray_90.png124Xe_x-ray_145.png 
  268   Wed Mar 25 15:06:09 2020 LaszloAnalysisquick summary of the run numbers    SP54120032515060.pdf 
  Draft   Tue Apr 21 22:25:00 2020 JanAnalysis      
  285   Fri Nov 20 15:53:37 2020 JanAnalysisTest of 2nd DSSSD (gen2)2021Here is the analysis of the test runs with
the 2nd DSSD (gen2) using the quick_si_plots.c
script attached.
 quick_si_plots.ce127.hSi2_run001.ana.rootSi2_run002.ana.root 
  360   Fri May 21 01:17:37 2021 LaszloAnalysissimple analysis code2021//a simple code (template) for offline analysis
//made by Laszlo, serves as a simple demonstration
for enthusiastic shifters
  
  445   Tue May 25 11:58:30 2021 JanAnalysis118(p,g) counts until run01152021The two attached plots show the collected
Si data up to run0115.
 run91to115_Si_map.pngrun91to115_Si_projection.png 
  469   Wed May 26 14:28:23 2021 JanAnalysisXrays from 118Te & 124Xe2021Attached is a plot of the uncalibrated energy
spectra taken with the 90 degree xray detector
for 118Te (red) and 124Xe (blue).
 xray90_124Xe_118Te.png 
  523   Fri May 28 15:15:06 2021 JanAnalysis118Te(p,g) counts runs 135 to 1742021This is the summary of all Si data collected
at 6 MeV/u until run174 before the Alvarez
problem.
 run135to174_Si_map.pngrun135to174_Si_projection.png 
  572   Tue Jun 8 15:06:17 2021 ShahabAnalysisBeam lifetime2021measured beam lifetime after the second deceleration
using parallel plate Schottky detector and
the RSA5103 spectrum analyser. Analysis code
 pgamma_lifetime.001.pngpgamma_lifetime.002.png 
  361   Fri May 21 10:00:51 2021 JanAcceleratortarget bump2021The target overlap was optimized on xray and
si rates.
The setting now is -10mm in SC9
  
  413   Mon May 24 05:20:36 2021 Helmut, Yuri, Faraz, SergeyAcceleratorFRS setup2021Logbook from start of FRS until 118Te injection  14x 
  438   Tue May 25 07:51:48 2021 JanAcceleratorESR stacking cycle length2021The full cycle length of ESR with 30 stacks
is about 7:45 minutes, out of which 15.5
sec are with target switched ON.
  
ELOG V3.1.5-fc6679b