  proton-capture on 118Te, Page 3 of 29  Not logged in ELOG logo
Entry  Fri Mar 20 01:22:23 2020, Shahab, Runs, Setting for Gas target,  IMG_20200320_012048.jpg
Setting for the machines.
Entry  Fri Mar 20 04:32:22 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:03:03 2020, Shahab, Runs, run entry - run046,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 05:32:44 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:00:26 2020, Shahab, Runs, run entry - run047,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 06:34:40 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Fri Mar 20 07:01:06 2020, Shahab, Runs, run entry - run048,  
beam: 124Xe54+
energy: 10 MeV/u
Entry  Sat Mar 21 18:13:22 2020, Shahab, General, rough comparison gas target off and on,  target_effect.jpg
rough comparison of life time at 10 MeV/u when target off with on. more noise in background means weaker signal.
Entry  Sun Mar 22 12:50:00 2020, Shahab, Runs, Life time of 10 MeV/u Tail of 118-Te-52+,  target_off.jpgtarget_on.jpg
The life time of 10 MeV/u Tail of cycle 118-Te-52+ was analyzed using Schottky peak intensity. Schottky signal was taken from the parallel plate Schottky
monitor at  using the:
Entry  Sun Mar 22 23:59:12 2020, Shahab, Runs, run entry - run091,  
Taking data again with primary beam.

open file : run090
Entry  Mon Mar 23 00:36:51 2020, Shahab, Runs, run entry - run091,  
Taking data again with primary beam.

open file : run091
Entry  Mon Mar 23 00:39:52 2020, Shahab, General, Ramping cycle picture and data,  2020-03-23_machine_cycle_ramping.bmp2020-03-23_machine_cycle_ramping.xlsx
Complete ramping cycle recorded from Oscilloscope Tektronix MSOX2024A.
 Stored as XLS file.
Entry  Mon Mar 23 01:17:26 2020, Shahab, General, Life time measurements using Schottky,  
Did Schottky measurements using 5 shots with and without gas target each
restarting the DAQ
Entry  Mon Mar 23 01:18:16 2020, Shahab, Runs, run entry - run092,  
Taking data again with primary beam.

open file : run092
Entry  Mon Mar 23 01:53:59 2020, Shahab, Runs, Empty shots in ESR,  
since about 01:40 AM, there is no beam in ESR. .
stopped data acquisition
OPs are working on it. After searching, OPs decided that something is wrong with ESR.
Entry  Mon Mar 23 03:04:56 2020, Shahab, Runs, run entry - run093,  
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093
Entry  Mon Mar 23 03:07:11 2020, Shahab, Runs, SIS Kicker problem,  IMG_20200323_021051.jpg
After calling ESR on-call duty (M. Steck) he confirmed that the ESR is fine and suspected the SIS kicker modules.

SIS operators then checked and could confirm that module 5 is out of order and module 4 sometimes works sometimes not.
Entry  Mon Mar 23 03:38:01 2020, Shahab, Runs, run entry - run093,  
RUN 93 is with faulty SIS kicker module. Let's see what we can get. waiting for SIS kicker on-call duty (rufbereitschaft) to come.

open file : run093
Entry  Mon Mar 23 03:53:41 2020, Shahab, Runs, Reduced intensity inspite of faulty kicker,  
SIS Kicker is still faulty. but we managed to reduce again the intensity to around 2e6 particles in ring to reduce scattering on scraper.
Entry  Mon Mar 23 03:58:25 2020, Shahab, General, Kicker guy arrived,  
Kicker Guy (U. Blell) arrived in order to fix modules.