HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 5 of 29  Not logged in ELOG logo
ID Date Author Categorydown Subject Year
  173   Sun Mar 22 08:22:57 2020 EstherRunsrun entry - run077 
open file : run077

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 07:54 , first file: run077_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 08:25 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   46 Hz
Xray_145:  24 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~3.8e9
ESR current at injection:       11 uA
ESR particles after decel.:     
Target ON density:              1.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  174   Sun Mar 22 08:52:45 2020 EstherRunsrun entry - run078 
open file : run078

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 08:55 , first file: run078_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 08:55 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   7 Hz
Xray_90:   46 Hz
Xray_145:  23 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.09 uA


SIS particles before:           ~2.1e9
ESR current at injection:       8 uA
ESR particles after decel.:     
Target ON density:              2.6e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  175   Sun Mar 22 09:21:55 2020 EstherRunsrun entry - run078 
open file : run078

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 08:55 , first file: run078_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 09:23 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   58 Hz
Xray_145:  15 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           ~2.2e9
ESR current at injection:       8 uA
ESR particles after decel.:     
Target ON density:              2.5e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  176   Sun Mar 22 09:52:09 2020 Esther, RaganRunsrun entry - run079 
open file : run079

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 09:55 , first file: run079_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 09:55 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   5 Hz
Xray_90:   52 Hz
Xray_145:  19 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.2e9
ESR current at injection:       6 uA
ESR particles after decel.:     
Target ON density:              2.5e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  178   Sun Mar 22 10:22:27 2020 Esther, RaganRunsrun entry - run079 
open file : run079

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 09:55 , first file: run079_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 10:25 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   2 Hz
Xray_90:   59 Hz
Xray_145:  28 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.07 uA


SIS particles before:           ~3.0e9
ESR current at injection:       7 uA
ESR particles after decel.:     
Target ON density:              2.4e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  180   Sun Mar 22 10:53:36 2020 Esther, RaganRunsrun entry - run080 
open file : run080

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 10:55 , first file: run080_0001.lmd
run stop  at : , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 10:55 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   3 Hz
Xray_90:   48 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.08 uA


SIS particles before:           ~3.0e9
ESR current at injection:       10 uA
ESR particles after decel.:     
Target ON density:              2.4e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  181   Sun Mar 22 11:28:02 2020 Esther, RaganRunsrun entry - run080 
open file : run080

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 10:55 , first file: run080_0001.lmd
run stop  at 11:36: , last file:  run075_0xxx.lmd

_______________________________________________________________________________

time: 11:30 pm.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   33 Hz
Xray_145:  26 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.0e9
ESR current at injection:       10 uA
ESR particles after decel.:     
Target ON density:              1.8e13
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  182   Sun Mar 22 11:37:37 2020 Esther, RaganRunsrun entry - run081, Uli working with gas jet target 
Uli is here to work with the gas jet target.

open file : run081

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 11:36 , first file: run081_0001.lmd
run stop  at 12:01 , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 11:36 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.0e9
ESR current at injection:        uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  184   Sun Mar 22 12:26:15 2020 Esther, RaganRunsrun entry - run082, Uli working with gas jet target 
Uli is still working with gas jet target however the vacuum problem with the SIS is resolved now. 
open file : run082

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 12:25 , first file: run082_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 12:25 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~3.3e9
ESR current at injection:        uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  185   Sun Mar 22 12:50:00 2020 ShahabRunsLife time of 10 MeV/u Tail of 118-Te-52+ 
The life time of 10 MeV/u Tail of cycle 118-Te-52+ was analyzed using Schottky peak intensity. Schottky signal was taken from the parallel plate Schottky monitor at  using the:

Tektronix RSA5103B analyzer parameters:
Frequency = 39.8380 MHz
span = 50 kHz
RBW = 100 Hz
AcqBW = 78.12 kHz

The peak intensity is integrated power of the resolution bandwidth. 

Trigger was set to machine 12, same as gas target "on" signal. Each file contains 40 seconds of recorded signal. Spectra were calculated using sensitive multitaper method with additional averaging of every 10 time frames.

After evaluation of several Schottky spectra, except from some fluctuations, there was no significant change in beam lifetime with or without gas target. They are in the same order of magnitude, that is, it seems that target interaction is not so prominent compared to the rest of the ring. with a xenon target the situation would be much different.


Attached are some plots. Also here are the results of the analyzed files in text form:



Target off: average 9.21 sec

118Te52+_-2020.03.21.08.35.40.854.tiq t= 9.24733015363724
118Te52+_-2020.03.21.08.36.50.173.tiq t= 8.070302067046537
118Te52+_-2020.03.21.08.37.58.916.tiq t= 9.309208734357618
118Te52+_-2020.03.21.08.39.07.690.tiq t= 7.94474492655749
118Te52+_-2020.03.21.08.40.16.459.tiq t= 11.510487780556794


Target on: average 10.9 secs

118Te52+_-2020.03.21.08.28.48.246.tiq t= 9.80012584127354
118Te52+_-2020.03.21.08.29.56.985.tiq t= 11.751070659928155
118Te52+_-2020.03.21.08.31.05.750.tiq t= 10.719205394679026
118Te52+_-2020.03.21.08.32.14.509.tiq t= 13.722763765411063
118Te52+_-2020.03.21.08.33.23.269.tiq t= 8.513007281444073
Attachment 1: target_off.jpg
target_off.jpg
Attachment 2: target_on.jpg
target_on.jpg
  187   Sun Mar 22 13:22:44 2020 Esther, RaganRunsrun entry - run083, Uli working with gas jet target 
Uli is still working with gas jet target. 
open file : run083

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 13:25 , first file: run083_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 13:25 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.5e9
ESR current at injection:        11 uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  189   Sun Mar 22 14:23:50 2020 Esther, Ragan, Michael, LaszloRunsrun entry - run084, Uli working with gas jet target 
Uli is still working with gas jet target. 
open file : run084

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 14:25 , first file: run084_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 14:25 pm.

ON Rates
Si_X:       Hz
Si_Y:       Hz
Xray_35:    Hz
Xray_90:    Hz
Xray_145:   Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.07 uA


SIS particles before:           ~2.5e9
ESR current at injection:        11 uA
ESR particles after decel.:     
Target ON density:              Uli is working on it
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  190   Sun Mar 22 14:40:14 2020 Esther, Michael, LaszloRunsrun entry - run085, gas jet is back in business! 
open file : run085

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 14:39 , first file: run085_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 14:40 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    63 Hz
Xray_145:   30 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.5e9
ESR current at injection:        9 uA
ESR particles after decel.:     
Target ON density:              1e14
Base line for ESR current drops dpwn from 4 to -2 after restarting the ESR cycle

copy and repeat the above (below the line) every 30 minutes
  192   Sun Mar 22 15:14:01 2020 Michael, LaszloRunsrun entry - run085, gas jet is back in business! 
open file : run085

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 14:39 , first file: run085_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 15:14 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    2 Hz
Xray_90:    55 Hz
Xray_145:   32 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.07 uA


SIS particles before:           ~2e9
ESR current at injection:        9 uA
ESR particles after decel.:     
Target ON density:              8.7e13

copy and repeat the above (below the line) every 30 minutes
http://clipboard.acc.gsi.de/screenshot-app/screenshots/tcl1048/2020-03-22_15-29-05-937.png
Attachment 1: 2020-03-22_15-29-05-937.png
2020-03-22_15-29-05-937.png
  193   Sun Mar 22 15:39:29 2020 MichaelRunsrun entry - run086 
open file : run086

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 15:39 , first file: run086_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 15:42 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    4 Hz
Xray_90:    45 Hz
Xray_145:   22 Hz
BaF_OR:     Hz

Si voltage:          60.01 V  
Si leakage current:  4.06 uA


SIS particles before:           ~2.1e9
ESR current at injection:        11 uA
ESR particles after decel.:     
Target ON density:              8.8e13

copy and repeat the above (below the line) every 30 minutes
  194   Sun Mar 22 16:10:12 2020 MichaelRunsrun entry - run086 
open file : run086

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 15:39 , first file: run086_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 16:10 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    56 Hz
Xray_145:   28 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.07 uA


SIS particles before:           ~2.3e9
ESR current at injection:        10.5 uA
ESR particles after decel.:     
Target ON density:              8.92e13

copy and repeat the above (below the line) every 30 minutes
  195   Sun Mar 22 16:39:37 2020 MichaelRunsrun entry - run087 
Four shots at the end of 086/beginning of 87 were empty, no SIS kicker. Beam operators fixed it quickly.

open file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 16:42 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    1 Hz
Xray_90:    52 Hz
Xray_145:   16 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:        8.4 uA
ESR particles after decel.:     
Target ON density:              8.7e13

copy and repeat the above (below the line) every 30 minutes
  196   Sun Mar 22 17:09:49 2020 MichaelRunsrun entry - run087 
open file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:10 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    35 Hz
Xray_145:   21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.38e9
ESR current at injection:        8.9 uA
ESR particles after decel.:     
Target ON density:              8.58e13

copy and repeat the above (below the line) every 30 minutes
  197   Sun Mar 22 17:35:39 2020 MichaelRunsrun entry - run087.  
Closing file at 17:39, stopping data taking. Yuri will switch to primary beam through FRS without target.

Also a minor observation is, that at the end of the target on phase, the X-ray count rate is going up very high. (Data acquisition was in Jet Off mode)

close file : run087

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 16:38 , first file: run087_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:35 pm. (This is towards the end of the run 087)

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    35 Hz
Xray_145:   21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.08 uA


SIS particles before:           ~2.39e9
ESR current at injection:        10 uA
ESR particles after decel.:     
Target ON density:              8.61e13

copy and repeat the above (below the line) every 30 minutes
  200   Sun Mar 22 17:49:28 2020 Michael, LaszloRunsrun entry - run088 
The beam is still unchanged. We just start a run to collect all remaining data.
Data is probably scratch, expect changing conditions at the machines during the run.

No counts in Target ON phase at Silicon Detector. Probably we had only two first shoots from FRS in this run (see picture below)

open file : run088

beam: 118Te52+ (?)
energy: 10 MeV/u

purpose: data with TARGET ON and SCRAPER is back again--> We expect to cut the Rutherford for now on.

Detector position (Si): -24 mm

run start at 17:48:58 , first file: run088_0001.lmd
run stop  at  , last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 17:53 pm.

ON Rates
Si_X:       0 Hz
Si_Y:       0 Hz
Xray_35:    3 Hz
Xray_90:    54 Hz
Xray_145:   28 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.05 uA


SIS particles before:           ~2.3e9
ESR current at injection:        6.5 uA
ESR particles after decel.:     
Target ON density:              8.45e13

copy and repeat the above (below the line) every 30 minutes
Attachment 1: Trafo_run88.png
Trafo_run88.png
ELOG V3.1.5-fc6679b