HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 6 of 29  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Categorydown Subject Year Text Attachments
  202   Sun Mar 22 18:41:50 2020 Michael, LaszloRunsrun entry - run088 Closed file run088 at 17:55. No beam in ESR.   
  205   Sun Mar 22 22:00:49 2020 Michael, Laszlo, YuriRunsrun entry - run089 - switched to Primary beam Yuri is still tuning, but we are collecting
data. Beam is in. Detectors are out.
  
  206   Sun Mar 22 22:06:21 2020 Michael, Laszlo, YuriRunsrun entry - run089 - stopped closed file again.

Yuri is still tuning, but we are collecting
  
  207   Sun Mar 22 22:46:56 2020 Michael, Laszlo, YuriRunsrun entry - run090 Taking data again with primary beam.

open file : run090
  
  209   Sun Mar 22 23:59:12 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run090
  
  211   Mon Mar 23 00:36:51 2020 ShahabRunsrun entry - run091 Taking data again with primary beam.

open file : run091
  
  214   Mon Mar 23 01:18:16 2020 ShahabRunsrun entry - run092 Taking data again with primary beam.

open file : run092
  
  215   Mon Mar 23 01:53:59 2020 ShahabRunsEmpty shots in ESR since about 01:40 AM, there is no beam in
ESR. .
stopped data acquisition
  
  216   Mon Mar 23 03:04:56 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  217   Mon Mar 23 03:07:11 2020 ShahabRunsSIS Kicker problem After calling ESR on-call duty (M. Steck)
he confirmed that the ESR is fine and suspected
the SIS kicker modules.
 IMG_20200323_021051.jpg 
  218   Mon Mar 23 03:38:01 2020 ShahabRunsrun entry - run093 RUN 93 is with faulty SIS kicker module. Let's
see what we can get. waiting for SIS kicker
on-call duty (rufbereitschaft) to come.
  
  219   Mon Mar 23 03:53:41 2020 ShahabRunsReduced intensity inspite of faulty kicker SIS Kicker is still faulty. but we managed
to reduce again the intensity to around 2e6
particles in ring to reduce scattering on
  
  221   Mon Mar 23 04:08:12 2020 ShahabRunsrun 93 stopped run 93 which was during faulty kicker was
stopped so that the kicker module can be
repaired.
  
  222   Mon Mar 23 05:55:24 2020 ShahabRunsKicker problem not solved yet no solution to kicker problem.    
  223   Mon Mar 23 05:59:01 2020 ShahabRunsSIS Kicker  SIS Kicker seems to be working properly. but
we have to see how regularly it will work.
  
  224   Mon Mar 23 06:20:06 2020 ShahabRunsPosition on scintillator corrected sitll no beam in ESR position on the scintillator was corrected
by the OPs to center, but beam is still not
in ESR.
 IMG_20200323_061337.jpg 
  225   Mon Mar 23 06:40:17 2020 ShahabRunsno beam in SIS nor in ESR manic Monday morning.   
  226   Mon Mar 23 06:49:46 2020 ShahabRunsESR kicker also has some problems     
  228   Mon Mar 23 08:04:07 2020 Shahab, Laszlo,YuryRunsrun entry - run0942020open file : run094

beam: 124Xe54+
 2020-03-23_08-13-00-443.png 
  229   Mon Mar 23 08:20:31 2020 Shahab, Laszlo,YuryRunsrun entry - run095 open file : run095

beam: 124Xe54+
 2020-03-23_08-31-45-715.png 
ELOG V3.1.5-fc6679b