HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  proton-capture on 118Te, Page 7 of 29  Not logged in ELOG logo
ID Date Authordown Category Subject Year
  529   Fri May 28 21:54:05 2021 Ragan, ThanassisRunsRun 01812021
No. of stacks: 10
length SC10: 2x 5.5s
bump ge01sq2f (sc10): -20 mm
bump target (sc10): -12.8 mm

open file : e127b_run0181.lmd

beam: 118Te52+
energy: 6 MeV/u
cooler voltage:

purpose:
Fragment beam measurement (beating the record of rad. beam pg-measurement)

Detector position (Si): -25 mm
GE01DD1IG position (Scraper): +2.0 mm

run start: 21:54:46 28.05.2021
run stop: 22:53:53 28.05.2021
_______________________________________________________________________________

ON Rates
Si_ON_bdt: ~ 5 Hz
Xray_ON_bdt: ~ 120 Hz
BaF_OR: ---

Si voltage: 100.0 V
Si leakage current: 380 nA


SIS particles before: 6.0e8 (one shoot)
ESR current at injection: 3.0e6 (stacked)
ESR particles after decel.: 6.9e5
Target ON density: 1.0e14
  108   Sat Mar 21 07:00:18 2020 Ragan, RuiJiu, Tino, OliverRunsrun entry - run055 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 06:30 , first file: run055_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 7:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   31 Hz
Xray_145:  42 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           3.6e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.49e13


copy and repeat the above (below the line) every 30 minutes
  243   Mon Mar 23 13:23:59 2020 Ragan, RuiJiu, Pierre-MichelRunsrun entry - run102 
open file : run102

beam: 124Xe54+
energy: 10 MeV/u

we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.

purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)

Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm

run start at 12:49, first file: run102_0001.lmd
run stop  at ,13:38 last file:  run_0xxx.lmd

_______________________________________________________________________________

time: 13:24

ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    10 Hz
Xray_90:    34 Hz
Xray_145:   22 Hz
BaF_OR:     ---

Si voltage:          60.02 V  
Si leakage current:  4.32 uA with spikes for 3s long after injection roughly 10uA


SIS particles before:           2e9
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1.44e7? (it is hard to catch exactly)
Target ON density:              4.07e13

copy and repeat the above (below the line) every 30 minutes
  113   Sat Mar 21 09:30:32 2020 Ragan, RuiJiu, AlexRunsrun entry - run058 
Open file: runstart058

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 9:00 , first file: run058_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 9:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   49 Hz
Xray_145:  19 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.03 uA


SIS particles before:           3e9
ESR particles at injection:     estimated ~1.1e6
ESR particles after decel.:     
Target ON density:              1.56e13


copy and repeat the above (below the line) every 30 minutes
  78   Fri Mar 20 07:30:16 2020 Ragan, RuiJiuRunsrun entry - run049 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 07:31 , first file: run049_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 07:30

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  0 Hz
Xray_90:   35 Hz
Xray_145:   23 Hz
BaF_OR:    2483 Hz

Si voltage:          60.02 V  
Si leakage current:  4.02 uA


SIS particles before:           2.3e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     5.8e6
Target ON density:              1.35e13


copy and repeat the above (below the line) every 30 minutes
  79   Fri Mar 20 08:01:40 2020 Ragan, RuiJiuRunsrun entry - run049 
beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 07:31 , first file: run049_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 08:00

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  2 Hz
Xray_90:   33 Hz
Xray_145:   29 Hz
BaF_OR:    2673 Hz

Si voltage:          60.01 V  
Si leakage current:  4.00 uA


SIS particles before:           2e9
ESR particles at injection:     5.7e7
ESR particles after decel.:     5.1e6
Target ON density:              1.5e13


copy and repeat the above (below the line) every 30 minutes
  80   Fri Mar 20 08:30:52 2020 Ragan, RuiJiuRunsrun entry - run049 
There is no beam due to water leakage in the transfer channel of SIS.

Stop file: run049 at 8:29 am
  81   Fri Mar 20 10:28:31 2020 Ragan, RuiJiuRunsrun entry - run050 
Beam is back at 10:27 am.
Open file: runstart050

beam: 124Xe54+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -25 mm

run start at 10:27 , first file: run050_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 10:30

ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  2 Hz
Xray_90:   35 Hz
Xray_145:   27 Hz
BaF_OR:    2441 Hz

Si voltage:          60.02 V  
Si leakage current:  3.98 uA


SIS particles before:           2e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     1.3e7
Target ON density:              1.38e13


copy and repeat the above (below the line) every 30 minutes
  82   Fri Mar 20 11:00:25 2020 Ragan, RuiJiuRunsrun entry - run050 
Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
10:55 am.

The HV for DSSD is switched off at 
11:10 am as the detector was out 
and the leak current was ~18 uA.
At 11:11 am, the file was closed.
File close: run050 stopped.

update by Laszlo: the increase of the leakage current is due to the fact that we have a vacuum measurement device next to the DSSSD when it is moved out. The phenomena is normal, the DSSSD is hit by electrons (or ions) coming from the vacuum measurement device. 
  109   Sat Mar 21 07:30:19 2020 Ragan, RuiJiuRunsrun entry - run056 
Open file: runstart056

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 7:30 , first file: run056_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 7:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   32 Hz
Xray_145:  41 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.2e6
ESR particles after decel.:     
Target ON density:              1.61e13


copy and repeat the above (below the line) every 30 minutes
  110   Sat Mar 21 08:01:03 2020 Ragan, RuiJiuRunsrun entry - run056 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 07:30 , first file: run056_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 8:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   38 Hz
Xray_145:  23 Hz
BaF_OR:    - Hz

Si voltage:          60.02 V  
Si leakage current:  4.02 uA


SIS particles before:           3.3e9
ESR particles at injection:     estimated ~1.02e6
ESR particles after decel.:     
Target ON density:              1.7e13


copy and repeat the above (below the line) every 30 minutes
  111   Sat Mar 21 08:31:27 2020 Ragan, RuiJiuRunsrun entry - run057 
Open file: runstart057

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 8:30 , first file: run057_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 8:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   12 Hz
Xray_90:   83 Hz
Xray_145:  70 Hz
BaF_OR:    - Hz

Si voltage:          60.01 V  
Si leakage current:  4.04 uA


SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.53e13


copy and repeat the above (below the line) every 30 minutes
  112   Sat Mar 21 09:00:29 2020 Ragan, RuiJiuRunsrun entry - run057 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 08:30 , first file: run057_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 9:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   46 Hz
Xray_145:  35 Hz
BaF_OR:    15Hz

Si voltage:          60.02 V  
Si leakage current:  4.03 uA


SIS particles before:           3.4e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.5e13


copy and repeat the above (below the line) every 30 minutes
  122   Sat Mar 21 12:02:57 2020 Ragan, LaszloGeneralrun entry - run061 
12:02 pm - scapper is taken out completely 
open file : runstart061
  114   Sat Mar 21 10:00:19 2020 Ragan, AlexRunsrun entry - run058 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 09:30 , first file: run058_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 10:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   32 Hz
Xray_145:  19 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.03 uA


SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.1e6
ESR particles after decel.:     
Target ON density:              1.716e13


copy and repeat the above (below the line) every 30 minutes
  115   Sat Mar 21 10:20:27 2020 Ragan, AlexGeneralTarget LN2 
The LN2 Dewar on the ESR roof has been refilled.
  120   Sat Mar 21 11:32:46 2020 Ragan, AlexRunsrun entry - run060 
Open file: runstart060

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 11:30 , first file: run060_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 11:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    4 Hz
Xray_90:   30 Hz
Xray_145:  21 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           3.1e9
ESR particles at injection:     estimated ~1.08e6
ESR particles after decel.:     
Target ON density:              1.54e13


copy and repeat the above (below the line) every 30 minutes
  121   Sat Mar 21 12:00:27 2020 Ragan, AlexRunsrun entry - run060 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 11:30 , first file: run060_0001.lmd
run stop  at xx:xx , last file:  run060_0xxx.lmd

_______________________________________________________________________________

time: 12:00 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    4 Hz
Xray_90:   28 Hz
Xray_145:  77 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           3.1e9
ESR particles at injection:     estimated ~1.08e6
ESR particles after decel.:     
Target ON density:              1.74e13


copy and repeat the above (below the line) every 30 minutes
  117   Sat Mar 21 11:04:47 2020 Ragan, Alex, LaszloRunsrun entry - run059 
beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 10:30 , first file: run059_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 11:07 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    2-3 Hz
Xray_90:   29 Hz
Xray_145:  17 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.04 uA


SIS particles before:           2.5e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.34e13


copy and repeat the above (below the line) every 30 minutes
  116   Sat Mar 21 10:28:23 2020 Ragan, AlexRunsrun entry - run059 
Open file: runstart059

beam: 118Te52+
energy: 10 MeV/u

purpose: data with TARGET ON

Detector position (Si): -24 mm

run start at 10:30 , first file: run059_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd

_______________________________________________________________________________

time: 10:30 am.

ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   40 Hz
Xray_145:  15 Hz
BaF_OR:     Hz

Si voltage:          60.02 V  
Si leakage current:  4.00 uA


SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.59e13


copy and repeat the above (below the line) every 30 minutes
ELOG V3.1.5-fc6679b