| ID | Date | Author  | Category | Subject | Year | 
| 529 | Fri May 28 21:54:05 2021 | Ragan, Thanassis | Runs | Run 0181 | 2021 | 
| No. of stacks: 10 length SC10: 2x 5.5s
 bump ge01sq2f (sc10): -20 mm
 bump target   (sc10): -12.8 mm
 
 open file : e127b_run0181.lmd
 
 beam: 118Te52+
 energy: 6 MeV/u
 cooler voltage:
 
 purpose:
 Fragment beam measurement (beating the record of rad. beam pg-measurement)
 
 Detector position (Si): -25 mm
 GE01DD1IG position (Scraper): +2.0 mm
 
 run start:  21:54:46 28.05.2021
 run stop:   22:53:53 28.05.2021
 _______________________________________________________________________________
 
 ON Rates
 Si_ON_bdt:    ~ 5   Hz
 Xray_ON_bdt:  ~ 120 Hz
 BaF_OR:     ---
 
 Si voltage:          100.0 V
 Si leakage current:  380 nA
 
 
 SIS particles before:      6.0e8 (one shoot)
 ESR current at injection:  3.0e6 (stacked)
 ESR particles after decel.: 6.9e5
 Target ON density:          1.0e14
 | 
| 108 | Sat Mar 21 07:00:18 2020 | Ragan, RuiJiu, Tino, Oliver | Runs | run entry - run055 |  | 
| beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 06:30 , first file: run055_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 7:00 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   31 Hz
Xray_145:  42 Hz
BaF_OR:    - Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           3.6e9
ESR particles at injection:     estimated ~10^5 - 10^4
ESR particles after decel.:     
Target ON density:              1.49e13
copy and repeat the above (below the line) every 30 minutes | 
| 243 | Mon Mar 23 13:23:59 2020 | Ragan, RuiJiu, Pierre-Michel | Runs | run entry - run102 |  | 
| open file : run102
beam: 124Xe54+
energy: 10 MeV/u
we run at MAX INTENSITY as we can: SIS was increased to its top, but unfortunately we still end up with 1.5e9 at injection from SIS. Sergey also optimized some stuff.
purpose: data with TARGET ON and SCRAPER OFF --> this leakage current spikes associated with primary scattering from the scraper edge seem to disappear, but we get still 10kHz rate on the detector a few sec after injection(this small "bump" 
after the peak in the Si current - see the picture below)
Detector position (Si): -27 mm
GE01DD1IG position (Scraper): 9 mm
run start at 12:49, first file: run102_0001.lmd
run stop  at ,13:38 last file:  run_0xxx.lmd
_______________________________________________________________________________
time: 13:24
ON Rates
Si_X:       1 Hz
Si_Y:       1 Hz
Xray_35:    10 Hz
Xray_90:    34 Hz
Xray_145:   22 Hz
BaF_OR:     ---
Si voltage:          60.02 V  
Si leakage current:  4.32 uA with spikes for 3s long after injection roughly 10uA
SIS particles before:           2e9
ESR current at injection:       5.8e7?? (we see a bug: like the number of particles increases in the bunching phase)
ESR particles after decel.:     1.44e7? (it is hard to catch exactly)
Target ON density:              4.07e13
copy and repeat the above (below the line) every 30 minutes | 
| 113 | Sat Mar 21 09:30:32 2020 | Ragan, RuiJiu, Alex | Runs | run entry - run058 |  | 
| Open file: runstart058
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 9:00 , first file: run058_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 9:30 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   49 Hz
Xray_145:  19 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.03 uA
SIS particles before:           3e9
ESR particles at injection:     estimated ~1.1e6
ESR particles after decel.:     
Target ON density:              1.56e13
copy and repeat the above (below the line) every 30 minutes | 
| 78 | Fri Mar 20 07:30:16 2020 | Ragan, RuiJiu | Runs | run entry - run049 |  | 
| beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -25 mm
run start at 07:31 , first file: run049_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 07:30
ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  0 Hz
Xray_90:   35 Hz
Xray_145:   23 Hz
BaF_OR:    2483 Hz
Si voltage:          60.02 V  
Si leakage current:  4.02 uA
SIS particles before:           2.3e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     5.8e6
Target ON density:              1.35e13
copy and repeat the above (below the line) every 30 minutes | 
| 79 | Fri Mar 20 08:01:40 2020 | Ragan, RuiJiu | Runs | run entry - run049 |  | 
| beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -25 mm
run start at 07:31 , first file: run049_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 08:00
ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  2 Hz
Xray_90:   33 Hz
Xray_145:   29 Hz
BaF_OR:    2673 Hz
Si voltage:          60.01 V  
Si leakage current:  4.00 uA
SIS particles before:           2e9
ESR particles at injection:     5.7e7
ESR particles after decel.:     5.1e6
Target ON density:              1.5e13
copy and repeat the above (below the line) every 30 minutes | 
| 80 | Fri Mar 20 08:30:52 2020 | Ragan, RuiJiu | Runs | run entry - run049 |  | 
| There is no beam due to water leakage in the transfer channel of SIS.
Stop file: run049 at 8:29 am | 
| 81 | Fri Mar 20 10:28:31 2020 | Ragan, RuiJiu | Runs | run entry - run050 |  | 
| Beam is back at 10:27 am.
Open file: runstart050
beam: 124Xe54+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -25 mm
run start at 10:27 , first file: run050_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 10:30
ON Rates
Si_X:      0 Hz
Si_Y:       0 Hz
Xray_35:  2 Hz
Xray_90:   35 Hz
Xray_145:   27 Hz
BaF_OR:    2441 Hz
Si voltage:          60.02 V  
Si leakage current:  3.98 uA
SIS particles before:           2e9
ESR particles at injection:     5.8e7
ESR particles after decel.:     1.3e7
Target ON density:              1.38e13
copy and repeat the above (below the line) every 30 minutes | 
| 82 | Fri Mar 20 11:00:25 2020 | Ragan, RuiJiu | Runs | run entry - run050 |  | 
| Yuri and ESR team are optimising 
the deceleration in ESR.
DSSSD detector is taken out at 
10:55 am.
The HV for DSSD is switched off at 
11:10 am as the detector was out 
and the leak current was ~18 uA.
At 11:11 am, the file was closed.
File close: run050 stopped.
update by Laszlo: the increase of the leakage current is due to the fact that we have a vacuum measurement device next to the DSSSD when it is moved out. The phenomena is normal, the DSSSD is hit by electrons (or ions) coming from the vacuum measurement device.  | 
| Attachment 1: IMG_20200320_111413.jpg | 
|   | 
| 109 | Sat Mar 21 07:30:19 2020 | Ragan, RuiJiu | Runs | run entry - run056 |  | 
| Open file: runstart056
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 7:30 , first file: run056_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 7:30 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   32 Hz
Xray_145:  41 Hz
BaF_OR:    - Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.2e6
ESR particles after decel.:     
Target ON density:              1.61e13
copy and repeat the above (below the line) every 30 minutes | 
| 110 | Sat Mar 21 08:01:03 2020 | Ragan, RuiJiu | Runs | run entry - run056 |  | 
| beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 07:30 , first file: run056_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 8:00 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   38 Hz
Xray_145:  23 Hz
BaF_OR:    - Hz
Si voltage:          60.02 V  
Si leakage current:  4.02 uA
SIS particles before:           3.3e9
ESR particles at injection:     estimated ~1.02e6
ESR particles after decel.:     
Target ON density:              1.7e13
copy and repeat the above (below the line) every 30 minutes | 
| 111 | Sat Mar 21 08:31:27 2020 | Ragan, RuiJiu | Runs | run entry - run057 |  | 
| Open file: runstart057
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 8:30 , first file: run057_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 8:30 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   12 Hz
Xray_90:   83 Hz
Xray_145:  70 Hz
BaF_OR:    - Hz
Si voltage:          60.01 V  
Si leakage current:  4.04 uA
SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.53e13
copy and repeat the above (below the line) every 30 minutes | 
| 112 | Sat Mar 21 09:00:29 2020 | Ragan, RuiJiu | Runs | run entry - run057 |  | 
| beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 08:30 , first file: run057_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 9:00 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   46 Hz
Xray_145:  35 Hz
BaF_OR:    15Hz
Si voltage:          60.02 V  
Si leakage current:  4.03 uA
SIS particles before:           3.4e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.5e13
copy and repeat the above (below the line) every 30 minutes | 
| 122 | Sat Mar 21 12:02:57 2020 | Ragan, Laszlo | General | run entry - run061 |  | 
| 12:02 pm - scapper is taken out completely 
open file : runstart061 | 
| 114 | Sat Mar 21 10:00:19 2020 | Ragan, Alex | Runs | run entry - run058 |  | 
| beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 09:30 , first file: run058_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 10:00 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   1 Hz
Xray_90:   32 Hz
Xray_145:  19 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.03 uA
SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.1e6
ESR particles after decel.:     
Target ON density:              1.716e13
copy and repeat the above (below the line) every 30 minutes | 
| 115 | Sat Mar 21 10:20:27 2020 | Ragan, Alex | General | Target LN2 |  | 
| The LN2 Dewar on the ESR roof has been refilled. | 
| 120 | Sat Mar 21 11:32:46 2020 | Ragan, Alex | Runs | run entry - run060 |  | 
| Open file: runstart060
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 11:30 , first file: run060_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 11:30 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    4 Hz
Xray_90:   30 Hz
Xray_145:  21 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           3.1e9
ESR particles at injection:     estimated ~1.08e6
ESR particles after decel.:     
Target ON density:              1.54e13
copy and repeat the above (below the line) every 30 minutes | 
| 121 | Sat Mar 21 12:00:27 2020 | Ragan, Alex | Runs | run entry - run060 |  | 
| 
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 11:30 , first file: run060_0001.lmd
run stop  at xx:xx , last file:  run060_0xxx.lmd
_______________________________________________________________________________
time: 12:00 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    4 Hz
Xray_90:   28 Hz
Xray_145:  77 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           3.1e9
ESR particles at injection:     estimated ~1.08e6
ESR particles after decel.:     
Target ON density:              1.74e13
copy and repeat the above (below the line) every 30 minutes | 
| 117 | Sat Mar 21 11:04:47 2020 | Ragan,  Alex, Laszlo | Runs | run entry - run059 |  | 
| beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 10:30 , first file: run059_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 11:07 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:    2-3 Hz
Xray_90:   29 Hz
Xray_145:  17 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.04 uA
SIS particles before:           2.5e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.34e13
copy and repeat the above (below the line) every 30 minutes | 
| 116 | Sat Mar 21 10:28:23 2020 | Ragan,  Alex | Runs | run entry - run059 |  | 
| Open file: runstart059
beam: 118Te52+
energy: 10 MeV/u
purpose: data with TARGET ON
Detector position (Si): -24 mm
run start at 10:30 , first file: run059_0001.lmd
run stop  at xx:xx , last file:  run0xx_0xxx.lmd
_______________________________________________________________________________
time: 10:30 am.
ON Rates
Si_X:      0 Hz
Si_Y:      0 Hz
Xray_35:   0 Hz
Xray_90:   40 Hz
Xray_145:  15 Hz
BaF_OR:     Hz
Si voltage:          60.02 V  
Si leakage current:  4.00 uA
SIS particles before:           3.2e9
ESR particles at injection:     estimated ~1.3e6
ESR particles after decel.:     
Target ON density:              1.59e13
copy and repeat the above (below the line) every 30 minutes |