Entry  Wed Mar 23 16:16:42 2022, V. Hannen, Detectors, Control software for XUV and copper mirror detector Manual.pdf
Attached you find a manual for the software used to control the movement of the XUV detector and the copper mirror detector. 
The software is also used to set the electrode voltages and coil currents of the XUV detector. 
    Reply  Thu Mar 31 15:53:50 2022, Konstantin, Detectors, Control software for XUV and copper mirror detector XUV_Cu_GUI.png
> Attached you find a manual for the software used to control the movement of the XUV detector and the copper mirror detector. 
> The software is also used to set the electrode voltages and coil currents of the XUV detector. 
Entry  Fri Apr 8 00:06:37 2022, Patrick, Laser, Connection to the laser pc 
To login to the laser pc use the command

xfreerdp -g 1920x1080 -u atplaser atppc023.campus.gsi.de
Entry  Thu Apr 14 12:27:18 2022, Sebastian, Max, Detectors, Connection to XUV / Cu reestablished! 
The connection to the XUV and Cu were lost during the nightshift.

The XUV detector was in the park position,
Entry  Mon Apr 11 11:05:35 2022, Sebastian, Kristian, Laser, Check laser power 
we checked the UV laser power at 10:15 am. It was only 8.5 - 9 mJ. Pumping power was 460 mJ, which is the maximum output of the current system. We should
change the flashlamps soon
Entry  Wed Mar 16 08:31:52 2022, Kristian, DAQ, Check cables and timing 
Konstantin and I generated a signal in the Messhütte and sent it to the ESR. 
There, we used a 44m BNC cable that was sufficently long to reach all detectors. 
Our signal was connected instead of the PMT/PD. Hence, it was a roundtrip measurement.
Entry  Mon Apr 11 22:14:51 2022, Konstantin, Sarper, Laser, Changing of the wavelength range 
It is planned to change the scan range of the laser wavelength from 322.41 - 322.0 nm to 322.01 - 321.6 nm @ 4 a.m. 
Entry  Mon Mar 21 16:33:23 2022, , DAQ, Changing code of go4 
We agreed to indicate changes in the go4 analysis code according to the
following scheme
    Reply  Mon Mar 21 17:03:47 2022, , DAQ, Changing code of go4 
Correction: Comments in C/C++ start with // , i.e. forward slash

  [B]//--2022-mm-dd HH:MM comment on the respective change[/B].
Entry  Sat Apr 9 14:15:44 2022, Kristian, Max, Konstantin, DAQ, Change in LV code 
We changed the LV code so that the Cobra Set Wavelength is permanently sent. Before it was only sent once at the beginning of each laser step. This, however,
lead to too much data for the LV->MBS server.
This was fixed by inserting a 250 ms wait in LV (in Krypton data VI). Basically, all LV values are now updated every 250 ms, which works fine with MBS
Entry  Fri Apr 8 11:02:04 2022, DW, YL, RSS, SL, , Change h=2 to h=1 
After changing to h=1
The frequency manipulation #5: f=242.021487MHz (124th harmonic) [no bunching]
Manipulation #7: f=242.021812 MHz [with bunching]
Entry  Fri Apr 8 01:48:57 2022, Patrick, DAQ, Bugged Trending plots? 2022-04-08_Cobra_set_wavelength.png
The wavelengths/frequencies shown in the graph in the labview window do not match the wavelengths/frequencies in go4.
Compare the picture which shows an incomplete laser scan although the scans in the labview window are completed (The measurement was started at an 'elapsed
MBS time' of 2700s and took 1700s/28min).
Entry  Sat Apr 9 04:40:01 2022, Patrick, DAQ, Bugged Trending plots? 2022-04-09_Cobra_set_wavelength2.png
The problem from yesterday (ID:147) still persists. All the plots (not only the labview stuff) comes in too late in go4. However, the time axis is correct,
see picture.
Entry  Sat Apr 2 10:22:21 2022, Rui-Jiu Chen, Ragan, General, Beam is in the ESR 
Primary beam is in the ESR now. Markus and the team are tuning the ESR.
Entry  Sun Apr 3 18:41:11 2022, Konstantin and Rodolfo, Laser, Beam Position Stabilization MRC_Konfiguration_MitMainAmp_03-04-2022.pngMRC-ControllerSetting_03-04-2022.jpgFG_SettingsMRC_03-04-2022.jpgTriggerSignals_f_MRC_04-04-2022.PNG
We (Konstantin and I) have optimized the TEM "laser-beam position stabilization".

- I took some pictures (screenshots) about the current setting*.
Entry  Mon Apr 11 22:33:16 2022, Carsten, General, Backup of data to the external RAID disks 
 
Entry  Sun Apr 10 15:08:42 2022, Carsten, DAQ, Backup of Data from 1rst Scanrange to extrenal RAID1 HDDs 
I just performed a backup of all data (+log-Files) that were collected until now to the two RAID HDDs.

For DAQ1: /media/sdc2 - last file 229Thor7889.lmd. Please note, that the naming sceme on DAQ1 is inconsistent - please look for the filenumnbering
Entry  Mon Apr 4 16:26:04 2022, Carsten, DAQ, Backup Harddisk /External Disk 
Since we cannot write on lustre, as a temproal solution two RAID 1 (mirror) USB hard disks  with cpacity 6 TB each are installed.
The disk on the lxg1297 the disk can be accessd at /meida/sdd2
an on the lxg0155 at /media/sdc2
Entry  Fri Apr 1 16:46:33 2022, Carsten, Detectors, All pressuzied air drives are tested now and are working properly 
All pressuzied air drives are tested now and are working properly
Entry  Mon Apr 11 18:46:31 2022, Rodolfo, Sarper and Konstantin, Laser, Alignment-check MRC_Konfiguration_MitMainAmp_04-11-2022.png
We cross-checked the laser-ion alignment. The horizontal position was optimized. However, 
since the laser beam is much larger than the ion beam, this was not an issue for measurements, which
have been performed during the last shifts.