HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 11 of 12  Not logged in ELOG logo
New entries since:Thu Jan 1 01:00:00 1970
ID Date Author Category Subjectdown Text Attachments
  30   Wed Mar 23 16:16:42 2022 V. HannenDetectorsControl software for XUV and copper mirror detectorAttached you find a manual for the software
used to control the movement of the XUV detector
and the copper mirror detector. 
 Manual.pdf 
  42   Thu Mar 31 15:53:50 2022 KonstantinDetectorsControl software for XUV and copper mirror detector> Attached you find a manual for the software
used to control the movement of the XUV detector
and the copper mirror detector. 
 XUV_Cu_GUI.png 
  145   Fri Apr 8 00:06:37 2022 PatrickLaserConnection to the laser pcTo login to the laser pc use the command

xfreerdp -g 1920x1080 -u atplaser atppc023.campus.gsi.de
  
  228   Thu Apr 14 12:27:18 2022 Sebastian, MaxDetectorsConnection to XUV / Cu reestablished!The connection to the XUV and Cu were lost
during the nightshift.
  
  208   Mon Apr 11 11:05:35 2022 Sebastian, KristianLaserCheck laser powerwe checked the UV laser power at 10:15 am.
It was only 8.5 - 9 mJ. Pumping power was
460 mJ, which is the maximum output of the
  
  16   Wed Mar 16 08:31:52 2022 KristianDAQCheck cables and timingKonstantin and I generated a signal in the
Messhütte and sent it to the ESR. 
There, we used a 44m BNC cable that was sufficently
  
  213   Mon Apr 11 22:14:51 2022 Konstantin, SarperLaserChanging of the wavelength rangeIt is planned to change the scan range of
the laser wavelength from 322.41 - 322.0
nm to 322.01 - 321.6 nm @ 4 a.m. 
  
  25   Mon Mar 21 16:33:23 2022  DAQChanging code of go4We agreed to indicate changes in the go4 analysis
code according to the
following scheme
  
  26   Mon Mar 21 17:03:47 2022  DAQChanging code of go4Correction: Comments in C/C++ start with //
, i.e. forward slash
  
  184   Sat Apr 9 14:15:44 2022 Kristian, Max, KonstantinDAQChange in LV codeWe changed the LV code so that the Cobra Set
Wavelength is permanently sent. Before it
was only sent once at the beginning of each
  
  159   Fri Apr 8 11:02:04 2022 DW, YL, RSS, SL Change h=2 to h=1After changing to h=1
The frequency manipulation #5: f=242.021487MHz
(124th harmonic) [no bunching]
  
  147   Fri Apr 8 01:48:57 2022 PatrickDAQBugged Trending plots?The wavelengths/frequencies shown in the graph
in the labview window do not match the wavelengths/frequencies
in go4.
 2022-04-08_Cobra_set_wavelength.png 
  178   Sat Apr 9 04:40:01 2022 PatrickDAQBugged Trending plots?The problem from yesterday (ID:147) still
persists. All the plots (not only the labview
stuff) comes in too late in go4. However,
 2022-04-09_Cobra_set_wavelength2.png 
  64   Sat Apr 2 10:22:21 2022 Rui-Jiu Chen, RaganGeneralBeam is in the ESRPrimary beam is in the ESR now. Markus and
the team are tuning the ESR.
  
  82   Sun Apr 3 18:41:11 2022 Konstantin and RodolfoLaserBeam Position StabilizationWe (Konstantin and I) have optimized the TEM
"laser-beam position stabilization".
 MRC_Konfiguration_MitMainAmp_03-04-2022.pngMRC-ControllerSetting_03-04-2022.jpgFG_SettingsMRC_03-04-2022.jpgTriggerSignals_f_MRC_04-04-2022.PNG 
  214   Mon Apr 11 22:33:16 2022 CarstenGeneralBackup of data to the external RAID disks    
  199   Sun Apr 10 15:08:42 2022 CarstenDAQBackup of Data from 1rst Scanrange to extrenal RAID1 HDDsI just performed a backup of all data (+log-Files)
that were collected until now to the two
RAID HDDs.
  
  89   Mon Apr 4 16:26:04 2022 CarstenDAQBackup Harddisk /External DiskSince we cannot write on lustre, as a temproal
solution two RAID 1 (mirror) USB hard disks
 with cpacity 6 TB each are installed.
  
  55   Fri Apr 1 16:46:33 2022 CarstenDetectorsAll pressuzied air drives are tested now and are working properlyAll pressuzied air drives are tested now and
are working properly
  
  211   Mon Apr 11 18:46:31 2022 Rodolfo, Sarper and KonstantinLaserAlignment-checkWe cross-checked the laser-ion alignment.
The horizontal position was optimized. However,
 MRC_Konfiguration_MitMainAmp_04-11-2022.png 
ELOG V3.1.5-fc6679b