HOME ESR EXPERIMENTS LABS etc
E121 E127 E132 E125 E143 laser_cooling_2021 E142 Ê128 E146 E0052 E0018 E0028 E0038
  Nuclear hyperfine mixing in 229Th89+, Page 8 of 12  Not logged in ELOG logo
Entry  Thu Apr 7 01:19:05 2022, Patrick, Laser, Laser scanning 2022-04-07_Wavemeter_during_scan.png2022-04-07_Wavemeter_during_scan2.png2022-04-07_Wavemeter_during_scan3.png2022-04-07_Wavemeter_during_scan4.png
We did some laser scans. The wavemeter shows spikes during scans. This may be just while the frequency changes. See picture.
Entry  Fri Apr 8 17:57:45 2022, Konstantin, DAQ, Laser scanning Artifacts_in_PMT_MiddleAndNorth.png


[TABLE border="1"]
Entry  Sat Apr 9 03:27:47 2022, Patrick, DAQ, Laser scanning does_not_write_data_to_file.png
DAQ1: lxg1927:/data.local2/BeamTimeTh22/
DAQ2: lxg0155:/data.local2/E142/
LMD file name DAQ1:229Thor
Entry  Thu Apr 14 19:46:46 2022, Sarper & Konstantin & Rodolfo, Laser, Laser power 
We checked the laser power before starting the new scan range.

- Seed energy before Cobra @ 532 nm: 513 mJ (before 499 mJ).
Entry  Sun Apr 3 18:52:30 2022, Konstantin, Calibration, Laser ion beam overlap 
We measured vertical and horizontal ion beam positions. Unfortunately, the horizontal scraper positions can not be manipulated
by the "Device Control" software. Robert Boywitt has supported us a lot to get the drives moving by using the expert software on
a local control PC, which can only be remotely accessed from beapc032 with the usual experiment account "atplaser". In the first
Entry  Fri Apr 8 08:17:52 2022, Sebastian, Laser, Laser Ext Trig is working upperDualTimerSettings.JPGlowerDualTimerSettings.JPGLampSyncToQSwitchTrig.JPGTriggerPulseTrain.JPG
We (Max, Kristian, Danyal, me) fixed the "external trigger" problem.

1.) The delay between lamp sync and Q-switch trigger was too long. The delay must be 200µs (3rd picture)! 
Entry  Wed Apr 6 13:32:57 2022, Max, Sebastian, DAQ, LabView Cobra Channel List 
channel 0: linux time (epoch time)
channel 1: ms timer
channel 2: E-Cooler Voltage(Ohmlabs)
Entry  Wed Apr 6 19:39:08 2022, Ken Ueberholz , Detectors, LED installed  20220406_193541.jpg20220406_193439.jpg
The UV-LED of Münster was connected over 
channel 8 to the Messhütte. 6V are 
supplied by the power supply (picture 2). 
Entry  Sat Apr 9 02:55:38 2022, Carsten, Accelerator, Kühlerausfall und Gründe dazu 
Wir hatten heute Abend eine Kühlerausfall, der uns mehrere Stunden beschäftigt hat, weil  gem. Anzeige in Device Control kein Netzteil  mit „rot“ angezeigt/ausgefallen
 war (siehe unten).
Nach Rufbereitschaft Serge, dann Regina sowie Controls konnte zunächst gefunden werden, dass das Netzteil einer Clearingelektrode (GECEKD2D) keinen korrekten
Entry  Thu Apr 7 09:58:55 2022, Ragan, Yuri, Danyal, Accelerator, Kicker problem solved 
The kicker problem is solved and the beam is back in the ESR.
Entry  Mon Apr 11 07:54:37 2022, Danyal, Alexandre, Kristian, Sebastian, Accelerator, Jump in E-cooler voltage 
We saw a jump in the E-cooler voltage at about 7:50. 
jump from 209619 to 209610 V 
Entry  Wed Mar 30 09:27:15 2022, Rodolfo, Accelerator, Issue? Scrapers at E-Cooler Schrittmotorsteuerung_ECooler.JPG
Carsten* forwarded me an E-Mail from Markus yesterday. "Betreff: Scraper im ESR Elektronenkühler"

- Markus has tried to get moving the scrapers at E-Cooler last week. But he got some issues.
Entry  Mon Apr 11 10:17:01 2022, Danyal, Accelerator, Interlock - reset  
10:17 
Wie heutemorgen in der Sitzung (morning briefing) vereinbart, 
führt Herr Florenkowski einen Interlock und danach einen Reset von E02MK durch. 
Entry  Tue Apr 5 12:17:12 2022, Ragan, Rui-Jiu, DAQ, Instructions to start and stop NTCAP Start_data_taking.pdfStop_data_taking.pdfStart_data_taking.pngStop_data_taking.png
Attached are the instructions to start and stop data taking using the NTCAP.
Entry  Thu Apr 7 19:13:26 2022, Konstantin, Patrick, Calibration, How to find the correct laser position 
In order to achieve the correct laser ion beam superposition one needs to do the following steps:

[LIST=1]
Entry  Thu Apr 7 05:23:50 2022, Patrick, DAQ, How To Start MBS for DAQ2 (Carstens DAQ) 
(MBS server should be running at the LXG0155 machine. If not you will get an error message. Then start the server - last command in console)

Just enter the following commands in the console of any PC
Entry  Thu Mar 31 22:19:14 2022, Kristian, DAQ, How To Start MBS 
(MBS server should be running at the LXG1297 machine. If not you will get an error message. Then start the server - last command in console)

Just enter the following commands in the console of any PC
Entry  Thu Mar 17 17:37:49 2022, Rodolfo, Accelerator, High voltage dividers for E-Cooler PTB_Spannungsteiler_Mar2022.jpg
Two dividers, from PTB-Braunschweig, have been deliver today. We will use them to monitor the electron-cooler voltage in situ.

- PT120 (up to -120 kV) with scaling factor: 12003.341, and
Entry  Fri Apr 8 05:46:35 2022, V. Hannen, Detectors, High background rate in Cu PMT points to light leak in ESR or active pressure gauge 
The background rate of the Cu mirror PMT is only about 300 cps when the mirror is in the parking position but ca. 7000 cps when in the beam position, even
if no beam is present in the ESR. This was noticed when we had an "empty injection" into the ring, causing the Cu mirror to drive into the beam position
with no ions present. 
Entry  Thu Mar 31 11:49:54 2022, Konstantin, Detectors, HV-Supply of particle detectors  
We cross-checked the cabeling of the particle detectors north and south. Particle detector south is connected to channel [B]HV5[/B] at the yellow "ESR Messplatz
III" patch-panel. Particle detector north is connected to channel [B]K5[/B] at the green "ESR Messplatz II" patch-panel. Red high voltage power-supply
is used to control the voltage.
ELOG V3.1.5-fc6679b